|
| 1 | Supply of Field Internals of all Three Fields of existing ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler |
| 2 | COLLECTING ELECTRODE TTR,TBR, 1.2 THK,A= 10395MM LONG(EFF.HT=10.55 M)quantity: 458 nos. |
| 3 | e_TUBE 44.5 O/D,TTR,TBR,80 PIN SPACING,A=11235 MM LONG,NO OF SPIKE=256 NOS Quantity: 437 nos. |
| 4 | TOP HANGER,TTR FOR C.E.- 480 LENGTH FOR 7 NO.OF C.E,A=3654 MMquantity:66 nos. |
| 5 | BOTTOM HANGER,TTR FOR C.E.-480 LENGTH FOR 7 NO.OF C.E,A=3480 MMquantity: 66 nos. |
| 6 | TIE BAR - LONG, 400 SPACING FOR e-TUBE BOTTOM GUIDE FRAME06 nos. |
| 7 | e-TUBE BOTTOM GUIDE FRAME 10 GP [ TTR ] 400 SPACING, 3.5 M FIELDquantity:3 nos. |
| 8 | e-TUBE BOTTOM GUIDE FRAME 11 GP [ TTR ] 400 SPACING, 3.5 M FIELD quantity: 3 nos. |
| 9 | CE bracket & Hardware quantity: 01 no. |
| 10 | SUPPORT INSULATOR (120KV)- INDIGENOUS, CYLINDERICAL Quantity: 02 nos. |
| 11 | GASKET FOR CYLINDRICAL SUPPORT INSULATOR FOR 510 OD, 5 THK, NON-ASBESTOSquantity: 04 nos. |
| 12 | SHAFT INSULATOR 1016 MM quantity: 06 nos. |
| 13 | Rapper coilquantity:06 nos. |
| 14 | Quantity: 06 nos. |
| 15 | TICQuantity: 02 nos. |
| 16 | RTDquantity: 01 no. |
| 17 | Hypalon Boot quantity: 12 nos. |
| 18 | Worm gear clamp (Big end) quantity: 12 nos. |
| 19 | Worm gear clamp (small) Quantity: 12 nos. |
| 20 | Row cardquantity:01 no. |
| 21 | Column cardquantity:01 no. |
| 22 | HMIquantity: 01 no. |
| 23 | DC Thyristor unit quantity: 01 no. |
| 24 | Dismantling, Erection/Fitting, Commisning and testing of Field Internals of all Three Fields of Thermax Make ESP Installed at 145TPH/110Kg/cm2 Capacity Boiler and Macke the ESP Complete leak proof.field supervision,tools and tackleand free technical support/helth checkup during the sesion (free off Cost) will be in the scope off the contractor . The work include 1. replacement of all the internals of 3 fields. 2. Alignment of allthree fields. 3. Repairing of side casing, Ilet/outlet nozzles , hopper vibrator, doors etc. |