| 1 | Under the Business Plan for the year 2025-26, various materials used for the work of addition and capacity enhancement of various distribution transformers should be collected from the storage centre and safely transported to the respective work site through a kutcha or paved road, which also includes the work of loading and unloading to the respective storage centre and work site, and it also includes the work of pulling etc., and the cost of labour, T&P carrier etc. required to complete the work properly is also included. |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | ST Pole 11 Mtr Long |
| 4 | Safe cartage of line material viz. conductor, cable, GI earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 5 | 25 KVA 11/0.4KV Distribution Transformer |
| 6 | 63 KVA 11/0.4KV Distribution Transformer |
| 7 | 100 KVA 11/0.4KV Distribution Transformer |
| 8 | 250 KVA 11/0.4KV Distribution Transformer |
| 9 | Erection of 8.5 Mtr. Single PCC Pole including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of 8.5 Mtr. Single PCC Poleper RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 11 | Erection of Double-Pole for 25/63/100 KVA T/F including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of Double-Pole for 25/63/100 KVA T/Fper RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 13 | Fixing & Commisioning of Earthing Rod Completeas per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 14 | Fixing & Commisioning of 11 KV 3Phase D.O. Fuse Set as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 15 | Erection and Grouting of Stay set Complete including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. |
| 16 | Construction of Plinth & Francing including of first class brick sand cement etc. As per RESSPO manual (all Civil material shall be arranged by contractor on his own cost) |
| 17 | Laying, Sagging and Binding & Jumpring of ACSR weasel conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 18 | Laying, Sagging and Binding ABC 1X16 3x50/3x95/3x120 as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 19 | Fixing & Commisioning of Top Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost) |
| 20 | Fixing & Commisioning of M.S. Base Angle with clamp (65X65X6X2028mm) For T/f as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost) |
| 21 | Fixing & Commisioning of Ms Dropper Channel(100X50X5X2028mm) with clampas per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost) |
| 22 | Fixing & Commisioning of T-off Channel with clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (Channel with Clamp Shall be arranged by contractor on his own cost) |
| 23 | Fixing & Commisioning of Installation of 25 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 24 | Fixing & Commisioning of Installation of 63 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 25 | Fixing & Commisioning of Installation of 100 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 26 | Fixing & Commisioning of Installation of 250 KVA 11/0.4KV Distribution Transformer as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 27 | Dismentling of Recived Back All Type T/F From Old site To Store including the cost of labour, T&P carrier etc required for proper completion of work. |