|
| 1 | Teen shade |
| 2 | Dismantling of reinforcement cement concrete .including supply of all material,labour and T&P etc.required for proper completion of workbeam |
| 3 | Dismantling of old and damage brick work of walls .including supply of all material,labour and T&P etc.required for proper completion of work wall |
| 4 | Deduction of old and workable brick 40% .including supply of all material,labour and T&P etc.required for proper completion of work |
| 5 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of workcolumn footing for wall less column pedastal |
| 6 | Concrete in 1:4:8 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work. Column footing long wall short wall pedastal |
| 7 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labourand T&P etc required for proper completion of work cc ramp |
| 8 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage inraft foundation i/c supply of all material,labour and T&P etc.including all complete of worktrepazium areah/2A1+A2+√(A1xA2) 0.60/3(2.25+0.36√(2.25x0.36 0.20(2.25+0.36+0.90)= |
| 9 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in plinth beam,tie beam i/c supply of all material,labour and T&P etc.including all complete of work plinth beam short side on existing wall |
| 10 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Columni/c supply of all material,labour and T&P etc.including all complete of workPedestal H=1.20-0.15-0.30-0.60=0.15+1.00=1.15 From FFL to 1.00 |
| 11 | Supply and fixing of mild steel or iron work such as reinforced includingsupply of all material,labour and T&P etc.required for proper completion of work taking in footing 0.60% taking inheavy beam1.20% taking in column 1.20% |
| 12 | M-150 brick work in 1:6 with cement, fine sand in foundation and plinthmortar including supply of all material,labour and T&P etc.required for proper completion of work long wall less column |
| 13 | M-150 brick work in 1:4 with cement,coarse sandmortar in super structure including supply of all material,labour and T&P etc.required for proper completion of workwall less column |
| 14 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work wall wall existing wall |
| 15 | MS Iron work of Heavy sizes such as trusses,built up gates,record racks,roof workincluding supplyof all material,labour and T&P etc.required for prope r completion of work Vertical Post 4x12=48 Joints12x32= Base plate 300x300mm=0.09 Trusses 70x70x5mm vertical member top center member Tapper Members Long Purline 70x40x4mm grider main gateAdd Nut bolts & plats @ 5% |
| 16 | Supply and fixing of Galvanized corrugated iron roofing 24B.W.G in position including supply of all Material,labour Tools & plants etc.required for proper completion of the work and including wastage |
| 17 | Supply and fixing Ridge & velly gutter of 22B.W.G in position including supply of all Material,labour Tools & plants etc.required for proper completion of the work and including wastage |
| 18 | Applying two coat enaimel paint over priming coat on wood or steel and other metal surface including supply of all material,labour and T&P etc required for proper completion of work verical joints joints base plate 300x300mm = 0.09 trusses 70x70 mm top center member vertical member tapper member long purline70x40x4mm grider |
| 19 | gst |