| 1 | Safe carriage loading unloading with proper stacking of following materialfrom ESC Daliganj to JE dump store. |
| 2 | 11/0.4 KV 250/400 KVA T/F |
| 3 | 11 KV XLPE Cable 3x120 sqmm |
| 4 | LT ABC Cable (3x120+1x95+1x16) |
| 5 | LT XLPE Cable 1x240/400 sqmm |
| 6 | 11 KV jinting Kit end/St joint |
| 7 | 11 KV on load single circuit three way RMU 100 Amp |
| 8 | Safe carriage loading unloading with proper stacking of following materialfrom JE dump store to work site. |
| 9 | 11/0.4 KV 250/400 KVA T/F |
| 10 | 11 KV XLPE Cable 3x120 sqmm |
| 11 | LT ABC Cable (3x120+1x95+1x16) |
| 12 | LT XLPE Cable 1x240/400 sqmm |
| 13 | 11 KV jinting Kit end/St joint |
| 14 | 11 KV on load single circuit three way RMU 100 Amp |
| 15 | Layong of 11 KV XLPE cable 3x120 sqmm through digging of trench/drill method safety as epr norms/IS with all T&P abd labour |
| 16 | Removal of existing 100 KVA T/F, KT coeections, jumper, leads, fencing, etc |
| 17 | Construction of T/F plinth of size 1.5x1.5x1 M on a padding 0.25M deep in ground 1:5:10 cemend sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed.Rest wall should be 0.23 mtr thick.brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be fiilled from the ground level up to 15 centimeter below from the top of wall,Cement,sand & brick Ballasts should be filled up to 15 centimeter.Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand,cement and stone ballast in the ratio of 1:2:4.The t/fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand. (All the material will be arranged by the contractor .) |
| 18 | Making/Constructing fencing complete with material |
| 19 | Making/Constructing fuse unit complete with material |
| 20 | Making of 11 KV jointing kit 3x120 sqmm at both end and in beteeem of 11 KV cable with making coeection properly with all T&P and labour |
| 21 | Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x16) conductor as per RESSPO Norms.(AB Cable provided by deptt and balance material like holding clamp,eye hook,suspension clamp and dead end clamp arranged by contractor .) |
| 22 | Laying of LT PVC Cable 1x400 sq mm single circuit in 900 mm deep, 500 mm wide including supply of required material as fine sand, 1st class bricks, stone slab (Except LT PVC cable) |
| 23 | Boring Type Earthing Of Css Lowering Of 20 Mtr. Deep Are Upto Water Level 1.5” Dia ‘B’ Class Jindal Make G.I Pipe Its Connection In Between T/F & Boring With G.I Strip Of Size 50x6 Mm. (All Material Hall Be Supply By Contractor) |
| 24 | Erection and commissioning of 11/0.4 KV 250/400 KNA T/F on construction plinth and conncting with system including completion of ermination/jointing kits testing of its and etc complete in all respect. Crimping of lugs L-piece and connection copper busbar 750x50x6 mm. All material shall by supply by the contractor. |
| 25 | Making and installation of fuse unit 500 amp 650 volts |
| 26 | Fixing clamp and tightening nut and bolt |
| 27 | Removsl of 63/100 KVA T/F and loading, unloading and carriage from site dump store centre daliganj |
| 28 | All taxess as applicable shall be paid time to time extra |