| 1 | M&L dismantling carefully ofChimney smoke exhaust outlet of capacity 600000 Kcal/hr/50000 kcal/hr fabricated extension MS pipe of boiler cleaning, removal carbon by scraping out and washing with scalent and acid/kerosene oil etc and removing of fume waste carbonized materials and disposal of fume waste every after 500 Hrs operation incl re-assembling all the dismantled component to its original position for smooth functioning of chimney, Complete all as specified and directed by Engineer-in-Charge. |
| 2 | M&L for dismantling oil fired hot water generator of 6 Lakh K.Cal/hour capacity any model by unscrewing and removal of boiler side/end plates, CHS control panel, cleaning drum and hot water coil with scalent de-carbonizing, scraping out carbon ,dirt acculated in drum and across coil, overhauling, servicing incl re- assembling all the dismantled component to its original position with testing and commissioning, Complete all as specified and directed by Engineer-in-Charge. |
| 3 | M&L for dismantling oil fired hot water generator of 50000 K.Cal/hour capacity any model by unscrewing and removal of boiler side/end plates, CHS control panel, cleaning drum and hot water coil with scalent de-carbonizing, scraping out carbon ,dirt acculated in drum and across coil, overhauling, servicing incl re- assembling all the dismantled component to its original position with testing and commissioning, Complete all as specified and directed by Engineer-in-Charge. |
| 4 | M&L for dismantling carefully CHS pump and motor assembly up to 7.5 HP for repair/replacement and remove the broken impeller and worn out nuts/bolts washer\"s complete incl rewinding removal of burnt winding for field and stator, rewinding the same with super enamel copper conductor of existing gauge varnishing, heating, baking complete with re-assembling all the dismantled component to its original position with testing, Complete all as specified and directed by Engineer-in-Charge. |
| 5 | M&L for dismantling carefully CHS pump and motor assembly up to 3 HP for repair/replacement and remove the broken impeller and worn out nuts/bolts washer\"s complete incl rewinding removal of burnt winding for field and stator, rewinding the same with super enamel copper conductor of existing gauge varnishing, heating, baking complete with re-assembling all the dismantled component to its original position with testing, Complete all as specified and directed by Engineer-in-Charge. |
| 6 | M&L for disconnecting and removal of burner assembly of capacity 600000 kcal/hr, cleaning of Ecoflame burner for de-carbonized/deposited on combustion tank/blast tube with cleaning acid and fixing of burner nozzle for smooth functioning andre-assembling burner and fixed to its original position with testing , Complete all as specified and directed by Engineer-in-Charge. |
| 7 | M&L for disconnecting and removal of burner assembly 50000 kcal/hr, cleaning of Ecoflame burner for de-carbonized/deposited on combustion tank/blast tube with cleaning acid and fixing of burner nozzle for smooth functioning andre-assembling burner and fixed to its original position with testing , Complete all as specified and directed by Engineer-in-Charge. |
| 8 | S & F in replacement ofburner nozzle and calibration at require temperature and pressure for proper fuel automisation incl setting for correctmixing ratio of fuel and air for proper combustion of fuelwith base mounting unit for 600000Kcal/hr, Complete all as specified and directed by Engineer-in-Charge. Make : Ecoflame or Equivalent as approved |
| 9 | S & F in replacement ofburner nozzle and calibration at require temperature and pressure for proper fuel automisation incl setting for correctmixing ratio of fuel and air for proper combustion of fuelwith base mounting unit for 50000 Kcal/hr, Complete all as specified and directed by Engineer-in-Charge. Make : Ecoflame or Equivalent as approved |
| 10 | M&L for disconnecting hot water inlet & outlet of glycol base storage tank of capacity 1000 Ltrs draining out complete old water cleaning, removal of sludge acculated by scraping out, washing with scalent/acid for properly cleaning and welding wherever necessary to arrest leakages with re-assembling the disconnected pipes to original position and filling water including refilling/ charging of glycol (monoethylene glycol) MEG concentrate along with necessary additives and inhibitor in cognition and mixed in ratio 40% (glycol concentrate) 60 % of water and the freezing temperature of mixture shall be -40 degree centigrade, Complete all as specified and directed by Engineer-in-Charge. (Note : Monoethylene glycol will be measured and paid separately) |
| 11 | M&L for disconnecting hot water inlet & outlet of glycol base storage tank of capacity 150 Ltrs draining out complete old water cleaning, removal of sludge acculated by scraping out, washing with scalent/acid for properly cleaning and welding wherever necessary to arrest leakages with re-assembling the disconnected pipes to original position and filling water including refilling/ charging of glycol (monoethylene glycol) MEG concentrate along with necessary additives and inhibitor in cognition and mixed in ratio 40% (glycol concentrate) 60 % of water and the freezing temperature of mixture shall be -40 degree centigrade, Complete all as specified and directed by Engineer-in-Charge. (Note : Monoethylene glycol will be measured and paid separately) |
| 12 | Cleaning of diesel tank of capacity 1000 ltr PVC insulated galvanized iron tank using cleaning solution, removal of sludge acculated by scraping out, washing with scalent/acid for properly cleaning and welding wherever necessary to arrest leakages with re-assembling the disconnected pipes to original position and de-silting complete all as specified and directed by Engr-in-Charge. |
| 13 | Cleaning of diesel tank of capacity 150 ltr PVC insulated galvanized iron tank using cleaning solution, removal of sludge acculated by scraping out, washing with scalent/acid for properly cleaning and welding wherever necessary to arrest leakages with re-assembling the disconnected pipes to original position and de-silting complete all as specified and directed by Engr-in-Charge. |
| 14 | M &L for takingoutexisting squirrel cage motor ofcapacity 20 HP with pulleyfrom itsexisting position transportation ot civil workshop forrewindingincluding allthematerial required and transportingbackand fixing in its original position makingelectricalconnection andfixingfan beltand making it operational completeall a specified anddirectedby Engr in Charge |
| 15 | M &L for takingoutexisting squirrel cage motor ofcapacity 7.5 HP with pulleyfrom itsexisting position transportation ot civil workshop forrewindingincluding allthematerial required and transportingbackand fixing in its original position makingelectricalconnection andfixingfan beltand making it operational completeall a specified anddirectedby Engr in Charge |
| 16 | S & F fan beltin repair of AHU of capacity 35000 CFM , V-belt, belt number B1923 Lp/ B 74 complete all as specified and directed by Engr-in-Charge. |
| 17 | S & F fan belt in repairof AHU of capacity 35000 CFM , V-belt, belt number B3040 Lp/ B 118 complete all as specified and directed by Engr-in-Charge. |
| 18 | S & F fan belt in repair of AHU of capacity 10000 CFM , V-belt, belt number B1872 Lp/ B 72 complete all as specified and directed by Engr-in-Charge. |
| 19 | S & F fan belt in repair of AHU of capacity 10000 CFM , V-belt, belt number B1745 Lp/ B 67 complete all as specified and directed by Engr-in-Charge. |
| 20 | Supply, mixing and filling of mono ethylene Glycol concentrate along with necessary additives and inhibitor in cognition and sealed in barrels. The mixture freezing temperature shall be (-) 35°C, all as specified. The mode of payment and operation involved for this item shall be as under:-Note: (a) Mono Ethylene Glycol in concentrated from shall only be measured and paid under this item.(b) Material and labour for mixing, filling, preparation fo Glycol Charge to get total quantity of mixture including first filling required for operation of CHS plant and network having 40% quantity of treated water available at site and 60% of mono ethylene glycol supplied as above to attain the freezing temperature of mixture as (-) 35°C. The quoted rates shall be deemed to include the above activity/work.(c) The water for preparation of mixture will be supplied by MES without any extra charges for this item (only). The water shall be supplied at a point decided by GE and quoted rates shall deemed to be included for transportation of same from the take off point. (d) Any other additives and inhibitors as per the requirement laid down in relevant IS shall also deemed to included in quoted rates.(e) Empty barrels shall be the property of contractor.Make: Indian oil/Hindustan petroleum/Bharat petroleum/cal tax |
