}

Tender For Annual Maintenance Contract For Maintenance Of Electrical Equipments Falling Under Unit- 6, Ptps (Including Energized System Of Unit 1- To 4 And Unit-5) For A Period Of Two Years, khurd-Haryana

Haryana Power Generation Corporation Limited has published Tender For Annual Maintenance Contract For Maintenance Of Electrical Equipments Falling Under Unit- 6, Ptps (Including Energized System Of Unit 1- To 4 And Unit-5) For A Period Of Two Years. Submission Date for this Tender is 16-10-2025. Electrical Products Tenders in khurd Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

51270237
Tender For Annual Maintenance Contract For Maintenance Of Electrical Equipments Falling Under Unit- 6, Ptps (Including Energized System Of Unit 1- To 4 And Unit-5) For A Period Of Two Years
Tender
Indian
Haryana
Khurd
16-10-2025

Tender Details

Annual Maintenance Contract For Maintenance Of Electrical Equipments Falling Under Unit- 6, Ptps (Including Energized System Of Unit 1- To 4 And Unit-5) For A Period Of Two Years-- 1 Important Note: The Bidders shall fill 1st year rates in Row from Sl.no. 1.01 to 1.17 ,2nd year rates in Row from Sl.no. 2.01 to 2.17 and extension period rates from Sl no. 3.01 to 3.17. The Item at Sl no.1.01 , 2.01 & 3.01 are AMC work (Fixed monthly rate) and rest are ARC work (Unit rate). 2 1st Year Part-A Lump-sum rates per month for Part-A (Scope of work as per Annexure-II )The rates quoted should be lump sum per month includingwages,ESI, EPF,T&P, consumables etc. 3 1st Year Part-B Local shifting (with in plant) of LT motors both side & placing it on its foundation/proper position (bothside) including decoupling, coupling and alignment forAbove 2KW to 10 KW 4 Above10KW to 50 KW 5 Above 50 KW to 100 KW 6 Above100 KW to 180 KW 7 Laying of underground cables (depth Max upto 3 feet) including excavation, covering the cable with bricks & sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cables. Control cables (in mtr.) All size of control cables up to 10 Core 8 All size of control cables above 10 Core 9 Power cables (in mtr.) 2C/2C/4C up to size 25mm² 10 2C/2C/4C above size 25mm² & up to 50mm² 11 2C/2C/4C above size 50mm² & up to 70mm² 12 2C/2C/4C above size 70mm² & up to 150mm² 13 2C/2C/4C above size 150mm² & up to 240mm² 14 2C/2C/4C above size 240mm² 15 Laying of power cables in cable trench/overhead (in mtr.) 2C/2C/4C up to size above 95mm2 to240mm2 16 2C/2C/4C up to size above 240mm2 17 Supply of man power (in nos.) Skilled - Aman power 18 Semi-skilled -A manpower 19 2nd Year Part-ALump-sum rates per month for Part-A (Scope of work as per Annexure-II )The rates quoted should be lump sum per month includingwages,ESI, EPF,T&P, consumables etc. 20 2nd year Part-B Local shifting (with in plant) of LT motors both side & placing it on its foundation/proper position (bothside) including decoupling, coupling and alignment forAbove 2KW to 10 KW 21 Above10KW to 50 KW 22 Above 50 KW to 100 KW 23 Above100 KW to 180 KW 24 Laying of underground cables (depth Max upto 3 feet) including excavation, covering the cable with bricks & sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cables. Control cables (in mtr.) All size of control cables up to 10 Core 25 All size of control cables above 10 Core 26 Power cables (in mtr.) 2C/2C/4C up to size 25mm² 27 2C/2C/4C above size 25mm² & up to 50mm² 28 2C/2C/4C above size 50mm² & up to 70mm² 29 2C/2C/4C above size 70mm² & up to 150mm² 30 2C/2C/4C above size 150mm² & up to 240mm² 31 2C/2C/4C above size 240mm² 32 Laying of power cables in cable trench/overhead (in mtr.) 2C/2C/4C up to size above 95mm2 to240mm2 33 2C/2C/4C up to size above 240mm2 34 Supply of man power (in nos.) Skilled - Aman power 35 Semi-skilled -A manpower 36 3 Month Extension- Part-ALump-sum rates per month for Part-A (Scope of work as per Annexure-II )The rates quoted should be lump sum per month includingwages,ESI, EPF,T&P, consumables etc. 37 3 Month Extension- Part-B Local shifting (with in plant) of LT motors both side & placing it on its foundation/proper position (bothside) including decoupling, coupling and alignment forAbove 2KW to 10 KW 38 Above10KW to 50 KW 39 Above 50 KW to 100 KW 40 Above100 KW to 180 KW 41 Laying of underground cables (depth Max upto 3 feet) including excavation, covering the cable with bricks & sand and backfilling of soil taken out. All the material will be in the scope of the contractor except cables. Control cables (in mtr.) All size of control cables up to 10 Core 42 All size of control cables above 10 Core 43 Power cables (in mtr.) 2C/2C/4C up to size 25mm² 44 2C/2C/4C above size 25mm² & up to 50mm² 45 2C/2C/4C above size 50mm² & up to 70mm² 46 2C/2C/4C above size 70mm² & up to 150mm² 47 2C/2C/4C above size 150mm² & up to 240mm² 48 2C/2C/4C above size 240mm² 49 Laying of power cables in cable trench/overhead (in mtr.) 2C/2C/4C up to size above 95mm2 to240mm2 50 2C/2C/4C up to size above 240mm2 51 Supply of man power (in nos.) Skilled - Aman power 52 Semi-skilled -A manpower

Key Value

Document Fees
INR 1180 /-
EMD
INR 181900.0 /-
Tender Value
INR 77.04 Lakhs /-

Attachment

FileName File Description File Size
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Click here to download tender document Tender Documents 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail