| 1 | Dismantling brick or stone masonryin lime or cement mortar under and above 3m height including stacking the useful materials for reuse &removing the debris within 50mtrs lead includingalllabour,T & P, sundries, lead, lift, deliftandlabourcessetc complete and as per thedirection of theEIC. |
| 2 | Dismantling & removing 2.5 cm thick A.S flooring including stacking theusefulmaterialsfor reuse & removing the debris within 50 mtrsleadincludingalllabour, T & P,sundriesandlabourcessetccompleteandasperthedirectionoftheEIC. |
| 3 | Removing old lime or cement plaster from walls including racking out joints 12mm. deep and removing the debries within 50mtr leadincluding all labour, T & P, sundries,lead, lift, delift and labour cess etc complete in ground floor &1st floor and as per the direction of EIC. |
| 4 | Dismantling Squatting type water closet and urinal plates and mending good the damages to the floor including all labour T&P sundries and labour cess etc complete in ground floor and 1st floor andasperthedirectionoftheEIC. |
| 5 | Earth work in hard soil or gravelly soil within 50 mtrintiallead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and including cost of alllabour T&P, sundries and labour cessetc completeandasperthedirectionoftheEIC. |
| 6 | Brick work with fly ash brick (23x11x8) cm sizehavingcrushingstrengthnotlessthan75 Kg / sqcmwithdimensionaltolerance± 2 %incementmortar( 1:6) infoundation&plinthandsuperstructureincludingcost, conveyance, royalties,alllabour,T & P, sundries,labourcessandcuringetccomplete andasperdirectionoftheEIC. |
| 7 | 2.50 cm thick A.S flooring with cement concrete (1:2:4)includingpunning using 12mm size HGCB chipsincludingcost, conveyance, royalties,alllabour,T & P,sundries, labour cessandcuringetccomplete in ground floor and asperdirectionoftheEIC. |
| 8 | 16mm thick cement plaster (1:6) over brick or stone masonryincludingcost, conveyance, royalties, alllabour, lead, lift, delift, T & P,sundries, labourcess&curingetccompletein ground floor and 1st floor (in & out)andasperdirectionoftheEIC. |
| 9 | 12mm thick cement plaster (1:4) over brickwork /R.C.Croof, chajja, ceilingincludingadmixureofDr.fixitpidiproof( LW+) includingcost, conveyance, royalties, alllabour, T & P,sundries, labourcess&curingetccompletein ground floor and 1st floorroofceilingetc (in & out)andasperdirectionoftheEIC. |
| 10 | Cement concrete (1:2:4) for RCC works with 12mm size HGCB chipsincludingcost, conveyance, royalties,alllabour,T & P, sundries,labourcess, lead, lift, deliftandcuringetccomplete andasperdirectionoftheEIC. |
| 11 | Supplying, fitting and placing uncoated HYSD barTATA TISCON Fe500D / SAILISIbarreinforcementcompleteasperdrawingand technicalspecificationsincludingcost,conveyance,alllabour, T & P,sundriesandlabourcessetccompleteandasperdirectionoftheEIC. |
| 12 | Rigid and smooth centering and shuttering for RCC workincludingfalseworkanddismantlingthemaftercastingincludingcostofallmaterialscompleteincludingalllabour, T & P, lead, lift, delift, sundriesandlabourcessetccompleteandasperdirectionoftheEIC. |
| 13 | RCC foundation, plinth bandand footing bases of cloumns , mass concrete and precast RCC slab etc |
| 14 | Providing and finishing wall surfacewithacrylic wall putty/ cement based wall putty of approved shade ofAsian/ Berger/ Shalimar make and finished smooth and even surface to receive painting including cost of paint,scaffolding charges, labour , T & P, sundries,labour cess etc complete ingroundfloor& 1stfloor andasperdirectionoftheEIC. |
| 15 | Wall painting two coats withplastic emulsion paint of approved shade of Berger/ Asian/ Shalimar / Nerolac / Dulux orequivalent make on old work to give an even shade atallheight includingcost of paint, brush, putty,all labour, T&P, scaffolding, sundries, labour cess etc complete in ground floor and first floor andasperdirectionoftheEIC. |
| 16 | Paintingtwo coats to outside wallssurfacewith exterior weathercoatI.S.I paint ofapprovedshadeofAsian/Berger/Shalimar / Nerolac / Duluxoranyequivalent make on old work to give an even shade atallheightincluding cost ofweathercoatpaint, brush, putty, all labour, T&P, sundries,scaffolding and labour cess etc complete in ground floor and first floor andasperdirectionoftheEIC. |
| 17 | Priming one coat with red oxide primer of Shalimar/ Asian/ Berger/ Nerolac make including cost of primer, brush, all labour, T&P, sundries,labour cess etc. complete in ground floor & 1st floor etc complete and as per directionoftheEIC. |
| 18 | Painting two coats with any approved enamel paint ofAsian / Berger/ Shalimar/ Nerolacmakeincluding cost of paint, brush, all labour, T&P,sundries, labour cess etc complete in ground floor and 1st floor and asperdirectionoftheEIC. |
| 19 | Supplying&fixing watercloset, squattingpan( Indiantypewaterclosetpan) 580 x 440mmsize white glazed viterous Orissan pattern squatting pan confirmingtoIS 2556 : part :3- 2004dulyembededincementconcrete (1:4:8)using40 mmsizeHGCBmetalincludingcostofallmaterials, alllabour,T& P,sundries, conveyance, royalties,labourcess, lead, lift, delift& curingetccomplete ingroundfloorand1stflooretccomplete andasperdirectionoftheEIC. |
| 20 | Cement punning over plastered surfaceincludingcost,conveyance,alllabour,T& P, sundries,labourcess and curingetccomplete andasperdirectionoftheEIC. |
| 21 | Providing and fixing on wall face unplasticitzed rigid UPVC SWR Pipes 75 mm diameter conforming to IS: 14735 solvent fit type-type-Bsingle socketed pipe including cost of upvc SWR pipe, working pressure 4kg/sqcm, pipe clips, nails, all labor, T&P, sundries, scaffolding and labor cess etc complete andasperdirectionoftheEIC. |
| 22 | Providing and fixing on wall face unplasticitzed rigidUPVC SWR Rain water and ventilation Pipes 110 mm diameter conforming to IS: 14735 solvent fit type-type-A, including jointing single socketed pipe including cost of upvcSWRpipes, working pressure 4kg/sqcm, vent cowls, pipe clips, nails, all labor, T&P, sundries, scaffolding and labor cess etc complete andasperdirectionoftheEIC. |