| 21 | M& L forInsulation of MS Pipes with 30 mm thick bonded mineral wool preformed SNAPON pipe sections of Density 144Kg/Cum confirming to IS 9842wrapped with chickenmesh wire netting 26 Gauge , 20 mm mesh including claddingwithAluminiumfoil 0.50 mmcomplete over25 MMPipeallasspecified and directedby Engrin Charge. |
| 22 | M& L forinsulation of MS Pipes with 30 mm thick bonded mineral wool preformed SNAPON pipe sections of Density 144Kg/Cum confirming to IS 9842wrapped with chickenmesh wire netting 26 Gauge , 20 mm mesh including claddingwithAluminiumfoil 0.50 mmcomplete over65 MMPipeallasspecified and directedby Engrin Charge. |
| 23 | M& L forinsulation of MS Pipes with 40 mm thick bonded mineral wool preformed SNAPON pipe sections of Density 144Kg/Cum confirming to IS 9842wrapped with chickenmesh wire netting 26 Gauge , 20 mm mesh including claddingwithAluminiumfoil 0.50 mmcomplete over80 MMPipeallasspecified and directedby Engrin Charge. |
| 24 | M &L forCleaningofAHU ofCapacity 35000 CFM, removing offilter cleaningwithblower , tighteningallloosescrews and fixingnewcanvascloth if theoldclothistorn andrefixing theFiltersinoriginalposition allto thesatisfaction ofEngrin Charge |
| 25 | M &L forCleaningofAHU ofCapacity 10000 CFM, removing offilter cleaningwithblower , tighteningallloosescrews and fixingnewcanvascloth if theoldclothistorn andrefixing theFiltersinoriginalposition allto thesatisfaction ofEngrin Charge |
| 26 | M&L for in repair / replacement PVC insulated multistrand copper conductor 6 Sqmm 3 core , 1100 volt light grade laid in trenches/surface/passing through pipes, including suitable lugs and accessories for making connections at both ends, complete all as specified and as directed. |
| 27 | S&F in repair butterfly valveof size 100 mm dia fitted incentral heating system or as requiredcomplete all as specified. |
| 28 | S&F in repair butterfly valveof size80 mm dia fitted incentral heating system or as requiredcomplete all as specified. |
| 29 | S&F in repair butterfly valveof size65 mm dia fitted incentral heating system or as requiredcomplete all as specified. |
| 30 | S&F in repair butterfly valve of size50 mm dia fitted incentral heating system or as requiredcomplete all as specified. |
| 31 | Attendingto complaintsfor maintenanceand repair ofBoiler/ Motor/ Starter/ AHU ofanytype andany specificationoranyaccessories relatedto Central Heating system of any description, any location . Rectifying the sameafter necessary repairs / replacement of defective parts including rectifying the same as per directions of concerned JE E/M and Engr in Charge. Note (i) T&P required atsiteshall bedeemed to beincludedin item rate (ii) Spare parts required shallbemeasured and paidseparately |
| 32 | Note :The work under subject BoQ (item No. 1.00 to 31.00 ) is meant for maint of sensitive installation at AF Stn Thoiseunder GE(AF) Thoise. The work shall be executed on ground on required basis. Contractor shall deploy sufficient resources to keep smooth working of CHS in the AF station. Contractor or his representative will daily attend the complaints at E/M complaint cell and in addition any breakdown shall be communicated to contractor or his representative by concerned Engineer-in-charge/JE E/M through phone call, text message, complaint slip and or in writing through site order book or through other means. Non complying of attending breakdown by contractor within 24 hours after notify the complaint, recovery @ Rs 1500/- per day shall be recovered from contractor\"s payment for each complaint so notified. |