|
| 1 | Maintenance works |
| 2 | 15.28.2:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :Asbestos cement Sheet |
| 3 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge |
| 4 | 12.8:Providing reinforced by organic fibres and/or inorganic synthetic fibres cement6 mm thick corrugated sheets (as per IS: 14871) roofing up to any pitch andfixing with polymer coated J, or L hooks, bolts and nuts 8 mm dia. G.I. plain andbitumen washers or with self drilling fastener and EPDM washers etc. complete(excluding the cost of purlins, rafters and trusses), including cutting sheets tosize and shape wherever required. |
| 5 | OD110524/2025-2026:Engaging Man labor forSpecified Works |
| 6 | OD110625/2025-2026: engaging Beldar for specified works |
| 7 | OD110648/2025-2026:Engaging Carpenter for Specified Works |
| 8 | OD110710/2025-2026:Engaging Fitter /Plumber for Specified Works |
| 9 | OD110829/2025-2026:Engaging Electricianfor Specified Works |
| 10 | OD110734/2025-2026: Materials for Electrification (Payment shall begiven asper actualPurchase Bill ) |
| 11 | 14.75:Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge. |
| 12 | 18.54.3:Providing and fixing PTMT bib cock of approved quality and colour.15 mm nominal bore, 165 mm long, weighing not less than 110 gms |
| 13 | 50.18.7.3.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 25 mm dia 10Kgf/ cm2- Internal work- Exposed on wall |
| 14 | OD111299/2025-2026:Finish walls with Premium plastic acrylic emulsionpaint of required shade:Old work ( Two or more coats applied @ 1.67 ltr/10 sqm) on existing cement paint surface |
| 15 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 16 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 17 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources) |
| 18 | 10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes |