| 1 | BUS SHELTER |
| 2 | Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales,murram, ordinary earth, earth mixed with 50% fair sized boulders etc., with initial lead and lifts including laying, sprading, levelling sectioning etc.complete |
| 3 | Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification |
| 4 | Supply delivery and filling of river sand in layer of not more than 15 cm thick including watering with all layers and consolidation complying withstandard specification including cost and conveyance of sand at site and all labour charges etc.,complete |
| 5 | Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90X60cm & 10 gauge stiffened, welded with steel including cost and conveyance of all labor and all material charges etc. |
| 6 | Grade Beam |
| 7 | Column |
| 8 | Slab |
| 9 | Supply and fabrication of steel and placing in positon MS/Ribbed / Tor steel grills for RCC works as per design given including cost of steel and GI binding wire in floors etc., complete with standard specification |
| 10 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - |
| 11 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9\" X 43/8\"X 2 3/4\" including finishing, curing, etc., complete complying with standard specification |
| 12 | SPECIAL PLASTERING and finishing all the RCC exposed surface such as RCC slabs, sunshades, canopies, staircase steps, landing slabs, etc. with cement mortar 1:3 (One cement and three sand) 10mm thick and including hacking the surfaces and providing necessary standard specification etc. |
| 13 | PLASTERING walls with cement mortar 1:5 (One cement and five sand) 12mm thick in all floors and all exposed surfaces including cost and conveyance of materials to site and all labour charges etc. complete |
| 14 | Paving the floor with descrgned coloured vitrified tiles of size 600 x 600 x 8mm of best quality and approved variety complying / confirming ISI specification land over cement mortar 1:3 (one cement and three sand) 20mm thick and pomted with same coloured cement neatly etc., complete. |
| 15 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 16 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 17 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 18 | Supplying and fixing M.S.grill to doors, special windows and ventilators etc as directed by the departmental officers inclusive of cost of MS grill including one of cost red oxide and fixing in position etc., complete (as per the schedule of rate) |
| 19 | Painting new iron works such as steel doors, windows, rolling shutters, ventilators, window bars, balusters etc., with two coast best approved fresh quality and colour of synthatic enamel paint over the existing red oxide priming coat in all floors etc.complete |