| 1 | FSB at Roing (Span - 15.00 Mtr) |
| 2 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)(i) Ordinary soilA. Manual Means (Depth upto 3 m) |
| 3 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 4 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement.a) M20 (1 cement: 1.5 coarse sand :3 stone aggregate 20 mm nominal size) |
| 5 | Reinforced concrete work in columns, pillars, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring, shuttering and reinforcement.a) M20 (1 cement: 1.5 coarse sand :3 stone aggregate 20 mm |
| 6 | Reinforced concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring, shuttering and reinforcement.a) M20 (1 cement: 1.5 coarse sand: 3 stone aggregate 20 mm |
| 7 | Reinforcement of RCC work including bending, binding and placing in position complete. a) Cold twisted bars. |
| 8 | Centring and shuttering including strutting proping etc. and removal of form work for: a) Foundations and plinth. |
| 9 | b) Columns, pillars and piers |
| 10 | c) Lintels, beams, girders, bressumers and cantilevers etc. |
| 11 | Erection of wire rope suspension bridge including placing, fixing wire cable etc. |
| 12 | Supplying of main cable 16mm dia wire rope. |
| 13 | Supplying of 8mm dia wire rope for suspender |
| 14 | Supplying of 12mm dia wire rope for railing. |
| 15 | Fabrication and supplying of main pulley |
| 16 | Supplying turn buckle 10 MT Capacity |
| 17 | Anchor Bolt for main cable 10 MT Capacity. |
| 18 | Anchor Bolt for deck cable 05 MT Capacity. |
| 19 | Turn Buckle 5 MT Capacity. |
| 20 | Wire Rope Forged Thimble 16 mm dia. |
| 21 | Wire Rope Forged Thimble 12 mm dia. |
| 22 | Wire Rope Forged Thimble 8 mm dia. |
| 23 | Galvanised \"U\" Bolt 12 mm |
| 24 | Galvanised \"U\" Bolt 8 mm |
| 25 | Galvanised \"U\" Bolt 16 mm |
| 26 | Supplying of M.S. Plate for suspenders |
| 27 | Supply of straining bolt |
| 28 | Supplying of Wooden planks and scants for decking. |
| 29 | Providing and fixing Chain link jali of 8 SWG 1.20 mtr high with GI staples etc as per direction of Engineer in charge complete. |
| 30 | Fabrication and supplying of steel at fabrication unit comprising tower legs portable bracing, cross beams, stringers, lateral bracing and holding down bolts or eye bolts are delivered at bridge site in undamaged conditions i/c strengthening, degreasing cutting to size and shape, drilling, welding,and also i/c supplying of all M.S.Flats, bolts & nuts etc and including painting of all members of tower as per the direction of the Engineer - in - Charge. |
| 31 | providing and applying Painting one coat (excluding priming coat ) on new steel and other metal surface under coat with ready mixed paint brushing to give an even shade including cleaning the surface all dirt, dust and other foreign matter:- |
| 32 | Supplying and installation solar street light 100w |
| 33 | Total weigth to be carried by head load from Manigong to work site. (2 days walking distance in hilly areas.) |