Tender For Lot-3 Main Dam Including Coffer Dam And Hm Works Of Dibang Multipurpose Project

Issued by Boards / Undertakings / PSU · Lower Dibang Valley, Arunachal Pradesh
Tender Value
17069.79 Crore
Estimated cost
Bid Submission
06 Oct 2025
0 days left
EMD
10 Crore
Bank guarantee accepted
Document Fee
40000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Lower Dibang Valley → Arunachal Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Lot-3 Main Dam Including Coffer Dam And Hm Works Of Dibang Multipurpose Project, Arunachal Pradesh, India; 1 CURRENCY 2 NAME OF CURRENCY 3 Dewatering During Construction 4 Dewatering of Surface Construction Sites 5 Sub total of A1 6 Surface Excavation 7 Common excavation 8 Rock excavation 9 Dental excavation 10 Removal of material arising from over-break accepted due to geological conditions. 11 Extra for haulage of excavated materials 12 - Beyond 9 km 13 Control Perimeter Blasting 14 Line Drilling 15 Sub total of A2 16 Underground Excavation 17 Excavation in extended galleries of dam /drifts (tunnels) 18 - ClassI, II, & III 19 - Class IV and V 20 - By Multiple drifting due to geological reasons 21 Removal of material arising from overbreak accepted due to geological conditions. 22 Extra for haulage of excavated materials 23 - Beyond 9 km 24 Dental excavation 25 Line Drilling 26 Sub total of A3 27 Rock Supports 28 Rock Anchors, 25mm dia, Grade Fe 500 (drilling included) 29 - Length upto 4m 30 - Length more than 4.0 m and upto 6.0 m 31 Rock Anchors, 32mm dia, Grade Fe 500 (drilling included) 32 - Length up to 6.0 m 33 - Length more than 6.0 m and up to 9.0 m 34 - Length 9.0 m and up to 12.0 m 35 Rock Anchors, 36mm dia. Grade Fe 950/1050 36 - Length more than 6.0 m and up to 9.0 m 37 - Length 9.0 m and up to 12.0 m 38 Expansion cell rock bolts, 25mm dia, Grade Fe 500 (drilling included) 39 - Length more than 4.0 m and up to 6.0 m 40 Expansion cell rock bolts, 32mm dia, Grade Fe 500 (drilling included) 41 - Length more than 6.0 m and up to 9.0 m 42 Expansion cell rock bolts, 36mm dia Grade Fe 500 (drilling included) 43 - Length upto 6.0 m 44 - Length more than 6.0 m and up to 9.0 m 45 - Length more than 9.0 m and up to 12.0 m 46 Resin/Cement grouted rock bolts, 25mm dia Grade Fe 500 (drilling included) 47 - Length upto 4m 48 - Length more than 4.0 m and upto 6.0 m 49 Resin/Cement grouted rock bolts, 32mm dia Grade Fe 500 (drilling included) 50 - Length upto 6.0 m 51 - Length more than 6.0 m and upto 9.0 m 52 - Length more than 9.0 m and upto 12.0 m 53 Resin/Cement grouted rock bolts, 36mm dia Grade Fe 500 (drilling included) 54 - Length upto 6.0 m 55 - Length more than 6.0 m and upto 9.0 m 56 - Length more than 9.0 m and upto 12.0 m 57 Grouted anchor bars (drilling included) 58 - 25mm dia, length upto 4m 59 - 32mm dia, length upto 6m 60 - 36mm dia, length upto 6m 61 Self drilling Hollow core anchors 62 - 32mm dia,- Length upto 9.0 m 63 - 32mm dia length more than 9m and upto 15.0 m 64 Post tensioned rock bolts (Tendons), 2500 KN ultimate load and 1250 KN working load 65 Lattice girder 66 Soil nails 32 mm dia 67 Forepolling (25 mm dia.) 68 Pipe roofing 69 Rockbolt testing 70 - Rockbolts 25 mm dia 71 - Rockbolts 32 mm dia 72 Mesh reinforcement 73 - Welded wiremesh 74 - Chain link fabric 75 - Steel ribs, supply and installation (including accessories) 76 Lagging 77 - Steel Lagging 78 - Concrete Lagging 79 Sub total of A4 80 Shotcrete 81 SFR shotcrete 82 Plain Shotcrete 83 Cement variation in shotcrete* 84 Superplasticiser 85 Steel fibres 86 Micro silica 87 Sub total of A5 88 * Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design 89 Embankment construction and Backfill 90 Embankment Construction 91 - Zone-1 92 - Zone-2 93 - Zone-3 (Colcrete) 94 - Zone-4 95 Backfill / fill 96 - Random Backfill 97 - Compacted Backfill 98 - Free Draining Backfill 99 - Sand gravel Backfill/fill 100 -Extra for transport of embankment material (except impervious material)from beyond 10 Km 101 -Extra for transport of impervious material from beyond 1 Km 102 Sub total of A6 103 Drilling, Grouting and Pressure Relief Holes 104 Drilling for curtain grout 105 - Rotary Drilling with core recvovery of curtain grout holes 76 mm dia RCC+rock (one primary every four), including check-holes 106 - Rotary Drilling (NON-CORED)of curtain grout holes 50 mm dia in RCC+rock 107 - Re-drilling for curtain grouting where the grout has been allowed to set at the direction of the Engineer-in-Charge ( 50% of rate in 7.1.2) 50 mm rotary (non-cored) 108 Drilling for consolidation grouting in dam 109 - Rotary Drilling of 76 mm dia. Holes with core recovery in RCC+Rock 110 - Percussion Drilling of 50 mm dia grout holes 111 - Percussion Drilling of 45mm / 57 mm dia grout holes for pre-grouting 112 - Re-drilling for consolidation grouting where the grout has been allowed to set at the direction of the Engineer-in-Charge ( 50% of rate in 7.2.2) 113 Drilling of drainage holes from dam body galleries 114 - Percussion Drilling of 200mm dia. Holes in dam body and foundation 115 - Supply and installation of drain holes outlet devices. 116 Drilling ofPressure Relief holes from drifts/underground galleries 117 - Percussion Drilling of200 mm dia. holes 118 - Supply and installation of drain holes outlet devices. 