Tender For Repairing And Renovations (Major Repairing) In Government Girls Inter College Jayrampur Banger - Providing and fixing glazing in Z-section windows, doors, ventilator shutters and partition etc. with Glass putty/ beading etc. complete 5mm. (As per SOR Ch 9 & SI.No. 410 (New Item) and 9.11 Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST. 2 Providingandlayingvitrifiedfloortilesin differentsizes(thicknesstobespecifiedby the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approvedmake,inallcoloursandshades, laidon20mmthickcementmortar1:4(1 cement:4coarsesand),jointingwithgrey cement slurry @ 3.3 kg/ sqm including groutingthejointswithwhitecementand matching pigments etc., complete.(As per SOR Ch 14 & SI. No. 14.26(b). Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST. 3 Paintingorvarnishingwithvalsperorother approved high grade enamel or superior syntheticcleanvarnishcompleteTwocoat over previously painted surface including supply of all materials, labour, Tools & plants etc.requiredforpropercompletionofthe work. Paint to be used should confirm ISI no. 105/106/133-1950.(As per SOR Ch 15 S.I. No. 647 & 648) . Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST. 4 Distempering(Two coat) with oilbound distemper of approved brand and manufacture and of requiredshadeonundecoratedwallsurfaceto give an even shade over and including a priming coatwithcementprimerofapprovedbrandand manufacture such as Berger, J&N, Shalimar,Asian Paint afterthoroughly brushingthe surface free from mortar dropping and other foreign matters andalso sand papered smooth including supply of all materials, labour,Tools & plants etc.required for proper completion of the work.(As per SOR Ch 15 S.I. No. 649 & 650) . Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST. 5 Finishing wall with weather coat by premium acrylic exterior paint applied @ 1.67 ltr /10 sqm (Asian or Berger Brand) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacture exterior primer applied @2.20 kg /10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plant etc. required for proper completion of the work.SI No Ch 15 Item No 15.23 New Item. Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST. 6 First class Brick Work in 1:4 cement & Coarse sand 2.20 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. As SOR No.305(a). Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST. 7 12mm thick Plaster with cement & Coarse sand of 1.25 fm mortar in 1:4 including supply of allmaterial labor etc. SI. No. 584(a). Including cost of all material, labour, T&P, royalty, labour cess, all taxes complete, but excluding cost of and GST.