| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-09-2025 | Corrigendum | BOQ | 23-09-2025 |
| Sl. No. | Item Description |
| 1 | Taking down cementor cement lime plaster on brick or stone walls etc including raking out joints, hacking for keys, scrubbing down with water complete & removal of debris outside MD land upto requisite distance including necessary scaffolding upto 20m height and removal of grass, roots of plants etc at any place of bldg, and M&L for15mmthick in two coats (10+5mm) polymer modified ready mix cement based plaster on the wall surfaces complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour forpreparation for applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm including exterior wall care putty over new surfacesNote: The thickness of plaster specified above is minimum thickness and the quoted rates shall also deemd to be include for the provosion of dubbing of the surface and nothing extra shall be payable on this account.and applying all as specified including necessary scaffolding and safety arrangement |
| 2 | M & L for plain cement concrete 1:3:6 type C2 as in bed to drain pipe, 300mm bore including packing under and haunching against the sides of pipes after they are laid and testedincluding necessary shuttering and supports to concrete & M&L for reinforced concrete pipe class NP 2 laid and jointed complete with collars 300 mm dia & Dismantling any type of pipe including requisite excavation, jointed in cement mortar and taking out of trenches, if required complete all as specified and directed by EIC. |
| 3 | M & L for plain cement concrete 1:3:6 type C2 as in bed to drain pipe, 200mm bore including packing under and haunching against the sides of pipes after they are laid and testedincluding necessary shuttering and supports to concrete & M&L reinforced concrete pipe class NP 2 laid and jointed complete with collars 200 mm dia & Dismantling any type of pipe including requisite excavation, jointed in cement mortar and taking out of trenches, if required complete all as specified and directed by EIC. |
| 4 | M & L for plain cement concrete 1:3:6 type C2 as in bed to drain pipe, 150mm bore including packing under and haunching against the sides of pipes after they are laid and testedincluding necessary shuttering and supports to concrete & M&L reinforced concrete pipe class NP 2 laid and jointed complete with collars 150 mm dia & Dismantling any type of pipe including requisite excavation, jointed in cement mortar and taking out of trenches, if required complete all as specified and directed by EIC. |
| 5 | M & L for plain cement concrete 1:3:6 type C2 as in bed to drain pipe, 200mm bore including packing under and haunching against the sides of pipes after they are laid and testedincluding necessary shuttering and supports to concrete & M&L for 200mm internal dia sail glazed stone-ware drain pipe Grade\"A\" laid in trenches and jointed & Dismantling any type of pipe including requisite excavation complete all as specified and directed by EIC. |
| 6 | M & L for plain cement concrete 1:3:6 type C2 as in bed to drain pipe, 150mm bore including packing under and haunching against the sides of pipes after they are laid and testedincluding necessary shuttering and supports to concrete & M&L for150mm internal dia sail glazed stone-ware drain pipe Grade\"A\" laid in trenches and jointed & Dismantling any type of pipe including requisite excavation complete all as specified and directed by EIC. |
| 7 | Cleaning manhole of size n.exc 1.50 Sqm by taking out sludge in semiliquid/solid stage (incl. all water etc) from inside of manhole of depth not exceeding 1.5 m and removing the sludge to a distance not exceeding 50m depositing in trenches including supply and sprinkling bleachingpowder and covering sludge with earth to a thickness not less than 30 cm including all necessary excavation of earth work, returning filling, removal of surplus soil and necessary safety measures such as gas mask, use of safety belt etc as directed by the Engineer-in-Charge. |
| 8 | Opening cover of manhole/septic tank exc 1.5 m depth, dewatering and pumping outnight sludge etc from septic tank by mechanical means and removing sludge outside MD land and cleaning the septic tank as per BMC rules and placing the cover inoriginal position taking all precautionary and safety measuresall as directed.Note: All T&P and transportation for carrying sludgeshall be provided by the contractor at their own cost. |
| 9 | M & L for precast reinforced cement concrete 1:2:4, type B1 (using 20 mm graded stone aggregate) as in cover slab of manholes, septic tank etc, set in cement mortar (1:4) including necessary form, moulds etc and including taking out/removal of existing unserviceable cover slab from manholes /septic tank complete all as specified and directed.(Note: Reinforcement shall be measuredand paid separately) including demolition of reinforced cement concrete (Reinforcement cut as required to facilitate demolition) in ground floors (below or above ground level) not exceeding 15cm thickness as in cover slabs etc. and removing the debris outside MD land upto requisite lead all as specified and directed. |
| 10 | M & L TMT steel bars 6 to 8 mm dia ,cut to length , bent to shape required inluding cranking, bending, hooking ends and binding with and including mild steel wire (annealed) wire not less than 0.90 mm dia as in reinforcement complete as specified and directed. |
| 11 | Formwork to soffits of suspended slab such as roof slab, floor slab, landing and similar work; flat rough finished surfaces of concrete complete all as specified and directed by EIC. |
| 12 | M & L mild steel TMT Bars 10mm dia and over cut to length bend to shape required including cranking bending spirally for column, hooking ends & binding with and including mild steel mild steel wire (annealed not less that 0.90 mm dia or securing with chlips) complete all as specified and directed by EIC. |
| 13 | M & L for RCC 1:2:4 type B-1 using 20 mm gradedstone aggregate as in slabs supported on wall etc. including demolition of reinforced cement concrete (Reinforcement cut as required to facilitate demolition) in ground floors (below or above ground level) not exceeding 15cm thicknessand removing the debris outside MD land upto requisite lead all as specified and directed |
| 14 | Cutting into existing manholes for connecting new drains, making good to pipe and rendering, cutting out existing benching for and forming branch channel (1/2 round or 3/4 section) in cement concrete 1:2:4 type B-1 smooth finished, and reforming benching as required for 150mm internal dia pipe complete all as specified and directed by EIC. |
| 15 | M & L for plain cement concrete 1:3:6 type C2 as in bed to drain pipe, 100mm bore including packing under and haunching against the sides of pipes after they are laid and testedincluding necessary shuttering and supports to concrete & M&L for100mm internal dia sail glazed stone-ware drain pipe Grade\"A\" laid in trenches and jointed & Dismantling any type of pipe including requisite excavation complete all as specified and directed by EIC. |
| 16 | M & L PCC 1:3:6 type C2 using (40 mm graded aggregate) as in surface channels and drains. including demolition of cement concrete in ground floors (below or above ground level) not exceeding 15cm thicknessand removing the debris outside MD land upto requisite lead all as specified and directed |
| 17 | Extra for forming fair finished drain or channel 30 CM inner girth in cement concrete, using extra cement, including forms, moulds, mitred/ stopped ends etc, complete all as specified and directed by EIC. |
| 18 | Add or deduct for each 25 mm girth or part thereof over or under 30cminner girth in cement concrete, using extra cement, including forms, moulds, mitred/ stopped ends etc, complete all as specified and directed by EIC. |
| 19 | M&L for PCC 1:4:8 type D2 using (40mm graded aggregate) in foundations, fillings and mass concrete below ground level including demolition of old/existing concrete below ground level of any description n.exc 15cm thick and removing debris outside MD land upto requisite distance complete all as specified and directed by EIC. |
| 20 | M & Lfor brick work in CM (1:6) using sub class \"B\" bricks strainght or curved as curved as required on plan exc 6mtrs mean radius etc. including demolition of old masonry of any description and removal of debris outside MD land upto requisite distance & M & L for rendering 15 mm thick on the fair faces of brickwork or concrete surfaces in CM 1:6 including finishing the surface of top layer even and smooth complete all as specified and directed by EIC. |
| 21 | M&L for Pre-cast cementconcrete blockmasonry with solid blocks, exc. 10 cm in width andsetting CM 1:6 in mortar ,Type B1,1:3:6,(20mm gradedaggregate)including demolition of old masonry of any description and removal of debris outside MD land upto requisite distance& M & L for rendering 15 mm thick on the fair faces of brickwork or concrete surfaces in CM 1:6 including finishing the surface of top layer even and smooth complete all as specified and directed by EIC. |
| 22 | M & L for rendering 15 mm thickusing polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing the debris outside MD land upto requisite lead including necessay scaffolding upto 20mtr height and removing grass, roots of plants, dry leaves, broken branches etc at any place on bldg complete all as specifiedNote: The thickness of plaster specified above is minimum thickness and the quoted rates shall also deemd to be include for the provision of dubbing of the surface and nothing extra shall be payable on this account. The rate also includes the rate of scaffolding and necessary safety measurements |
| 23 | M&L for Preparing surfaces plastered or unplastered and applying applying Two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces including necessay scaffolding upto 20mtr height and removing grass, roots of plants, dry leaves, broken branches etc at any place on bldg complete all as specified and directed by EIC |
| 24 | M & L for cement concrete 1:2:4 , type B-1 (using 20mmgraded stone aggregate) as in coping including necessary form work including demolition of old concrete any description and removing debris outside MD land upto requisite distance complete all as specified and directed by EIC. |
| 25 | M&Lfor 75mm thick cement concrete 1:3:6 type C-2 as in plinth protection and PCC path, finished the surface even and smooth without using extra cement including necessary form work finishing exposed edges fair and cutting of requisite joints @ 1.5m to 2m along the length of plinth protection and filling with requisite material including demolition of old concrete of any description and removing debris outside MD land upto requisite distancecomplete all as specified and directed by EIC. |
| 26 | Preparation of old surfaces on walls (plastered or unplastered or previously white washed) by washing, rubbing down and stopping of old decorated surfaces on wallsand applying one coat of white wash complete all as specified. |
| 27 | Preparation of old surfaces on walls (plastered or unplastered or previously colour washed) by washing, rubbing down and stopping of old decorated surfaces on walls and applying one coat of Colour wash complete all as specified. |
| 28 | M & L for preparation of old steel surfaces of any description over 10cm width or girth & applying one coat of synthetic enamel paint including necessary scaffolding upto 15m height complete all as specified. |
| 29 | M&L for complete removal of existing treatment by washing, rubbing down and stopping of old decorated surfaces on walls, preparation for distempering and applying two coat of oilbound distemper over a coat of primer including stopping of nails holes,cracks etc and levelling with minimum 1 mm thick white cement based wall care putty for obtaining plain surface complete all as specified and directed. |
| 30 | M & L for preparation of old surfaces for applying one coat of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over old surfacesincluding necessay scaffolding upto 20mtr height and removing grass, roots of plants, dry leaves, broken branches etc at any place on bldg complete all as specified and directed. |
| 31 | M & L for complete removal of existing treatment and applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over old surfacesincluding necessay scaffolding upto 20mtr height and removing grass, roots of plants, dry leaves, broken branches etc at any place on bldg complete all as specified and directed by EIC. |
| 32 | Demolition of cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) removing the debris outside MD land upto requisite lead and M&L for PCC 1:2:4 type B2 (Using 40mm graded stone aggregate) 100mm thick as in floor laid in panels and finished top even and fair without using extra cement all as specified |
| 33 | M&L for Forming Construction joint 30mm deep x 10mm wide filled with sealing compound Grade \"A\" complete all as specified and directed by EIC |
| 34 | M&L for Forming Contraction (Dummy) joints 65mm deep x 10mm wide, filled with sealing compound Grade \"A\" completeall as specified and directed by EIC |
| 35 | M&L for Forming 12mm thick Expansion joints in 100 mm thick concrete slab filled with pre-formed bituminous filler and top 30mm primed and sealed with sealing compound, Grade ‘A’ completeall as specified and directed by EIC |
| 36 | M&L for pre polished chequred cement concrete tiles 30cm x 30cm x 20mm thick, set and jointed with grey cement slurry mixed with pigment to match the shade of the slab including filling of joints with requisite grouting material and M&L for Screed bed or bedding layer or mortar 20mm thick for laying floor finishes in CM 1:6 including dismantling of existing tiles of any type and removing the debris outside MD land upto requisite lead complete all as specified and directed. |
| 37 | M&L for providing PCC 1:4:8 type D2 using (40mm graded aggregate) as sub base 75mm thick including demolition of old concrete of any description n.exc 15cm thick and removing the debris outside MD land upto requisite lead & M&L Machine pressed precast concrete interlocking paver block Coloured any shape and size confirming to IS 15658-2006 of 60mm thickness, M-35 Grade over and including25 mm thick sand cushion complete all as specified |
| 38 | M&L for Precast cement concretecover slabs 75mm thick and Cross sectional area exc 0.36 Sqm and n.exc 0.5 Sqm each for drain cover and similar workwith plain faces set in cement mortar 1:6 including demolition of old concrete of any description and removing debris outside MD land upto requiste distance complete all as speicified and directed. |
| 39 | Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing debris outside MD land upto requisite distance complete all as specified and M&L for rendering 15mm thick in two coats (10+5mm) polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces on walls, preparation for Acrylic emulsion and applying applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over new surfaces including necessary scaffolding upto 15m height and removing grass, roots of plants, dry leaves & broken branches at any place of bldg complete all as specified |
| 40 | Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing debris outside MD land upto requisite distance complete all as specified and M&L for rendering 10mm thick polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces on walls, preparation for distempering and applying two coat of oilbound distemper over a coat of primer including stopping of nails holes,cracks etc and 1 mm thick (minimum) white cement based wall care putty onold surfaces of wallsetc, finished even and smooth,including necessary scaffolding upto 10m height complete all as specified and directed. |
| 41 | Taking down cement plaster of any description from brick or stone walls including raking out joints, hacking for key , scrubbing down with water etc and removing debris outside MD land upto requisite distance complete all as specified and M&L for rendering 5mm thick polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces and applying three coats of white wash including necessary scaffolding upto 10m height complete all as specified and directed. |
| 42 | M&L for structural repairs to columns, beams, slabs and chajjas at maximum height of 16 mts including scaffolding and safety measurements completely all as specified and directed by Engineer-in-charge in following steps as mentioned below1) Chipping , Removing,Carefullly Loose Concrete work by low impact Hammer/Breakar without damaging the structure & cleaning including taking down of cement plaster and disposal of malba out side the premises etc. complete as directed. Hard concrete should not be removed by force.2) M&L for cleaning existing reinforcement with wire/ rotary wire brush to a shining bright finish, making the surfaces free from loose material, dirt etc complete and applying two coats of alkaline rust converting primer conforming to ASTM-B-117 of make. \"Feovert\" of \"Krishna Conchem\" OR \"Roff Rust Cleaner\" of \"Pidilite\" OR \"Shali Rustoff\" of \"STP Ltd\", on rebars with time interval of 1 hr between the coats, complete all as specified and directed. (Note :- Mode of measurement: superficial area of concrete will be measured.) |
| 43 | 3) M&L for Anticorrosive Treatment to Reinforcementusing Corroseal - ZR of M/s Krishna Conchem orEpoxy Zinc Primer of M/s. Dr. Fixitby application on exposed reinforcement in two coats with time interval of minimum 4 hours between each coat.The application shall be done by brush after cleaning/wire brushing to the exposed steel surfaces, complete all as specified and directed. 4) M&L for Epoxy bond coat of Make Fosroc (NITOBOND-EP) OR EPOXY BONDING AGENT of Dr. Fixit OR equivalent of M/s. Krishna Conchemas approved by GE over exposed concrete surfaces prior to application of any type of mortar to ensure bond between old concrete& new concrete by brush application, complete all as specified and directed. |
| 44 | 5) M&L for building up the profile of structural members by using polymer modified mortar from M/s. Krishna Conchem (Molith-PMM) OR Polymer mortar HB of Dr Fixit upto 40mm thickness including levelling, profiling etc in two layers,each layer not exceeding 20mm, complete all as specified and directed.6) M&L for rendering 15mm thick in two coats (10+5mm) polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces on walls, preparation for Acrylic emulsion and applying applying two coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resisitance as per IS 15489:2004, alkali & fungal rsistance, dirt resistance exterior paint of required shades(Company Depot Tinted) with silicon additives @ 1.43 litre/10sqm over & including priming coat of extreior primer applied @ 0.90 litre/10 sqm over new surfaces |
| 45 | M&L for structural repairs to columns, beams, slabs and chajjas at maximum height of 16 mts including scaffolding and safety measurements completely all as specified and directed by Engineer-in-charge in following steps as mentioned below1) Chipping , Removing,Carefullly Loose Concrete work by low impact Hammer/Breakar without damaging the structure & cleaning including taking down of cement plaster and disposal of malba out side the premises etc. complete as directed. Hard concrete should not be removed by force.2) M&L for cleaning existing reinforcement with wire/ rotary wire brush to a shining bright finish, making the surfaces free from loose material, dirt etc complete and applying two coats of alkaline rust converting primer conforming to ASTM-B-117 of make. \"Feovert\" of \"Krishna Conchem\" OR \"Roff Rust Cleaner\" of \"Pidilite\" OR \"Shali Rustoff\" of \"STP Ltd\", on rebars with time interval of 1 hr between the coats, complete all as specified and directed. (Note :- Mode of measurement: superficial area of concrete will be measured.) |
| 46 | 3) M&L for Anticorrosive Treatment to Reinforcementusing Corroseal - ZR of M/s Krishna Conchem orEpoxy Zinc Primer of M/s. Dr. Fixitby application on exposed reinforcement in two coats with time interval of minimum 4 hours between each coat.The application shall be done by brush after cleaning/wire brushing to the exposed steel surfaces, complete all as specified and directed. 4) M&L for Epoxy bond coat of Make Fosroc (NITOBOND-EP) OR EPOXY BONDING AGENT of Dr. Fixit OR equivalent of M/s. Krishna Conchemas approved by GE over exposed concrete surfaces prior to application of any type of mortar to ensure bond between old concrete& new concrete by brush application, complete all as specified and directed. |
| 47 | 5) M&L for building up the profile of structural members by using polymer modified mortar from M/s. Krishna Conchem (Molith-PMM) OR Polymer mortar HB of Dr Fixit upto 40mm thickness including levelling, profiling etc in two layers,each layer not exceeding 20mm, complete all as specified and directed.6) M&L for rendering 10mm thick polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces on walls, preparation for distempering and applying two coat of oilbound distemper over a coat of primer including stopping of nails holes,cracks etc and 1 mm thick (minimum) white cement based wall care putty onold surfaces of wallsetc, finished even and smooth, complete all as specified and directed. |
| 48 | M&L for structural repairs to columns, beams, slabs and chajjas at maximum height of 16 mts including scaffolding and safety measurements completely all as specified and directed by Engineer-in-charge in following steps as mentioned below1) Chipping , Removing,Carefullly Loose Concrete work by low impact Hammer/Breakar without damaging the structure & cleaning including taking down of cement plaster and disposal of malba out side the premises etc. complete as directed. Hard concrete should not be removed by force.2) M&L for cleaning existing reinforcement with wire/ rotary wire brush to a shining bright finish, making the surfaces free from loose material, dirt etc complete and applying two coats of alkaline rust converting primer conforming to ASTM-B-117 of make. \"Feovert\" of \"Krishna Conchem\" OR \"Roff Rust Cleaner\" of \"Pidilite\" OR \"Shali Rustoff\" of \"STP Ltd\", on rebars with time interval of 1 hr between the coats, complete all as specified and directed. (Note :- Mode of measurement: superficial area of concrete will be measured.) |
| 49 | 3) M&L for Anticorrosive Treatment to Reinforcementusing Corroseal - ZR of M/s Krishna Conchem orEpoxy Zinc Primer of M/s. Dr. Fixitby application on exposed reinforcement in two coats with time interval of minimum 4 hours between each coat.The application shall be done by brush after cleaning/wire brushing to the exposed steel surfaces, complete all as specified and directed. 4) M&L for Epoxy bond coat of Make Fosroc (NITOBOND-EP) OR EPOXY BONDING AGENT of Dr. Fixit OR equivalent of M/s. Krishna Conchemas approved by GE over exposed concrete surfaces prior to application of any type of mortar to ensure bond between old concrete& new concrete by brush application, complete all as specified and directed. |
| 50 | 5) M&L for building up the profile of structural members by using polymer modified mortar from M/s. Krishna Conchem (Molith-PMM) OR Polymer mortar HB of Dr Fixit upto 40mm thickness including levelling, profiling etc in two layers,each layer not exceeding 20mm, complete all as specified and directed.6) M&L for rendering 5mm thick polymer modified ready mix cement based plaster on the wall surfaces including finishing the surface of top layer even and smooth complete all as specified and directed make: easyplast from wall plast/readiplast from ultratech including material and labour for preparation of new plastered surfaces and applying three coats of white wash complete all as specified and directed. |
| 51 | M&L as in repair for providing CRS TMT bars any dia in various structural RCC elements like columns, beams, Slabs etc. including cutting, bending, fixing of bars with welding/ tying as required at site with & including binding wires etc. and all relevant works like anchoring of the bars in the existing RCC Members, complete all as specified and directed. |
| 52 | M & L for preparation of old distempering surfaces including washing, rubbing down and stopping of old decorated surfaces on wallsstopping of nails holes,cracks etc. and applying one coat of oil bound distemper on wall complete all as specified. |
| 53 | Preparation of old surfaces on ceiling / walls(plastered or unplastered or previously white washed) by washing, rubbing down , stoppingand applying one coat of white wash complete all as specified. |
| 54 | M & L for preparation of old wooden surfaces of any description over 10cm width or girth & applying one coat of synthetic enamel paint complete all as specified. |
| 55 | M&L rendering 15mm thick on fair faces of brick or concrete surfaces in CM (1:6) finished even and fair including Taking down cement or lime plaster of any description on brick or stone walls, including raking out joints, hacking for keys, scrubbing down with water etc, including all necessary scaffolding as required and removing debris outside MD land upto requisite distance including M&L for providing weather proof coating by applyingprimeseal primer of Dr fixit or equivalent of M/s STP Ltd under torch dry condiiton and subsequently applying two coats of water proof decorative elastomeric coating system of M/s Dr fixit or equivalent of M/s STP Ltd over prepared surfaces including necessay scaffolding upto 20mtr height and removing grass, roots of plants, dry leaves, broken branches etc at any place on bldg complete all as specified and directedcomplete all as specified and directed by EIC/GE |
| 56 | M&L for providing leakage/seepage proof coating by applyingprimeseal primer of Dr fixit or equivalent of M/s STP Ltd under torch dry condiiton and subsequently applying two coats of water proof decorative elastomeric coating system rain coat select system of M/s Dr fixit or equivalent of M/s STP Ltd over prepared surfaces including necessay scaffolding upto 20mtr height and removing grass, roots of plants, dry leaves, broken branches etc at any place on bldg complete all as specified and directed.Note The afore said treatment shall be got executed by the contractor frpom authorised applicator of the manufacturer and also necessary documents in support of the above shall be submitted by the contractor complete all as specified and directed. |
| 57 | S&F as in repairs uPVC vent cowl 75/110mm bore with and including rubber ring joints,including necessay scaffolding upto 20mtr height complete all as specified and directed. |
| 58 | S&F as in repairs 75/110 mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, fixed to walls with clamps including necessay scaffolding upto 20mtr height all complete all as specified and directed. |
| 59 | S&F as in repairs 75/110mm bore PVC (SWR) branch piece single (Single Y/ Double Y ) any type including necessay scaffolding upto 20mtr height complete all as specified and directed. |
| 60 | S&F as in repairs 75/110mm bore PVC (SWR) bend any type including necessay scaffolding upto 20mtr height complete all as specified and directed. |
| 61 | Note : A SUM OF RS 7470.00 TOWARDS SCHEDULE OF CREDIT SHALL BE DEDUCTED TO ARRIVE THE CONTRACT SUM |