Repair Of Opd Complex Building District Hospital Samba Please Refer To Boq- 1 Raking out joints in lime or cement mortar and preparing the surface for re-pointing or re-plastering, including disposal of rubbish to the dumping ground within 50 meters lead. 2 Flush pointing with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% of integral water proofing compound by weight of cement for flat tile bricks on top of mud phaska : 14.21.1 With non modular brick tiles 3 Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead : Of area of 3 sqm. and below 4 Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead : Of area of 3 sqm. and below 5 Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead With cement mortar 1:4 (1 cement : 4 fine sand) with all leads and lifts carriage complete. 6 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Sal wood 7 Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. First class kail wood 35 mm thick 8 Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.11:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) with all leads and lifts cariage complete. 9 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. 10 Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. 11 Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide 12 Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. 13 Providing and applying Plaster of Paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete 14 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. 15 Distempering with 1st quality acrylic distemper (ready mixed)having VOC content less than 50 gms/litre,two or more coats on new work of approved manufacturer, of required shade and colour complete as per manufacturer’s specifications 16 Finishing walls with Acrylic smooth exterior paint of required shade:Old work (two or more coats applied @ 1.67 liters/10sqm on existing cement paint surface) 17 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work 18 Providing and fixing aluminum tower bolts ISI marked anodized (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete :250x10 mm 19 Providing and fixing aluminum handles ISI marked anodized (anodic coating not less than grade AC 10 as per IS: 1868) transparent or dyed to required colour and shade with necessary screws etc. complete. 125 mm 20 Renewing glass panes, with putty and nails wherever necessary including raking out old putty : Float glass panes of thickness 5.0 mm(weight not less than 12.5 kg/sqm) 21 Engagement of Labourer for site clearence and cleaning of Aluminium doors / windows and washing of kota flooring and rubbing. 22 Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable lockingarrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank 23 Repair of sanitary installations and water supply including making all the units of first floor functional including fixing of required G.I. Pipes PVC pipes and rectifying leakage with all accessories complete job as directed by Engineer-in-charge. 24 Plumber 25 Helper 26 Engaging of electrion for electrification including replacing of existing conductors and switches, plugs etc. with modular switches and sockets complete as directed by the Engineer-in-charge 27 Providing and fixing 1st quality ceramic glazed floor tiles conforming toIS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete.