Tender For Construction Of Government Higher Secondary School Kitchen Shed, Gram Panchayat Mainawali, Panchayat Samiti Hanumangarh. - Excavation of soil up to a depth of 1.5 m in the foundation, trench, or drain, compacting the bottom, watering, tamping the sides, removing the excavated soil, filling the voids with soil again after filling the foundation, and disposing of the remaining soil up to a distance of 50 meters.2. In cement concrete foundations or floors, 40 mm nominal size stone aggregate (crusher broken)/brick aggregate is placed in a cement-sand mortar, in the ratio of 1 cement: 5 sand: 10 soil, and compacted, including tamping.3. Foundation and plinth are first-class brickwork in a cement-gravel mortar of 1:6 or 1:8, including filling the side gaps and tamping.4. Additional amount for masonry work in the superstructure up to a height of 4.5 meters from the plinth level.5. Supply and pouring of reinforced cement concrete of 1:2:4/1:1.5:3 cement concrete mix, including scaffolding for roof slabs, eaves, beams, lintels, etc., including tamping, leveling and leveling of the surface with 1:3 cement mortar, but the cost of steel and shuttering is separate.6. Cutting, bending, placement and fastening of iron for RCC work along with supply.7. Supply and fitting of 22 gauge plain GI sheet double-leaf doors in 25X25X3 mm conical iron frame in 40X40X3 mm conical iron frame along with fittings like horizontal sliding bolts, latches and catch strips etc.8. 22 gauge plain GI sheet Supply of sheet made window in which the entire frame is of 25 X 25 X 3 mm conical iron, 10 mm grill with Argal, 2 latches and 4 strips.9. Fitting and supplying 14 mesh, 24 gauge iron mesh in the iron window and fixing it with 20 X 3 mm beading and tightening it with screws. 10. Centering (shuttering) for RCC ceilings, slabs, balconies, lintels, etc., up to 4.5 meters in height, and removal, etc., as per specifications.11. Cement plastering of walls using a mixture of cement and gravel in a 1:6 ratio, including scraping the joints and regular wetting for 14 days.12. Flooring in a first-grade dry slab brickwork using a 12 mm thick mud mortar, filling the joints with mud and then applying a flat tip cement in a 1:3 ratio.13. Applying enamel paint in three layers to give an even shade, creating an even surface on new or old work.14. Iron work in grills/gates, etc., including cutting, mounting, and fitting of flat cornices, T-pieces, and channels.15 20 mm Polished Kota stone flooring over a 1:4 cement gravel mortar, including laying and grinding of skirting boards (minimum 3 times), and filling the joints with cement mortar.16 Supply and installation of 0.80 mm thick (22 gauge) corrugated iron sheets with steel J or L hooks and 8 mm diameter bolts and nuts, and bitumen washers (complete work). This does not include the cost of scissors and purlins.17 1.5 sq mm FR PVC insulated copper conductors for light points/fan points/exhaust fan points/call bell points using single core cables, modular switches, modular plates, suitable GI boxes, and 1.5 sq mm FR PVC insulated copper conductors for single core cables with earthing. Medium grade PVC conduit wiring in the ground/space as required.18 Supply and installation of GI boxes with modular plates and front covers in the ground/space. 3-pin 5/6 amp modular socket outlets and 5/6 amp modular switches, connections, etc. (for light plugs in non-residential buildings) as required.19 Earthwork: Filling, digging a pit along the road, lifting soil up to 1.5 meters and transporting it up to 50 meters, breaking up lumps, laying them in 25 cm layers, tamping, leveling, and cambering.20 Transportation of soil over various distances, including loading, unloading, and stacking of material. (Transport length will be calculated by the nearest route, not by road.)21 Putty22 Distempering work23 Name plate and photo24 Light work: Fen and others