| 1 | Renovation works |
| 2 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 3 | 13.98.1:Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade:One or more coats on old work |
| 4 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture ofrequired colour to give an even shade :One or more coats on old work |
| 5 | 13.111.2:Finishing walls with Acrylic Smooth exterior paint of required shade :Old work (One or more coat applied @ 0.90 ltr/10 sqm). |
| 6 | 50.12.5.1:Providing and fixing false ceiling with e board classic tile or equivalent make of size 610x610x4 mm ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately) |
| 7 | 25.1:Providing and supplying aluminium extruded tubular and other aluminium sections as per the architectural drawings and approved shop drawings , the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer-in-Charge. ( The item includes cost of material such as cleats, sleeves, screws etc. necessary for fabrication of extruded aluminium frame work. Nothing extra shall be paid on this account).The weight of aluminum extruded section shall be taken for purpose of payment |
| 8 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 9 | 26.32.1:Providing, mixing and applying SBR polymer (of approved make) modifiedCement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand withpolymer minimum 2% by wt. of cement used) as per specifications anddirections of Engineer-in-charge.Note: Measurement and payment: The pre-measurement of thickness shall bedone just after the surface preparation is completed and Payment under thisitem shall be made only after proper wet curing has been done and surfacehas been satisfactorily evaluated by sounding / tapping with a blunt metalinstrument and/or the 75mm size cube crushing strength at the end of 28 daysto be not less than 30 N/Sqmm2).12 mm average thickness. |
| 10 | 13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm) |
| 11 | OD178381/2025-2026:Artistic/Baby friendly painting- Painting pictures on walls with Acrylic Smooth exterior paint ofrequired shade- New work (Two or more coat applied @ 3.50 ltr/10 sqm over and includingpriming coat of exterior primer applied @ 3.20 kg/10 sqm) etc complete as per the direction ofEngineer in charge |
| 12 | 50.18.9.14.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 32 mm dia 10 Kgf/cm2 - External work- Exposed on wall |
| 13 | 10.25.1:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete |
| 14 | Compound Wall |
| 15 | OD184384/2025-2026:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful forreuse for any thickness of walls in DR masonry including disposal of debris within a distance of150m. |
| 16 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 17 | OD184383/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concretelevellingcourse using departmental rubble including packing to compactness to lines and levels, labourcharges etc.complete as per direction of Departmental officers at site |
| 18 | OD184382/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyanceof all materials labour charges etc. complete as per direction of Departmental officers at site |
| 19 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 20 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete |