TNPDCL- Thiruvannamalai Region - TEDC-Construction of Control room building, electrification, water supply, bore well, sanitary arrangement, providing transformer plinths, cable duct, filling, fencing arrangements with retaining wall, culvert, road work and other related civil works for the establishment of new KILVELIYUR 33/11 KV Substation with 1X8 MVA Power Transformers in Tiruvannamalai EDC- Turnkey basis – By E-tendering; 1. Control room building 2 Clearing juliflora jungle with uprooting including all labour lead lift etc., complete. 3 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. 4 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. 5 Earthwork excavation in medium rock and dense medium rock requiring blasting. (As instructed by the Engineer at site) 6 Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.(As instructed by the Engineer at site) 7 PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete. 8 PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing, etc., complete. 9 RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete 10 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. A. COLUMN UP TO BASEMENT 11 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. B. GRADE BEAM 12 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. C. COLUMN UP TO BASEMENT 13 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. D. COLUMN UP TO BASEMENT 14 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. D. COLUMN UP TO BASEMENT 15 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. F. COLUMN UP TO BASEMENT 16 RCC 1: 1.5:3 using 12-20mm HBS metal (machine crushed) metal for concretewith centering shuttering form work including cost of all material, lead, lift, etc, complete, but excluding cost of steel reinforcement. G. COLUMN UP TO BASEMENT 17 Brickwork in CM 1:5 mix using II class chamber bricks of size 9x 4 3/8x23/4 for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. A.BASEMENT 18 Brickwork in CM 1:5 mix using II class chamber bricks of size 9x 4 3/8x23/4 for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. B.SUPERSTRUCTURE 19 Flooring with PCC 1:3:6 mix using 40 mm HBS metal for flooring150mm thick (machine crushed metal) including cost of all materials labour lead, lift, etc., complete. 20 RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for Control Room flooring concrete 100 mm thick with formwork including cost of all materials, labour lead, lift, etc., complete. but excluding cost of steel reinforcement 21 RCC1:1 1/2:3 using 12mm to 20 mm HBS metal (machine crushed) for roof slab concrete of 130 mm thick with formwork including cost of all materials, labour, lead, lift, centring shuttering , curing, etc., complete. But excluding cost of steel reinforcement. (Ground roof slab) 22 Plastering with CM.1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, labour, lead, lift, etc., complete. 23 Plastering with CM. 1:3 mix 12 mm thick for fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete. 24 White washing two coats with White cement approved qualityover a primary coat for ceiling, exposed surfaces of wall, beam, slab, sunshade, lintel, etc, including cost of all materials, lead, lift, etc, complete. 25 Colour washing two coats with Exterior Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor outside wall including cost of all materials, labour, lead, lift, etc., complete. 26 Colour washing two coats with Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor inside wall including necessary plaster of parrys two coats cost of all materials, labour, lead, lift, etc., complete. 27 Providing UPVC (Un-Plasticized Polyvinyl Chloride) Door: Providing and fixing casement doors fabricated from un-plasticized polyvinyl chloride (uPVC) sections. Profiles: The profiles should be three chamber system which provides high insulation properties with outer frame 60mm x 55mm with an outer wall thickness of 2.4mm. The window unit should be designed with all corner joints mitred and fusion welded. Windows should be steel reinforced with 25 x 24 x 25mm steel reinforcement with a thickness of 1mm to have dimensional stability. The sash should be of 60 x 102mm. The mullion should be of 60 x 74mm. The profiles should have co-extruded seals. 28 Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work. (As instructed by the Engineer at site) 29 Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Louvered Ventilators of from the profile the size of outer frame 60mm x 58mm and shutter profile size of 60 x 78mm both profiles are reinforced with GI/1mm 125GSM and 100% corrosion free, the profile are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with all over the edges of frame and shutter. The corners and joints should be welded and cleaned. Radiations pin headed glass 4mm thick should be provided in the louvers. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The ventilator should be got approved from the Executive Engineer before use on work. 30 M&F in position of PVC door shutter made ofSingle Panel laminated Plastic sectionand PVC extracted shutter frame of size 24 x 60 mm including cost of 3 nos 85 mm butt hinges for single leaf door of size 0.80 x 2.00 m with 2 No aluminium handle and 2 nos 150 x 2 mm aluminium towel bolt hinges etc., complete. 31 Supplying and fixing of two side polished 20-30mm tk.cuddapah slab for cupboard, kitchen platform etc., including cost of all materials, labour, lead, lift, etc., complete 32 Dadooing with glazed tiles of best approved quality of make johnson, neycer etc, over CM 1:3, 12mm thick including cost of all materials, labour, lead, lift, etc., complete. 33 Flooring with approved Vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make)laid in cement mortar 1:3 - 20mm thick including pointing with same coloured cement using 0.4kg/sqm, finishing the joints, including cost of all materials, water charges,labour, lead, lift, etc. complete. 34 Flooring with approved acid proof tiles over cement mortor 1:3 20mm thick in floor including pointing with white cement finishing the joints flush pointing the surface etc including cost of all materials, water charges labour, lead, lift, etc. complete.(Battery Room) 35 Providing one coarse of pressed tiles of 20x20x2cm embedded with CM 1:3 mixed with crude oil at 10% by weight of cement and pointed with same oiled mortor including all material, labour, lead, lift etc complete 36 Supplying and fixing in position of GI angle 50x50x6mm@ 75cm c/c to the required length for supporting the cable in the duct, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the GI angle required length and labour for fixing etc., complete. 37 Supplying and fixing in position of MS channel 110 x 50mmrequired length for fixing the cable duct side wall, as per the direction of site Engineer including cost of all materials, lead, lifts, and cutting the MS channel required length and labour for fixing etc., complete. 38 Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixingtightening etc. including earth work excavation and refilling trench etc complete. A.110MM DIA PVC PIPE 39 Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixingtightening etc. including earth work excavation and refilling trench etc complete. B.110MM DIA PVC BEND 40 Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixingtightening etc. including earth work excavation and refilling trench etc complete. C.110MM DIA PVC TEE 41 Supplying and laying PVC pipe 110 mm outer die 6kg / cm2 ISI make for laying the Sewer line including cost of pvc pipe coupling labour for cutting laying fixingtightening etc. including earth work excavation and refilling trench etc complete. D.110MM DIA PVC COWL 42 Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. 43 Supplying and fixing in position of 25mm dia pvc pipe of 10 kg/sq.cm pressure from the approved manufacturer apollo, chemplast, avanplast, valarmathi, usha, vimal etc., confirming to IS 4985 of 1968, 4984 of 1970 including cost of all special fixtures labour lead, lift, etc., complete. 44 Supplying and fixing of 1000 lit capacity sintex tank of approved quality including cost of labour for fixing etc., complete 45 Supplying and fixing of 15mm high quality brass Chromium plated screw down bib cock (Heavy Type) such as leader, zeolite and zenith of any other approved quality cost of all materials, labour, lead, lift, etc., complete. 46 Refilling with excavated soil other than sand in foundation and sides of masonry, consolidation as per std. specn. With water including all labour, lead, lifts. etc, complete. 47 Removing the excess earth to the basement area as instructed by field engineer including all labour lead, lift, etc., complete. 48 Supplying and filling of Red gravel in the basement filling stacking to the department gauge, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc, complete. 49 Supplying and fixing of RCCB safe trip of appd LEGRAND , ISI make , 25amps with suitable box including cost of all materials labour, lead, lift, etc., complete as per standard specification. (As instructed by the engineer at site) 50 Wiring with 2x1.50 sq.mm PVC unsheathed copper multistandcable of 1100 V grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with TW switch box in flush with wall covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earthwire connection of 14 SWG TC wire for light and Fan points(SD 23) 51 Wiring with 2x1.5 sq.mm (22/0.3) PVC insulated SC unsheathed Cu.conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories in in flush with wall, with 150mm x 100mm x 113mm TW switch box with 3 mm thick hylum sheet cover for 5 A 3 Pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC Plug point. (As instructed by the engineer at site) 52 Supply and fixing of 40 W LED industrial type fitting INDURA (Philips /Crompton) complete with conduit pipe suspension, with PVC unsheathed copper leads from the terminals to the fittings with LED lamps. (As instructed by the engineer at site) 53 Wiring with 2x4 sq.mm Pvc unsheathed copper multistand cable of 1100 V grade in suitable pvc rigid pipe in wall or ceiling with pvc accessories with 150mm x 100mm x 75mm T.W switch box in flush with wall covered with 3mm tk. Hylum sheet for 15 amps 3pin flush typenon interlocking C.S plug including pin top with painting of suitable colour with continuous earth wire connection of 14 SWG T.C. wire for plug point.(As instructed by the engineer at site) 54 Supplying and fixing of 23 cm angular holderwith EI fancy shade glass with 9 W LED bulb. 55 Supplying and fixing of 1400mm (56) sweep AC ceiling fan with regulator with Suitable down rod on the existing clamps of crompton / rally / Orient including cost of all materials lead, lift etc., complete. SD(114) 56 Supplying and fixing of water tight Bulk head fitting with guard(philips, bajaj, k-lite, cromption greaves) suitable for incandescent lamp with guard and 8W LEDbulb. 57 Supplying and fixing of 375mm (15) sweepheavy duty AC Exhaust fan with MS/Fibre louvers shutters arrangements of approved ISI quality complete with necessary wall opening and making good of the wall 58 Supplying and fixing of digital LED Wall Clock of approved quality such as Ajantha / Seiko/ Citizen etc including transport, fixing charges etc complete. 59 Supplying and fixing of 4pole32 Amps Isolator 1 No with MCB box 4 poleincludingterminal block for testing purpose at Controlroom, cost of all materials, lead, lift, labour charge, etc., complete. 60 Earthing as per standard specification complete with necessary masonry work. SD(221) 61 Providing and fixing sanitary fitting consisting of Neycer / parryware of oriya pattern Water Closet 45cm with P/S trap connecting with PVC ventilating shaft and Y bend complete, including cost of all material, labour, lead, lift, etc, complete. 62 Providing and fixing sanitary fitting consisting of Neycer / parryware of European Water Closet with P or S Trap with Double Flapped Seat and Seat Cover with Brass Hinges and 10 litre capacity PVC Low Level Flusing Tank with all internal fittings including cost of all material, labour, lead, lift, etc, complete. 63 Supplying and fixing of best quality of mirror of size 300 x450mm mirror with soap tray, towel stand, screw and fixing near the wash basin, teak wood round block, including cost of all material,labour, lead, lift, etc, complete. 64 Supplying and fixing 100x50mm PVC floor trap in bath room with one pvc door bend shoe of 50mm.dia including cost of all etc., complete 65 Supplying and fixing of wash basin of size 500x400 mm of approved quality neycer / parrys ISI including cost of wash basin with pedestal cock fixing using rag bolt and nut 15mm dia pvc connecting hose and outlet using 50mm dia pvc waste water pipe for outlet CP angle valve with all accessories including cost of all materials, labour, lead, lift, etc., complete. 66 Supplying and fixing of approved quality of Brass Chromium plated towel rod of size 90cm and fixing the same over the teak wood round block and soap tray (pvc) in bath room including cost of all materials, lead, lift, etc., complete. 67 Providing PVC down fall pipe using 110mm dia 4 Kg / Sqcm, PVC pipe and pvc clamp line supreme etc., including fixing PVC washer type door bend & shoe, in correct position and connecting from the roof slab including cost of all materials, labour, transport lead, lift, etc., complete, including pvc accessories and washers. 68 Construction of septic tank arrangements with inspection chambers including cost of all materials, labour, transport lead, lift, etc., complete. 69 3. Plinth for breakers, Plinth for structures:- 70 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. 71 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. 72 Earthwork excavation in medium rock and dense medium rock notrequiring blasting. 73 Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. 74 PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete. 75 PCC 1:2:4 using 12-20mm HBS metal forstructureconcrete with form work including cost all materials lead, lifts, labour curing etc complete 76 PCC 1:2:4 using 12-20mm HBS metal for support structures concrete with out formwork including cost all materials lead, lifts, labour curing etc complete 77 RCC 1:1.5:3 using 12-20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour, lead, lift, etc., complete. 78 Plastering with CM. 1:3 mix 12mm thickincluding cost of materials, labour, lead, lift, watering, curing, etc., complete. 79 Colour washing two coats with Exterior Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor outside wall including cost of all materials, labour, lead, lift, etc., complete. 80 Assembling of various plinth templates for providing concrete including transporting from one plinth toanother, alingningfixing to corrrect leveland dismatlingthe templete after concreting including cost of labour, cost of template, lead, lift, etc., complete. 81 Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. 82 4. Plinth for lighting pole:- 83 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. 84 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. 85 Earthwork excavation in medium rock and dense medium rock notrequiring blasting. 86 Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. 87 PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete. 88 PCC 1:2:4 using 12-20mm HBS metal forstructureconcrete with form work including cost all materials lead, lifts, labour curing etc complete 89 PCC 1:2:4 using 12-20mm HBS metal for support structures concrete with out formwork including cost all materials lead, lifts, labour curing etc complete 90 Plastering with CM. 1:3 mix 12mm thickincluding cost of materials, labour, lead, lift, watering, curing, etc., complete. 91 Colour washing two coats with Exterior Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor outside wall including cost of all materials, labour, lead, lift, etc., complete. 92 Assembling of various plinth templates for providing concrete including transporting from one plinth toanother, alingningfixing to corrrect leveland dismatlingthe templete after concreting including cost of labour, cost of template, lead, lift, etc., complete. 93 5. Yard structure:- 94 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. 95 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. 96 Earthwork excavation in medium rock and dense medium rock not requiring blasting etc., complete. 97 Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. 98 PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete. 99 PCC 1:2:4 using 12-20mm HBS metal for structure concrete without form work including cost all materials lead, lifts, labour curing etc complete 100 PCC 1:2:4 using 12-20mm HBS metal forstructureconcrete with form work including cost all materials lead, lifts, labour curing etc complete 101 Plastering with CM. 1:3 mix 12mm thickincluding cost of materials, labour, lead, lift, watering, curing, etc., complete. 102 Colour washing two coats with Exterior Plastic Emulsionpaint over one coat of Plastic Emulsion primerfor outside wall including cost of all materials, labour, lead, lift, etc., complete. 103 6. Yard Filling:- 104 Supplying and filling ofgravel in the yard area, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc, complete. 105 8. Cable duct:- 106 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. 107 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. 108 Earthwork excavation in medium rock and dense medium rock notrequiring blasting. (As instructed by the Engineer at site) 109 Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.(As instructed by the Engineer at site) 110 PCC 1:3:6 mix using 40mm HBS machine crushed metal without formwork including cost of all labour, materials, lead, lift, curing, etc., complete. 111 RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete. 112 Brickwork in CM 1:5 mix using II class chamber bricks of size 9x 4 3/8x 23/4 for basement and superstructure including cost of all materials, labour, lead, lift, curing, etc., complete. (As instructed by the Engineer at site) 113 Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. 114 RCC 1:1.5:3 using 12 to 20 mm HBG machine crushed metal for Precast slab ,including cost of cement and all lead, lift, curing, etc., complete but excluding cost of steel reinforcement. (As instructed by the Engineer at site.) 115 Plastering with CM. 1:3 mix 12mm thick for fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, lead, lift, watering, curing, etc., complete. 116 Colour washing two coats with Cement paint approved colour over Primary coats for out side wall including cost of all materials, lead, lift, labours, etc, complete. 117 Labour charges for transporting from casting yard to curing tank, curing tank to cable duct , aligning and laying ofRCC pre cast slab as directed by the site engineer including all labour lead lifts etc complete 118 Supplying and fixing of MS angle for cable duct including aliging in position and including all labour lead lifts etc complete. 119 Supplying and laying UPVC pipe 100 mm outer dia 6kg / cm2 ISI make for cable duct including cost of UPVC pipe, labour for cutting laying fixingetc complete(As instructed by engineer at site) 120 9. Power transformer plinth 121 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m - In Hard Gravely Soil 122 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-MR and DMR not requiring blasting 123 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-Hard rock requiring blasting 124 PCC 1:2:4, using 20mm HBG machine crushed metal for foundation paddingconcrete without form work includingcostof cementandallmaterials,curing,lead,liftetc.,complete. 125 PCC 1:2:4, using 20mm HBG machine crushed metal for foundation paddingconcrete with form workincludingcostof cementandallmaterials,curing,lead,liftetc.,complete. 126 RCC 1:1.5:3 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including costof cement all materials,labour,lead lift, curing etc., complete. - With form work 127 Plasteringwith CM1:3, 12mmthick for structure portion above GL including cost of all materials, labour, lead, lift etc., complete. 128 Colourwashingtwocoatsoutsidewalls byusing Exterior emulsion paint over a primer one coatof approved quality with suitable colourincluding cost of all materials, labour, lead, lift, curing etc., complete. 129 Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. 130 Supply andfixing of MS rails (90 LBS )in transformer plinth to requiredlevelandalignmentasdirectedbythe engineer incharge at site with all labour lead lift etc complete 131 13. Road work 132 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m - In Hard Gravely Soil 133 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-MR and DMR not requiring blasting 134 WMM 1:3:6 mix using 40mm HBS machine crushed metal for road including cost of all labour, materials, lead, lift, curing, etc., complete. 135 PCC 1:3:6, using 40mm HBG machine crushed metal forfoundationpaddingconcreteincludingcostof cementandallmaterials,curing,lead,liftetc.,complete. - WITH OUT FORM WORK 136 PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including costof cement all materials,labour,lead lift, curing etc., complete. - PCC Curb wall with form 137 RCC1:1.5:3,using12to20mmHBGmachine crushed metal for continuous lintel, sunshade, slab, beams with formworkincluding cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement.( By using mixer machine and vibrators) - Road 138 Supplying and fabrication and placing in position MS/ RTSsteel reinforcementforRCCworksincluding labourforcuring,bending,tyingandfixingin position includingcostofallmaterials,lead,lift, binding wire etc., complete. 139 Plasteringwith CM1:3, 12mmthick for ceiling including cost of all materials, labour, lead, lift etc., complete. 140 Colourwashingtwocoatsoutsidewalls byusing Exterior emulsion paint over a primer one coatof approved quality with suitable colourincluding cost of all materials, labour, lead, lift, curing etc., complete. 141 14. Entrance culvert and road crossing culvert 142 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m inhard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. 143 Earthwork excavating and depositingon bank withinitial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. 144 Earthwork excavation in medium rock and dense medium rock notrequiring blasting. (As instructed by the Engineer at site) 145 Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete.(As instructed by the Engineer at site) 146 PCC 1:3:6 mix using 40mm HBS machine crushed metal without formwork including cost of all labour, materials, lead, lift, curing, etc., complete. 147 RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, lift, etc., complete. 148 Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. 149 RCC wall 1:1.5:3 using 12-20mm HBG metal for Culvert wall with form work including cost of all materials, form work including cost of all materials, labour, lead, lift, etc. complete. 150 15. Chain link Fencing 151 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m - In Hard Gravely Soil 152 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-MR and DMR not requiring blasting 153 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-Hard rock requiring blasting 154 PCC 1:3:6, using 40mm HBG machine crushed metal forfoundationpaddingconcreteincludingcostof cementandallmaterials,curing,lead,liftetc.,complete. - WITH OUT FORM WORK 155 PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for plinth with formwork including costof cement all materials,labour,lead lift, curing etc., complete. - PCC wall with form 156 supplying,fabrication,galvanising and fixing of GI angles for fence post including cost of all materials lead and lift etc., complete 157 Supplying and laying of chain link fencing of 2 x 2 of 10 Gauge galvanised ironincluding cost of all materials,labour, lead, lift etc complete as directed by the engineer at site. 158 17. Retaining wall 159 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m - In Hard Gravely Soil 160 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-MR and DMR not requiring blasting 161 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-Hard rock requiring blasting 162 PCC 1:3:6, using 40mm HBG machine crushed metal forfoundationpaddingconcreteincludingcostof cementandallmaterials,curing,lead,liftetc.,complete. -WITH OUT FORM WORK 163 RCC1:1.5:3,using12to20mmHBGmachine crushed metal for column, plinth beam and grade beam with out form work includingcostofcementandalllead,lift,curing etc.,completebutexcludingcostofsteel reinforcement. -column and footing below ground level 164 RCC1:1.5:3,using12to20mmHBGmachine crushed metal for retaining wall with form work includingcostofcementandalllead,lift,curing etc.,completebutexcludingcostofsteel reinforcement.- column upto ground level 165 Supplying and fabrication and placing in position MS/ RTSsteel reinforcementforRCCworksincluding labourforcuring,bending,tyingandfixingin position includingcostofallmaterials,lead,lift, binding wire etc., complete. 166 Plasteringwith CM1:3, 12mmthick for walls including cost of all materials, labour, lead, lift etc., complete. 167 Colourwashingtwocoatsoutsidewalls byusing Exterior emulsion paint over a primer one coatof approved quality with suitable colourincluding cost of all materials, labour, lead, lift, curing etc., complete. 168 18.Yard filling additional depth 169 Supplying and filling of gravel in the yard area, labour for filling, watering and consolidation, including cost of all materials, lead, lifts, labour, etc, complete. 170 19.Water supply arrangements 171 Drilling bore well of 150mm dia 6” in all soils, hard rock etc., including transporting of machineries with equipments and all necessary T & P’s labouretc.,completeas per specification -Upto 100 Mts 172 Drilling bore well of 150mm dia 6” in all soils, hard rock etc., including transporting of machineries with equipments and all necessary T & P’s labouretc.,completeas per specification -100-200 Mts. 173 Supply and erection of 180mm (7”) dia rigid PVC casing pipe, having 6kg/cm² including cost all materials,lead, lift, re-boring the holes to required depth etc., complete with cover at the top of the bore well. 174 Supply and erection of 3 HP sumersiblemotor of any reputed makehaving ISI make withsingle phase(or) as approved by the Board Engineer at site to pump water to a height of 300mts.and delivery unit with foot valve v-belt arrangement including cost of all materials, labour, erection charges, 3 HP, 400/440V L&T makestarter to suit the sumersiblemotorincluding the cost of all materials, labour, lead and as per the instruction of Engineer in charge at site complete in all respects. 175 Supply and erection of 3 phase 30/32 Amps ICTP switch with fuse arrangements to suit the compressor with cost of all materials, labour, lead and lift etc., complete in all respects. 176 Supply and erection of 32mm diaUPVC pipe having ISI mark and as per IS 4985 2000 (10 Kg/CM²) in and outside of the bore well including cost of all materials, labour, lead,lift etc., complete. 177 Supplying and laying of 4 core 6 Sq mm power cable from nearest power pointto 3 HP motor including earth work excavation ,laying power cable in the pit and top covered with country bricks and refilling with excavated earth, lead. lift ,etc.complete 178 Charges for geophysical survey for invetigation of borewell point at various location in the SS site 179 20.Watering arrangement for earth pits 180 Providing and laying PVC high density pipe including costofallmaterialsviz.bend,labourforcutting threading fixing and tightening necessary excavation etc., complete. -40 mm dia pipe.10kg/cSq.m 181 Providing and laying PVC high density pipe including costofallmaterialsviz.bend,labourforcutting threading fixing and tightening necessary excavation etc., complete. -32 mm dia PVC 10 kg 182 Providing and laying PVC high density pipe including costofallmaterialsviz.bend,labourforcutting threading fixing and tightening necessary excavation etc., complete. -20 mm dia PVC 10 kg 183 SupplyingandfixinginpositionofGMgatevalve best qualityincluding cost of all special fixtures lead, lift,etc., complete. -40 mm dia GM Gate valve 184 SupplyingandfixinginpositionofGMgatevalve best qualityincluding cost of all special fixtures lead, lift,etc., complete. - 32 mm dia gate valve 185 Supplyanderectionof20mmPVCTapforearth pits. 186 21. Provision of sand drum 187 Provision of Sand drum for the each power transformer cost of Material and transport charges etc 188 22. Provision of one load of sand 189 Provision of one Load of Msand at the substation including cost of Material and transport charges etc (One load) 190 23. Filling metal 191 Supplying and filling ofstone chips 12-20 mm HBG metal with required thick all lead and lift including and all other T&P etc., complete. 192 Supplying and filling ofstone dustwith required thick all lead and lift including and all other T&P etc., complete. 193 25. Entrance gate 194 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m - In Hard Gravely Soil 195 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-MR and DMR not requiring blasting 196 Earthworkexcavationinalltypeofsoilswithan initial lead of 10m and lift of 2m-Hard rock requiring blasting 197 PCC 1:3:6, using 40mm HBG machine crushed metal forfoundationpaddingconcreteincludingcostof cementandallmaterials,curing,lead,liftetc.,complete. -WITH OUT FORM WORK 198 Brickwork in CM 1:5 using chamber bricks for wing wall including cost of all materials,labour,lead,lift etc complete 199 RCC1:1.5:3,using12to20mmHBGmachine crushed metal for column, plinth beam and grade beam with out form work includingcostofcementandalllead,lift,curing etc.,completebutexcludingcostofsteel reinforcement. 200 RCC1:1.5:3,using12to20mmHBGmachine crushed metal for column, plinth beam and grade beam with form work includingcostofcementandalllead,lift,curing etc.,completebutexcludingcostofsteel reinforcement. 201 Supplying and fabrication and placing in position MS/ RTSsteel reinforcementforRCCworksincluding labourforcuring,bending,tyingandfixingin position includingcostofallmaterials,lead,lift, binding wire etc., complete. 202 Plasteringwith CM1:3, 12mmthick for walls including cost of all materials, labour, lead, lift etc., complete. 203 Colourwashingtwocoatsoutsidewalls byusing Exterior emulsion paint over a primer one coatof approved quality with suitable colourincluding cost of all materials, labour, lead, lift, curing etc., complete. 204 Supplying of 5 Mtrs wide MS grill gate and 0.90m wide MS wicket gate as Per drawing and as per direction of Engineer at site cost including all materials,T&P lead,lift Painting with two coats of approved enamel paint over one coat of red oxide primer paint etc complete 205 Supply and fixing of Entrance gate light with CFL bulb fittings including cost of all materials,labour etc., complete 206 Providing projected border of 10cm width for wing wall including cost of materials,labour,lead,lift etc., complete 207 25. Furnitures and computers 208 Steel clerks table42 x24x30 TANSI make 209 Steel S type chairTANSI make 210 Steel half bench L topof size 36x15x18 TANSI make 211 Steel stool of size 15x15x18 212 Steel side rack O type with 4 shelves including top and bottom forming 3 compartments of size 36x33x12 213 Steel senior plain cubboard with 4 shelves forming 5 compartments of size 78x36x19 214 Personal computer with monitor and laser printer