119 - Supply and installation of200 mm dia perforated PVC pipes in rock galleries 120 Drilling ofPressure Relief holes for Excavation slopes and upper Yards drainage holes 121 - Percussion Drilling of76 mm dia. holes 122 - Supply and installation of50 mm dia perforated PVC pipes 123 Drilling of investigation holes, exploratory holes, check holes and holes for instrumentation at any inclination 124 - Percussion Drilling of 400 mm dia. holes for inverted pendulum 125 - Rotary Drilling with Core recovery of 150 mm dia. holes in RCC, including lugeon test every five meters 126 - Rotary Drilling with Core recovery of 115 mm dia. holes in RCC+Rock 127 - Rotary Drilling of 98 mm dia. Holes with core recovery, including lugeon test every five meters 128 Drilling for contact/consolidation grouting in underground structures, including diversion tunnel plugs 129 - Rotary Drilling of 76 mm dia. Holes with core recovery in RCC+Rock 130 - Percussion Drilling of 50 mm dia grout holes 131 - Percussion Drilling of 45mm / 57 mm dia grout holes for pre-grouting 132 - Re-drilling forholes in case additional groouting is performed ( 50% of rate in 7.7.2) 133 Water pressure testing - Lugeon water test 134 Embedded pipes and fittings for grouting 135 Placing grout (excluding cement) 136 - Contact / consolidation grout in underground structures 137 - Contact grouting ordered by the Engineer-in-charge 138 - Fill grouting of Temporary drainage system 139 - Fill grouting of Exploratory holes 140 - Contact / consolidation grout, in surface works, in single stage 141 - Contact / consolidation grout, in surface works, in multiple stage 142 - Curtain grouting 143 Grouting materials 144 - Cement 145 - Sand 146 - Bentonite 147 - Admixtures 148 - Ultra fine / Microfine Cement 149 - Colloidal Silica / Other Chemicals 150 Sub total of A7 151 Seepage Cutoff 152 Permeation grouting trials 153 Permeation grout curtain 154 Sub total of A8 155 Concrete 156 Lean and plum concrete 157 - M10/A40 158 - M10/A80 159 - M10/A150 160 Plain Cement concrete in Backfill (Surface /Underground works) 161 - Plain Cement Concrete M15/A40 162 - Plain Cement Concrete M15/A80 163 - Plain Cement Concrete M15/ A150 164 Plain / Reinforced Cement Concrete in Underground works (Gallery extensions and drifts) 165 - Plain Cement Concrete M20/A40 166 - Plain Cement Concrete M20/A80 167 - Plain/Reinforced Cement Concrete M25/A40 168 Plain / Reinforced Cement Concrete in Surface works 169 - Plain Cement Concrete M20/A40 170 - Plain Cement Concrete M20/A80 171 - Plain Cement Concrete M25/A40 172 - ReinforcedCement Concrete M25/A40 173 - ReinforcedCement Concrete M30/A20 174 - ReinforcedCement Concrete M30/A40 175 - ReinforcedCement Concrete M35/A20 176 - ReinforcedCement Concrete M35/A40 177 Precast Concrete (Plain/reinforced) 178 - Precast Concret M20/A20 179 - PrecastM30/A20 180 - PrecastConcrete M35/A20 181 Concrete in Blockout/Second stage concrete/Self compacting concrete 182 -M35/A20 183 -M40/A20 184 -Non-Shrink epoxy mortar 185 - Two component epoxy binder 186 - Filler 187 Grouting of the equipment bearing plates and anchors 188 -Non shrink cement based grout 189 -Non-shrink epoxy based grout 190 Water proofing Treatment works 191 - Crystalline Slurry 192 - Crystalline mortar 193 Structural Repair works/Closure of grout holes 194 - Cementitious mortar 195 High Performance Concrete 196 - HPC M65 197 Porous concrete 198 - Porous Concrete M10 199 Repair/rehabilitation and modification of concrete 200 - Fixing of rebar in already cast concrete 201 - Fixing of waterstops in existing concrete structures 202 - Making groove of size 155mm deep and 30mm wide 203 - Making groove of 80mm deep and 30mm wide 204 - Epoxy Resin 205 Non Shrink Epoxy Mortar 206 - Two component epoxy binder 207 - Filler 208 Plums in Concrete 209 Slush Grout 210 Bridge ancillaries 211 - Elastomeric bearing pads 212 Cement Variation in Concrete* 213 * Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design 214 Admixtures for Concrete 215 - Micro Silica/Supplementary cementitious material(SCM) 216 - Air-entraining agent 217 - Superplasticiser 218 Sub total of A9 219 Formwork 220 Class F1 221 Class F2 222 Class F3 223 Class F1C 224 Class F2C 225 Class F3C 226 Sub total of A10 227 Reinforcing Steel 228 Deformed Reinforcing Bars - Grade Fe 500 229 Plain Reinforcing bars 230 Couplers 231 - 25mm Dia. 232 - 32 mm Dia 233 - 36 mm Dia 234 - Reducer (36mm/32mm) 235 - Reducer (32mm/25mm) 236 Sub total of A11 237 Waterstop and Joints in concrete structures 238 Elastomeric/PVC Water Stop 239 - 500 mm wide 240 - 350 mm wide (L type) 241 - 300 mm wide 242 - 250 mm wide 243 - 150 mm wide 244 - Joint Sealing Compound (Asphalt Seal) 245 Joint Filler ( 12 mm thick sheets) 246 Bituminous Coating 247 Joint Sealant (Including primer) 248 External Thermo-plastic elastomer (TPE) 249 Sub total of A12 250 Metalworks 251 Hand rail and Railings 252 - Hand rail and Railing (Stainless steel) 253 - Hand rail and Railing (GI) 254 Ladders & Climbing iron 255 Steel cover, frames and gratings 256 Erection hooks 257 Steel anchorings 258 Steel pipes 259 Miscellaneous steel sections 260 Metalworks supplied by others 261 Guardrail 262 Sub total of A13 263 Structural Steelwork 264 Structural Steel 265 Rocker Bearing 266 Sub total of A14 267 Building and Architectural Works 268 Dam Complex and Control Building 269 Sub total of A15 270 Miscellaneous and Ancillary Works 271 Fencing and gates 272 - Fencing 273 - Gates 274 Weep Holes 275 PVC Pipes 276 -50 mm dia 277 -75 mm dia 278 -100 mm dia 279 -200 mm dia 280 -300 mm dia 281 Concrete Pipes 282 -200 mm dia 283 -300 mm dia 284 -400 mm dia 285 SWG pipes 286 -150 mm dia 287 -200 mm dia 288 -300 mm dia 289 -350 mm dia 290 -400 mm dia 291 Geotextile 292 Sub total of A16 293 Slope Protection 294 - Rock paving 295 - Stone Pitching 296 Gabions (Wire crates) 297 - Wire crates 298 - Boulder filling in wire crates, etc. 299 Polymer Rope Gabions 300 - Size 1m x 1m x 1m 301 - Size 2m x 2m x 1.5m 302 Random rubble masonry 303 - Wet R R Masonary 304 - Dry R R Masonary 305 Bio-Engineering Measures 306 - Wattling Trenches 307 - Mulching/ Plantation of Grass / Shrubs 308 - Jute-Geo Textile 309 - Balley Benching 310 - Bamboo Piling 311 Precast Concrete Blocks 312 - Rectangular Blocks 313 - Tetrapod Blocks 314 - Pyramid Blocks 315 Rockfall protection barrier 316 - 1000 kJ 317 - 2000 kJ 318 Slope protection Netting 319 Sub total of A17 320 Monitoring Instruments 321 Topographical Markers/Survey targets 322 Collimation System 323 - Mobile Target support 324 - Mobile target 325 - Fixed Target 326 - Coollimator basement 327 - Collimator 328 Seepage Measuring Wier(V-notch) 329 Automatic Perimetric Joint meter (Three Directional) 330 Manual Perimetric Joint meter (Three Directional) 331 Tiltmeter 332 Distribute temperature & strain sensors, thermocouples and reservoir thermometer 333 - Thermocouples/vibrating wire thermometer 334 - Fiber optic Distibuted Temperature and Strain Sensors (DTS) 335 Pore Pressure Gauges (vibrating wire Piezometer) 336 Uplift measuring device (stand pipe Piezometer) 337 Group of strain gauges 338 Multi Point Bore Hole Extensometer (3 points) 339 Strong motion accelographs 340 Inverted and Direct Pendulum 341 Direct pendulum 342 - Direct pendulum assembly 343 - Automatic Coordinometer (Direct/inverted) 344 - Mobile manual coordinometer support 345 Inverted Pendulum 346 - Inverted Pendulum Assembly 347 - Automatic Coordinometer 348 - Mobile manual coordinometer support 349 - Mobile manual coordinometer 350 Water level measuring gauges (1m length) 351 Water level elevation plates (each 2m of gauges) 352 Automatic Water LevelRecorder 353 Load Cell / Total Pressure Cell 354 Convergence Bolt (in Rock galleries) 355 Weather Station 356 GPS base 357 Turbidimeter 358 Microseismograph 359 Fixed Programmable Acquisition Units 360 - Readout unit for Electrical instruments e.g. extensometers, piezometers etc. 361 - Acquisition unit for fiber-optic cable (DCU) 362 Data acquisition system and Web based data monitoring services (ADAS) 363 Alarms 364 - Visual alarms 365 - Audio alarms 366 Dam Slope excavation monitoring instruments 367 - Optical Targets 368 - Load Cells 369 - Piezometers 370 - Inclinometer 371 Cables (including cable splicing kits, junction boxes, switch boxes, protection arrangements and other necessary accessories etc.) 372 - 4 Core 373 - 6 Core 374 - 8 Core 375 - 12 Core 376 - 20 Core 377 - 40 Core 378 Sub total of A18 379 Service Water Supply, Sewerage System and Sanitary Installation 380 Supply and laying of Galvanised Steel Pipes including all accessories, valves and fittings 381 -100 mm nomimal dia 382 -50 mm nomimal dia 383 -25 mm nomimal dia 384 Supply & installation of pumps up to 3 HP capacity for water supply including all electric panels, cables, level switches etc. 385 - No. of Operational units 386 - No. of Standby units 387 Supply and installation of Water Treatment Plant including Filteration and Chlorination with complete accessories as specified in Technical Specifications 388 Laying of HDPE sewage pipe line including fittings and fixtures 389 - 150 mm nomimal dia 390 - 100 mm nomimal dia 391 Supply and installation of F.I.B.R reactor based sewerage treatment plant including Filteration and Chlorination with pumps and necessary fittings etc. as specified in Technical Specifications 392 Sub total of A19 393 Electrical and Mechanical Works 394 Lighting system 395 Elevator for Dam 396 Grounding system 397 Drainage water pumping system 398 Temporary ecological valve system 399 - Fixed Cone Valve 400 - Bonneted Gate 401 - Structural steel for steel lining/ pipe conforming to grade E410 of IS 2062 or equivalent 402 Sub total of A20 403 Roadworks 404 Roller Compacted Concrete 405 RCC 406 RCC Class C25 407 RCC ClassC20 408 RCC Class C14 409 GEVR / GE-RCC 410 Variation of Cement* 411 Admixture 412 Test section for prequalification (840 cum each) 413 Sprayed epoxy primer with quartz 414 Two-component sprayed polyurea membrane 4mm thick 415 Three part epoxy modified cementitious fine textured mortar 416 Sub total of A22 417 * Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design 418 Additional Investigations 419 Geophysical Investigations 420 - Seismic Refraction Tomography (SRT) 421 - Direct Wave Tomography (DWT) between Nos.2drifts (receiving geophones line length is considered) 422 - Cross-Hole Tomography (CHT) 423 In-hole Tests 424 - Optical / Acoustic Televiewer 425 Deformability Tests 426 - Plate Load test 427 - Flat Jack 428 - Goodman Jack 429 Shear Strength Tests 430 - Shear Strength Test in the rock mass 431 - Shear Strength Test for concrete-rock contact 432 Laboratory tests 433 - Determination of density dry and saturated 434 - Uniaxial Compressive Strength tests (UCS) in dry and wet condition 435 - UCS with measurement of Young Modulus 436 - Triaxial tests 437 - Tensile strength test 438 - Joint direct shear tests (DST) 439 - Los Angeles Abrasion tests (LAA) 440 Sub total of A23

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 22-Sep-2025 Corrigendum no. 6 Date 06-Oct-2025

BOQ

Name of Work: Lot-3: Main Dam including Coffer Dam and HM works of Dibang Multipurpose Project”, Arunachal Pradesh, India
Sl. No. Item Description
1CURRENCY
2NAME OF CURRENCY
3Dewatering During Construction
4Dewatering of Surface Construction Sites
5Sub total of A1
6Surface Excavation
7Common excavation
8Rock excavation
9Dental excavation
10Removal of material arising from over-break accepted due to geological conditions.
11Extra for haulage of excavated materials
12- Beyond 9 km
13Control Perimeter Blasting
14Line Drilling
15Sub total of A2
16Underground Excavation
17Excavation in extended galleries of dam /drifts (tunnels)
18- ClassI, II, & III
19- Class IV and V
20- By Multiple drifting due to geological reasons
21Removal of material arising from overbreak accepted due to geological conditions.
22Extra for haulage of excavated materials
23- Beyond 9 km
24Dental excavation
25Line Drilling
26Sub total of A3
27Rock Supports
28Rock Anchors, 25mm dia, Grade Fe 500 (drilling included)
29- Length upto 4m
30- Length more than 4.0 m and upto 6.0 m
31Rock Anchors, 32mm dia, Grade Fe 500 (drilling included)
32- Length up to 6.0 m
33- Length more than 6.0 m and up to 9.0 m
34- Length 9.0 m and up to 12.0 m
35Rock Anchors, 36mm dia. Grade Fe 950/1050
36- Length more than 6.0 m and up to 9.0 m
37- Length 9.0 m and up to 12.0 m
38Expansion cell rock bolts, 25mm dia, Grade Fe 500 (drilling included)
39- Length more than 4.0 m and up to 6.0 m
40Expansion cell rock bolts, 32mm dia, Grade Fe 500 (drilling included)
41- Length more than 6.0 m and up to 9.0 m
42Expansion cell rock bolts, 36mm dia Grade Fe 500 (drilling included)
43- Length upto 6.0 m
44- Length more than 6.0 m and up to 9.0 m
45- Length more than 9.0 m and up to 12.0 m
46Resin/Cement grouted rock bolts, 25mm dia Grade Fe 500 (drilling included)
47- Length upto 4m
48- Length more than 4.0 m and upto 6.0 m
49Resin/Cement grouted rock bolts, 32mm dia Grade Fe 500 (drilling included)
50- Length upto 6.0 m
51- Length more than 6.0 m and upto 9.0 m
52- Length more than 9.0 m and upto 12.0 m
53Resin/Cement grouted rock bolts, 36mm dia Grade Fe 500 (drilling included)
54- Length upto 6.0 m
55- Length more than 6.0 m and upto 9.0 m
56- Length more than 9.0 m and upto 12.0 m
57Grouted anchor bars (drilling included)
58- 25mm dia, length upto 4m
59- 32mm dia, length upto 6m
60- 36mm dia, length upto 6m
61Self drilling Hollow core anchors
62- 32mm dia,- Length upto 9.0 m
63- 32mm dia length more than 9m and upto 15.0 m
64Post tensioned rock bolts (Tendons), 2500 KN ultimate load and 1250 KN working load
65Lattice girder
66Soil nails 32 mm dia
67Forepolling (25 mm dia.)
68Pipe roofing
69Rockbolt testing
70- Rockbolts 25 mm dia
71- Rockbolts 32 mm dia
72Mesh reinforcement
73- Welded wiremesh
74- Chain link fabric
75- Steel ribs, supply and installation (including accessories)
76Lagging
77- Steel Lagging
78- Concrete Lagging
79Sub total of A4
80Shotcrete
81SFR shotcrete
82Plain Shotcrete
83Cement variation in shotcrete*
84Superplasticiser
85Steel fibres
86Micro silica
87Sub total of A5
88* Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design
89Embankment construction and Backfill
90Embankment Construction
91- Zone-1
92- Zone-2
93- Zone-3 (Colcrete)
94- Zone-4
95Backfill / fill
96- Random Backfill
97- Compacted Backfill
98- Free Draining Backfill
99- Sand gravel Backfill/fill
100-Extra for transport of embankment material (except impervious material)from beyond 10 Km
101-Extra for transport of impervious material from beyond 1 Km
102Sub total of A6
103Drilling, Grouting and Pressure Relief Holes
104Drilling for curtain grout
105- Rotary Drilling with core recvovery of curtain grout holes 76 mm dia RCC+rock (one primary every four), including check-holes
106- Rotary Drilling (NON-CORED)of curtain grout holes 50 mm dia in RCC+rock
107- Re-drilling for curtain grouting where the grout has been allowed to set at the direction of the Engineer-in-Charge ( 50% of rate in 7.1.2) 50 mm rotary (non-cored)
108Drilling for consolidation grouting in dam
109- Rotary Drilling of 76 mm dia. Holes with core recovery in RCC+Rock
110- Percussion Drilling of 50 mm dia grout holes
111- Percussion Drilling of 45mm / 57 mm dia grout holes for pre-grouting
112- Re-drilling for consolidation grouting where the grout has been allowed to set at the direction of the Engineer-in-Charge ( 50% of rate in 7.2.2)
113Drilling of drainage holes from dam body galleries
114- Percussion Drilling of 200mm dia. Holes in dam body and foundation
115- Supply and installation of drain holes outlet devices.
116Drilling ofPressure Relief holes from drifts/underground galleries
117- Percussion Drilling of200 mm dia. holes
118- Supply and installation of drain holes outlet devices.
119- Supply and installation of200 mm dia perforated PVC pipes in rock galleries
120Drilling ofPressure Relief holes for Excavation slopes and upper Yards drainage holes
121- Percussion Drilling of76 mm dia. holes
122- Supply and installation of50 mm dia perforated PVC pipes
123Drilling of investigation holes, exploratory holes, check holes and holes for instrumentation at any inclination
124- Percussion Drilling of 400 mm dia. holes for inverted pendulum
125- Rotary Drilling with Core recovery of 150 mm dia. holes in RCC, including lugeon test every five meters
126- Rotary Drilling with Core recovery of 115 mm dia. holes in RCC+Rock
127- Rotary Drilling of 98 mm dia. Holes with core recovery, including lugeon test every five meters
128Drilling for contact/consolidation grouting in underground structures, including diversion tunnel plugs
129- Rotary Drilling of 76 mm dia. Holes with core recovery in RCC+Rock
130- Percussion Drilling of 50 mm dia grout holes
131- Percussion Drilling of 45mm / 57 mm dia grout holes for pre-grouting
132- Re-drilling forholes in case additional groouting is performed ( 50% of rate in 7.7.2)
133Water pressure testing - Lugeon water test
134Embedded pipes and fittings for grouting
135Placing grout (excluding cement)
136- Contact / consolidation grout in underground structures
137- Contact grouting ordered by the Engineer-in-charge
138- Fill grouting of Temporary drainage system
139- Fill grouting of Exploratory holes
140- Contact / consolidation grout, in surface works, in single stage
141- Contact / consolidation grout, in surface works, in multiple stage
142- Curtain grouting
143Grouting materials
144- Cement
145- Sand
146- Bentonite
147- Admixtures
148- Ultra fine / Microfine Cement
149- Colloidal Silica / Other Chemicals
150Sub total of A7
151Seepage Cutoff
152Permeation grouting trials
153Permeation grout curtain
154Sub total of A8
155Concrete
156Lean and plum concrete
157- M10/A40
158- M10/A80
159- M10/A150
160Plain Cement concrete in Backfill (Surface /Underground works)
161- Plain Cement Concrete M15/A40
162- Plain Cement Concrete M15/A80
163- Plain Cement Concrete M15/ A150
164Plain / Reinforced Cement Concrete in Underground works (Gallery extensions and drifts)
165- Plain Cement Concrete M20/A40
166- Plain Cement Concrete M20/A80
167- Plain/Reinforced Cement Concrete M25/A40
168Plain / Reinforced Cement Concrete in Surface works
169- Plain Cement Concrete M20/A40
170- Plain Cement Concrete M20/A80
171- Plain Cement Concrete M25/A40
172- ReinforcedCement Concrete M25/A40
173- ReinforcedCement Concrete M30/A20
174- ReinforcedCement Concrete M30/A40
175- ReinforcedCement Concrete M35/A20
176- ReinforcedCement Concrete M35/A40
177Precast Concrete (Plain/reinforced)
178- Precast Concret M20/A20
179- PrecastM30/A20
180- PrecastConcrete M35/A20
181Concrete in Blockout/Second stage concrete/Self compacting concrete
182-M35/A20
183-M40/A20
184-Non-Shrink epoxy mortar
185- Two component epoxy binder
186- Filler
187Grouting of the equipment bearing plates and anchors
188-Non shrink cement based grout
189-Non-shrink epoxy based grout
190Water proofing Treatment works
191- Crystalline Slurry
192- Crystalline mortar
193Structural Repair works/Closure of grout holes
194- Cementitious mortar
195High Performance Concrete
196- HPC M65
197Porous concrete
198- Porous Concrete M10
199Repair/rehabilitation and modification of concrete
200- Fixing of rebar in already cast concrete
201- Fixing of waterstops in existing concrete structures
202- Making groove of size 155mm deep and 30mm wide
203- Making groove of 80mm deep and 30mm wide
204- Epoxy Resin
205Non Shrink Epoxy Mortar
206- Two component epoxy binder
207- Filler
208Plums in Concrete
209Slush Grout
210Bridge ancillaries
211- Elastomeric bearing pads
212Cement Variation in Concrete*
213* Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design
214Admixtures for Concrete
215- Micro Silica/Supplementary cementitious material(SCM)
216- Air-entraining agent
217- Superplasticiser
218Sub total of A9
219Formwork
220Class F1
221Class F2
222Class F3
223Class F1C
224Class F2C
225Class F3C
226Sub total of A10
227Reinforcing Steel
228Deformed Reinforcing Bars - Grade Fe 500
229Plain Reinforcing bars
230Couplers
231- 25mm Dia.
232- 32 mm Dia
233- 36 mm Dia
234- Reducer (36mm/32mm)
235- Reducer (32mm/25mm)
236Sub total of A11
237Waterstop and Joints in concrete structures
238Elastomeric/PVC Water Stop
239- 500 mm wide
240- 350 mm wide (L type)
241- 300 mm wide
242- 250 mm wide
243- 150 mm wide
244- Joint Sealing Compound (Asphalt Seal)
245Joint Filler ( 12 mm thick sheets)
246Bituminous Coating
247Joint Sealant (Including primer)
248External Thermo-plastic elastomer (TPE)
249Sub total of A12
250Metalworks
251Hand rail and Railings
252- Hand rail and Railing (Stainless steel)
253- Hand rail and Railing (GI)
254Ladders & Climbing iron
255Steel cover, frames and gratings
256Erection hooks
257Steel anchorings
258Steel pipes
259Miscellaneous steel sections
260Metalworks supplied by others
261Guardrail
262Sub total of A13
263Structural Steelwork
264Structural Steel
265Rocker Bearing
266Sub total of A14
267Building and Architectural Works
268Dam Complex and Control Building
269Sub total of A15
270Miscellaneous and Ancillary Works
271Fencing and gates
272- Fencing
273- Gates
274Weep Holes
275PVC Pipes
276-50 mm dia
277-75 mm dia
278-100 mm dia
279-200 mm dia
280-300 mm dia
281Concrete Pipes
282-200 mm dia
283-300 mm dia
284-400 mm dia
285SWG pipes
286-150 mm dia
287-200 mm dia
288-300 mm dia
289-350 mm dia
290-400 mm dia
291Geotextile
292Sub total of A16
293Slope Protection
294- Rock paving
295- Stone Pitching
296Gabions (Wire crates)
297- Wire crates
298- Boulder filling in wire crates, etc.
299Polymer Rope Gabions
300- Size 1m x 1m x 1m
301- Size 2m x 2m x 1.5m
302Random rubble masonry
303- Wet R R Masonary
304- Dry R R Masonary
305Bio-Engineering Measures
306- Wattling Trenches
307- Mulching/ Plantation of Grass / Shrubs
308- Jute-Geo Textile
309- Balley Benching
310- Bamboo Piling
311Precast Concrete Blocks
312- Rectangular Blocks
313- Tetrapod Blocks
314- Pyramid Blocks
315Rockfall protection barrier
316- 1000 kJ
317- 2000 kJ
318Slope protection Netting
319Sub total of A17
320Monitoring Instruments
321Topographical Markers/Survey targets
322Collimation System
323- Mobile Target support
324- Mobile target
325- Fixed Target
326- Coollimator basement
327- Collimator
328Seepage Measuring Wier(V-notch)
329Automatic Perimetric Joint meter (Three Directional)
330Manual Perimetric Joint meter (Three Directional)
331Tiltmeter
332Distribute temperature & strain sensors, thermocouples and reservoir thermometer
333- Thermocouples/vibrating wire thermometer
334- Fiber optic Distibuted Temperature and Strain Sensors (DTS)
335Pore Pressure Gauges (vibrating wire Piezometer)
336Uplift measuring device (stand pipe Piezometer)
337Group of strain gauges
338Multi Point Bore Hole Extensometer (3 points)
339Strong motion accelographs
340Inverted and Direct Pendulum
341Direct pendulum
342- Direct pendulum assembly
343- Automatic Coordinometer (Direct/inverted)
344- Mobile manual coordinometer support
345Inverted Pendulum
346- Inverted Pendulum Assembly
347- Automatic Coordinometer
348- Mobile manual coordinometer support
349- Mobile manual coordinometer
350Water level measuring gauges (1m length)
351Water level elevation plates (each 2m of gauges)
352Automatic Water LevelRecorder
353Load Cell / Total Pressure Cell
354Convergence Bolt (in Rock galleries)
355Weather Station
356GPS base
357Turbidimeter
358Microseismograph
359Fixed Programmable Acquisition Units
360- Readout unit for Electrical instruments e.g. extensometers, piezometers etc.
361- Acquisition unit for fiber-optic cable (DCU)
362Data acquisition system and Web based data monitoring services (ADAS)
363Alarms
364- Visual alarms
365- Audio alarms
366Dam Slope excavation monitoring instruments
367- Optical Targets
368- Load Cells
369- Piezometers
370- Inclinometer
371Cables (including cable splicing kits, junction boxes, switch boxes, protection arrangements and other necessary accessories etc.)
372- 4 Core
373- 6 Core
374- 8 Core
375- 12 Core
376- 20 Core
377- 40 Core
378Sub total of A18
379Service Water Supply, Sewerage System and Sanitary Installation
380Supply and laying of Galvanised Steel Pipes including all accessories, valves and fittings
381-100 mm nomimal dia
382-50 mm nomimal dia
383-25 mm nomimal dia
384Supply & installation of pumps up to 3 HP capacity for water supply including all electric panels, cables, level switches etc.
385- No. of Operational units
386- No. of Standby units
387Supply and installation of Water Treatment Plant including Filteration and Chlorination with complete accessories as specified in Technical Specifications
388Laying of HDPE sewage pipe line including fittings and fixtures
389- 150 mm nomimal dia
390- 100 mm nomimal dia
391Supply and installation of F.I.B.R reactor based sewerage treatment plant including Filteration and Chlorination with pumps and necessary fittings etc. as specified in Technical Specifications
392Sub total of A19
393Electrical and Mechanical Works
394Lighting system
395Elevator for Dam
396Grounding system
397Drainage water pumping system
398Temporary ecological valve system
399- Fixed Cone Valve
400- Bonneted Gate
401- Structural steel for steel lining/ pipe conforming to grade E410 of IS 2062 or equivalent
402Sub total of A20
403Roadworks
404Roller Compacted Concrete
405RCC
406RCC Class C25
407RCC ClassC20
408RCC Class C14
409GEVR / GE-RCC
410Variation of Cement*
411Admixture
412Test section for prequalification (840 cum each)
413Sprayed epoxy primer with quartz
414Two-component sprayed polyurea membrane 4mm thick
415Three part epoxy modified cementitious fine textured mortar
416Sub total of A22
417* Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design
418Additional Investigations
419Geophysical Investigations
420- Seismic Refraction Tomography (SRT)
421- Direct Wave Tomography (DWT) between Nos.2drifts (receiving geophones line length is considered)
422- Cross-Hole Tomography (CHT)
423In-hole Tests
424- Optical / Acoustic Televiewer
425Deformability Tests
426- Plate Load test
427- Flat Jack
428- Goodman Jack
429Shear Strength Tests
430- Shear Strength Test in the rock mass
431- Shear Strength Test for concrete-rock contact
432Laboratory tests
433- Determination of density dry and saturated
434- Uniaxial Compressive Strength tests (UCS) in dry and wet condition
435- UCS with measurement of Young Modulus
436- Triaxial tests
437- Tensile strength test
438- Joint direct shear tests (DST)
439- Los Angeles Abrasion tests (LAA)
440Sub total of A23

AI Tender Summary

OUR REF NO 51181874
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 17069.79 Crore
LAST DATE 06-10-2025
Authority
Authority Name National Hydroelectric Power Corporation Limited
Work Description Lot-3 Main Dam Including Coffer Dam And Hm Works Of Dibang Multipurpose Project, Arunachal Pradesh, India; 1 CURRENCY 2 NAME OF CURRENCY 3 Dewatering During Construction 4 Dewatering of Surface Construction Sites 5 Sub total of A1 6 Surface Excavation 7 Common excavation 8 Rock excavation 9 Dental excavation 10 Removal of material arising from over-break accepted due to geological conditions. 11 Extra for haulage of excavated materials 12 - Beyond 9 km 13 Control Perimeter Blasting 14 Line Drilling 15 Sub total of A2 16 Underground Excavation 17 Excavation in extended galleries of dam /drifts (tunnels) 18 - ClassI, II, & III 19 - Class IV and V 20 - By Multiple drifting due to geological reasons 21 Removal of material arising from overbreak accepted due to geological conditions. 22 Extra for haulage of excavated materials 23 - Beyond 9 km 24 Dental excavation 25 Line Drilling 26 Sub total of A3 27 Rock Supports 28 Rock Anchors, 25mm dia, Grade Fe 500 (drilling included) 29 - Length upto 4m 30 - Length more than 4.0 m and upto 6.0 m 31 Rock Anchors, 32mm dia, Grade Fe 500 (drilling included) 32 - Length up to 6.0 m 33 - Length more than 6.0 m and up to 9.0 m 34 - Length 9.0 m and up to 12.0 m 35 Rock Anchors, 36mm dia. Grade Fe 950/1050 36 - Length more than 6.0 m and up to 9.0 m 37 - Length 9.0 m and up to 12.0 m 38 Expansion cell rock bolts, 25mm dia, Grade Fe 500 (drilling included) 39 - Length more than 4.0 m and up to 6.0 m 40 Expansion cell rock bolts, 32mm dia, Grade Fe 500 (drilling included) 41 - Length more than 6.0 m and up to 9.0 m 42 Expansion cell rock bolts, 36mm dia Grade Fe 500 (drilling included) 43 - Length upto 6.0 m 44 - Length more than 6.0 m and up to 9.0 m 45 - Length more than 9.0 m and up to 12.0 m 46 Resin/Cement grouted rock bolts, 25mm dia Grade Fe 500 (drilling included) 47 - Length upto 4m 48 - Length more than 4.0 m and upto 6.0 m 49 Resin/Cement grouted rock bolts, 32mm dia Grade Fe 500 (drilling included) 50 - Length upto 6.0 m 51 - Length more than 6.0 m and upto 9.0 m 52 - Length more than 9.0 m and upto 12.0 m 53 Resin/Cement grouted rock bolts, 36mm dia Grade Fe 500 (drilling included) 54 - Length upto 6.0 m 55 - Length more than 6.0 m and upto 9.0 m 56 - Length more than 9.0 m and upto 12.0 m 57 Grouted anchor bars (drilling included) 58 - 25mm dia, length upto 4m 59 - 32mm dia, length upto 6m 60 - 36mm dia, length upto 6m 61 Self drilling Hollow core anchors 62 - 32mm dia,- Length upto 9.0 m 63 - 32mm dia length more than 9m and upto 15.0 m 64 Post tensioned rock bolts (Tendons), 2500 KN ultimate load and 1250 KN working load 65 Lattice girder 66 Soil nails 32 mm dia 67 Forepolling (25 mm dia.) 68 Pipe roofing 69 Rockbolt testing 70 - Rockbolts 25 mm dia 71 - Rockbolts 32 mm dia 72 Mesh reinforcement 73 - Welded wiremesh 74 - Chain link fabric 75 - Steel ribs, supply and installation (including accessories) 76 Lagging 77 - Steel Lagging 78 - Concrete Lagging 79 Sub total of A4 80 Shotcrete 81 SFR shotcrete 82 Plain Shotcrete 83 Cement variation in shotcrete* 84 Superplasticiser 85 Steel fibres 86 Micro silica 87 Sub total of A5 88 * Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design 89 Embankment construction and Backfill 90 Embankment Construction 91 - Zone-1 92 - Zone-2 93 - Zone-3 (Colcrete) 94 - Zone-4 95 Backfill / fill 96 - Random Backfill 97 - Compacted Backfill 98 - Free Draining Backfill 99 - Sand gravel Backfill/fill 100 -Extra for transport of embankment material (except impervious material)from beyond 10 Km 101 -Extra for transport of impervious material from beyond 1 Km 102 Sub total of A6 103 Drilling, Grouting and Pressure Relief Holes 104 Drilling for curtain grout 105 - Rotary Drilling with core recvovery of curtain grout holes 76 mm dia RCC+rock (one primary every four), including check-holes 106 - Rotary Drilling (NON-CORED)of curtain grout holes 50 mm dia in RCC+rock 107 - Re-drilling for curtain grouting where the grout has been allowed to set at the direction of the Engineer-in-Charge ( 50% of rate in 7.1.2) 50 mm rotary (non-cored) 108 Drilling for consolidation grouting in dam 109 - Rotary Drilling of 76 mm dia. Holes with core recovery in RCC+Rock 110 - Percussion Drilling of 50 mm dia grout holes 111 - Percussion Drilling of 45mm / 57 mm dia grout holes for pre-grouting 112 - Re-drilling for consolidation grouting where the grout has been allowed to set at the direction of the Engineer-in-Charge ( 50% of rate in 7.2.2) 113 Drilling of drainage holes from dam body galleries 114 - Percussion Drilling of 200mm dia. Holes in dam body and foundation 115 - Supply and installation of drain holes outlet devices. 116 Drilling ofPressure Relief holes from drifts/underground galleries 117 - Percussion Drilling of200 mm dia. holes 118 - Supply and installation of drain holes outlet devices. 119 - Supply and installation of200 mm dia perforated PVC pipes in rock galleries 120 Drilling ofPressure Relief holes for Excavation slopes and upper Yards drainage holes 121 - Percussion Drilling of76 mm dia. holes 122 - Supply and installation of50 mm dia perforated PVC pipes 123 Drilling of investigation holes, exploratory holes, check holes and holes for instrumentation at any inclination 124 - Percussion Drilling of 400 mm dia. holes for inverted pendulum 125 - Rotary Drilling with Core recovery of 150 mm dia. holes in RCC, including lugeon test every five meters 126 - Rotary Drilling with Core recovery of 115 mm dia. holes in RCC+Rock 127 - Rotary Drilling of 98 mm dia. Holes with core recovery, including lugeon test every five meters 128 Drilling for contact/consolidation grouting in underground structures, including diversion tunnel plugs 129 - Rotary Drilling of 76 mm dia. Holes with core recovery in RCC+Rock 130 - Percussion Drilling of 50 mm dia grout holes 131 - Percussion Drilling of 45mm / 57 mm dia grout holes for pre-grouting 132 - Re-drilling forholes in case additional groouting is performed ( 50% of rate in 7.7.2) 133 Water pressure testing - Lugeon water test 134 Embedded pipes and fittings for grouting 135 Placing grout (excluding cement) 136 - Contact / consolidation grout in underground structures 137 - Contact grouting ordered by the Engineer-in-charge 138 - Fill grouting of Temporary drainage system 139 - Fill grouting of Exploratory holes 140 - Contact / consolidation grout, in surface works, in single stage 141 - Contact / consolidation grout, in surface works, in multiple stage 142 - Curtain grouting 143 Grouting materials 144 - Cement 145 - Sand 146 - Bentonite 147 - Admixtures 148 - Ultra fine / Microfine Cement 149 - Colloidal Silica / Other Chemicals 150 Sub total of A7 151 Seepage Cutoff 152 Permeation grouting trials 153 Permeation grout curtain 154 Sub total of A8 155 Concrete 156 Lean and plum concrete 157 - M10/A40 158 - M10/A80 159 - M10/A150 160 Plain Cement concrete in Backfill (Surface /Underground works) 161 - Plain Cement Concrete M15/A40 162 - Plain Cement Concrete M15/A80 163 - Plain Cement Concrete M15/ A150 164 Plain / Reinforced Cement Concrete in Underground works (Gallery extensions and drifts) 165 - Plain Cement Concrete M20/A40 166 - Plain Cement Concrete M20/A80 167 - Plain/Reinforced Cement Concrete M25/A40 168 Plain / Reinforced Cement Concrete in Surface works 169 - Plain Cement Concrete M20/A40 170 - Plain Cement Concrete M20/A80 171 - Plain Cement Concrete M25/A40 172 - ReinforcedCement Concrete M25/A40 173 - ReinforcedCement Concrete M30/A20 174 - ReinforcedCement Concrete M30/A40 175 - ReinforcedCement Concrete M35/A20 176 - ReinforcedCement Concrete M35/A40 177 Precast Concrete (Plain/reinforced) 178 - Precast Concret M20/A20 179 - PrecastM30/A20 180 - PrecastConcrete M35/A20 181 Concrete in Blockout/Second stage concrete/Self compacting concrete 182 -M35/A20 183 -M40/A20 184 -Non-Shrink epoxy mortar 185 - Two component epoxy binder 186 - Filler 187 Grouting of the equipment bearing plates and anchors 188 -Non shrink cement based grout 189 -Non-shrink epoxy based grout 190 Water proofing Treatment works 191 - Crystalline Slurry 192 - Crystalline mortar 193 Structural Repair works/Closure of grout holes 194 - Cementitious mortar 195 High Performance Concrete 196 - HPC M65 197 Porous concrete 198 - Porous Concrete M10 199 Repair/rehabilitation and modification of concrete 200 - Fixing of rebar in already cast concrete 201 - Fixing of waterstops in existing concrete structures 202 - Making groove of size 155mm deep and 30mm wide 203 - Making groove of 80mm deep and 30mm wide 204 - Epoxy Resin 205 Non Shrink Epoxy Mortar 206 - Two component epoxy binder 207 - Filler 208 Plums in Concrete 209 Slush Grout 210 Bridge ancillaries 211 - Elastomeric bearing pads 212 Cement Variation in Concrete* 213 * Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design 214 Admixtures for Concrete 215 - Micro Silica/Supplementary cementitious material(SCM) 216 - Air-entraining agent 217 - Superplasticiser 218 Sub total of A9 219 Formwork 220 Class F1 221 Class F2 222 Class F3 223 Class F1C 224 Class F2C 225 Class F3C 226 Sub total of A10 227 Reinforcing Steel 228 Deformed Reinforcing Bars - Grade Fe 500 229 Plain Reinforcing bars 230 Couplers 231 - 25mm Dia. 232 - 32 mm Dia 233 - 36 mm Dia 234 - Reducer (36mm/32mm) 235 - Reducer (32mm/25mm) 236 Sub total of A11 237 Waterstop and Joints in concrete structures 238 Elastomeric/PVC Water Stop 239 - 500 mm wide 240 - 350 mm wide (L type) 241 - 300 mm wide 242 - 250 mm wide 243 - 150 mm wide 244 - Joint Sealing Compound (Asphalt Seal) 245 Joint Filler ( 12 mm thick sheets) 246 Bituminous Coating 247 Joint Sealant (Including primer) 248 External Thermo-plastic elastomer (TPE) 249 Sub total of A12 250 Metalworks 251 Hand rail and Railings 252 - Hand rail and Railing (Stainless steel) 253 - Hand rail and Railing (GI) 254 Ladders & Climbing iron 255 Steel cover, frames and gratings 256 Erection hooks 257 Steel anchorings 258 Steel pipes 259 Miscellaneous steel sections 260 Metalworks supplied by others 261 Guardrail 262 Sub total of A13 263 Structural Steelwork 264 Structural Steel 265 Rocker Bearing 266 Sub total of A14 267 Building and Architectural Works 268 Dam Complex and Control Building 269 Sub total of A15 270 Miscellaneous and Ancillary Works 271 Fencing and gates 272 - Fencing 273 - Gates 274 Weep Holes 275 PVC Pipes 276 -50 mm dia 277 -75 mm dia 278 -100 mm dia 279 -200 mm dia 280 -300 mm dia 281 Concrete Pipes 282 -200 mm dia 283 -300 mm dia 284 -400 mm dia 285 SWG pipes 286 -150 mm dia 287 -200 mm dia 288 -300 mm dia 289 -350 mm dia 290 -400 mm dia 291 Geotextile 292 Sub total of A16 293 Slope Protection 294 - Rock paving 295 - Stone Pitching 296 Gabions (Wire crates) 297 - Wire crates 298 - Boulder filling in wire crates, etc. 299 Polymer Rope Gabions 300 - Size 1m x 1m x 1m 301 - Size 2m x 2m x 1.5m 302 Random rubble masonry 303 - Wet R R Masonary 304 - Dry R R Masonary 305 Bio-Engineering Measures 306 - Wattling Trenches 307 - Mulching/ Plantation of Grass / Shrubs 308 - Jute-Geo Textile 309 - Balley Benching 310 - Bamboo Piling 311 Precast Concrete Blocks 312 - Rectangular Blocks 313 - Tetrapod Blocks 314 - Pyramid Blocks 315 Rockfall protection barrier 316 - 1000 kJ 317 - 2000 kJ 318 Slope protection Netting 319 Sub total of A17 320 Monitoring Instruments 321 Topographical Markers/Survey targets 322 Collimation System 323 - Mobile Target support 324 - Mobile target 325 - Fixed Target 326 - Coollimator basement 327 - Collimator 328 Seepage Measuring Wier(V-notch) 329 Automatic Perimetric Joint meter (Three Directional) 330 Manual Perimetric Joint meter (Three Directional) 331 Tiltmeter 332 Distribute temperature & strain sensors, thermocouples and reservoir thermometer 333 - Thermocouples/vibrating wire thermometer 334 - Fiber optic Distibuted Temperature and Strain Sensors (DTS) 335 Pore Pressure Gauges (vibrating wire Piezometer) 336 Uplift measuring device (stand pipe Piezometer) 337 Group of strain gauges 338 Multi Point Bore Hole Extensometer (3 points) 339 Strong motion accelographs 340 Inverted and Direct Pendulum 341 Direct pendulum 342 - Direct pendulum assembly 343 - Automatic Coordinometer (Direct/inverted) 344 - Mobile manual coordinometer support 345 Inverted Pendulum 346 - Inverted Pendulum Assembly 347 - Automatic Coordinometer 348 - Mobile manual coordinometer support 349 - Mobile manual coordinometer 350 Water level measuring gauges (1m length) 351 Water level elevation plates (each 2m of gauges) 352 Automatic Water LevelRecorder 353 Load Cell / Total Pressure Cell 354 Convergence Bolt (in Rock galleries) 355 Weather Station 356 GPS base 357 Turbidimeter 358 Microseismograph 359 Fixed Programmable Acquisition Units 360 - Readout unit for Electrical instruments e.g. extensometers, piezometers etc. 361 - Acquisition unit for fiber-optic cable (DCU) 362 Data acquisition system and Web based data monitoring services (ADAS) 363 Alarms 364 - Visual alarms 365 - Audio alarms 366 Dam Slope excavation monitoring instruments 367 - Optical Targets 368 - Load Cells 369 - Piezometers 370 - Inclinometer 371 Cables (including cable splicing kits, junction boxes, switch boxes, protection arrangements and other necessary accessories etc.) 372 - 4 Core 373 - 6 Core 374 - 8 Core 375 - 12 Core 376 - 20 Core 377 - 40 Core 378 Sub total of A18 379 Service Water Supply, Sewerage System and Sanitary Installation 380 Supply and laying of Galvanised Steel Pipes including all accessories, valves and fittings 381 -100 mm nomimal dia 382 -50 mm nomimal dia 383 -25 mm nomimal dia 384 Supply & installation of pumps up to 3 HP capacity for water supply including all electric panels, cables, level switches etc. 385 - No. of Operational units 386 - No. of Standby units 387 Supply and installation of Water Treatment Plant including Filteration and Chlorination with complete accessories as specified in Technical Specifications 388 Laying of HDPE sewage pipe line including fittings and fixtures 389 - 150 mm nomimal dia 390 - 100 mm nomimal dia 391 Supply and installation of F.I.B.R reactor based sewerage treatment plant including Filteration and Chlorination with pumps and necessary fittings etc. as specified in Technical Specifications 392 Sub total of A19 393 Electrical and Mechanical Works 394 Lighting system 395 Elevator for Dam 396 Grounding system 397 Drainage water pumping system 398 Temporary ecological valve system 399 - Fixed Cone Valve 400 - Bonneted Gate 401 - Structural steel for steel lining/ pipe conforming to grade E410 of IS 2062 or equivalent 402 Sub total of A20 403 Roadworks 404 Roller Compacted Concrete 405 RCC 406 RCC Class C25 407 RCC ClassC20 408 RCC Class C14 409 GEVR / GE-RCC 410 Variation of Cement* 411 Admixture 412 Test section for prequalification (840 cum each) 413 Sprayed epoxy primer with quartz 414 Two-component sprayed polyurea membrane 4mm thick 415 Three part epoxy modified cementitious fine textured mortar 416 Sub total of A22 417 * Quantity of cement variation may be both negative as well positive during the actual execution depending upon the mix design 418 Additional Investigations 419 Geophysical Investigations 420 - Seismic Refraction Tomography (SRT) 421 - Direct Wave Tomography (DWT) between Nos.2drifts (receiving geophones line length is considered) 422 - Cross-Hole Tomography (CHT) 423 In-hole Tests 424 - Optical / Acoustic Televiewer 425 Deformability Tests 426 - Plate Load test 427 - Flat Jack 428 - Goodman Jack 429 Shear Strength Tests 430 - Shear Strength Test in the rock mass 431 - Shear Strength Test for concrete-rock contact 432 Laboratory tests 433 - Determination of density dry and saturated 434 - Uniaxial Compressive Strength tests (UCS) in dry and wet condition 435 - UCS with measurement of Young Modulus 436 - Triaxial tests 437 - Tensile strength test 438 - Joint direct shear tests (DST) 439 - Los Angeles Abrasion tests (LAA) 440 Sub total of A23
Basic Detail
Tender No NH/CCW/CC-I/CO-407/PR12925/61
Bidding Type Tender
Location
City Lower Dibang Valley
State Arunachal Pradesh
Key Dates
Publish Date 22 Sep 2025
Submission Date 06 Oct 2025
Open Date 09 Oct 2025
Finance
Tender Value 17069.79 Crore
Tender Fee 40000
EMD 10 Crore
Exemption Available
Document List
07e6d8d1-a9a4-4240-8b97-59318bcae5db.html
BOQ_922113.xls
ClarificationtoBidders.pdf
combinedcorrigendums.pdf
Tendernotice_1.pdf
Tendernotice_2.pdf
Volume_0_Section-0-NIT_ITB.pdf
Volume_1_Sec_1_IFB_PART_1.pdf
Volume_1_Sec_1_IFB_PART_2.pdf
Volume_1_Sec_1_IFB_PART_3.pdf
Volume_6_Sec8_DataSheet.pdf
Volume_1_Sec_1_IFB_PART_6.pdf
Volume_1_Sec_1_IFB_PART_7.pdf
Volume_2_Sec_2_3_4_PCC.pdf
Volume_3_Sec_5_BOQ.pdf
Volume_4_Sec_6_TS.pdf
Volume_5_Sec_7_TenderDraw_1.pdf
Volume_1_Sec_1_IFB_PART_4.pdf
Volume_1_Sec_1_IFB_PART_5.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 22, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 06, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Oct 06, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 09, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

07e6d8d1-a9a4-4240-8b97-59318bcae5db.html

xls

BOQ_922113.xls

pdf

ClarificationtoBidders.pdf

pdf

combinedcorrigendums.pdf

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

pdf

Volume_0_Section-0-NIT_ITB.pdf

pdf

Volume_1_Sec_1_IFB_PART_1.pdf

pdf

Volume_1_Sec_1_IFB_PART_2.pdf

pdf

Volume_1_Sec_1_IFB_PART_3.pdf

pdf

Volume_6_Sec8_DataSheet.pdf

pdf

Volume_1_Sec_1_IFB_PART_6.pdf

pdf

Volume_1_Sec_1_IFB_PART_7.pdf

pdf

Volume_2_Sec_2_3_4_PCC.pdf

pdf

Volume_3_Sec_5_BOQ.pdf

pdf

Volume_4_Sec_6_TS.pdf

pdf

Volume_5_Sec_7_TenderDraw_1.pdf

pdf

Volume_1_Sec_1_IFB_PART_4.pdf

pdf

Volume_1_Sec_1_IFB_PART_5.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders