Ramala Supply And Erection Of Internals Of Existing Esp F Exiting Esp Supply And Erection Of Internals Of Exiting Esp Of 145Tph/110Kg/Sq.Cm Capacity Boiler , Supply Of Field Internals Of All Three Fields Of Existing Esp Installed At 145Tph/110Kg/Cm2 Capacity Boiler , Collecting Electrode Ttr,Tbr, 1.2 Thk,A= 10395Mm Long(Eff.Ht=10.55 M) , E_Tube 44.5 O/D,Ttr,Tbr,80 Pin Spacing,A=11235 Mm Long,No Of Spike=256 Nos , Top Hanger,Ttr For C.E.- 480 Length For 7 No.Of C.E,A=3654 Mm , Bottom Hanger,Ttr For C.E.-480 Length For 7 No.Of C.E,A=3480 Mm , Tie Bar - Long, 400 Spacing For E-Tube Bottom Guide Frame , E-Tube Bottom Guide Frame 10 Gp [ Ttr ] 400 Spacing, 3.5 M Field , E-Tube Bottom Guide Frame 11 Gp [ Ttr ] 400 Spacing, 3.5 M Field , Ce Bracket & Hardware , Support Insulator (120Kv)- Indigenous, Cylinderical , Gasket For Cylindrical Support Insulator For 510 Od, 5 Thk, Non-Asbestos , Shaft Insulator 1016 Mm , Rapper Coil , Level Sensor , Tic , Rtd , Hypalon Boot , Worm Gear Clamp (Big End) , Worm Gear Clamp (Small End) , Row Card , Column Card , Hmi , Dc Thyristor Unit , Dismantling, Erection/Fitting, Commisning And Testing Of Field Internals Of All Three Fields Of Thermax Make Esp Installed At 145Tph/110Kg/Cm2 Capacity Boiler And Macke The Esp Complete Leak Proof.Field Supervision,Tools And Tackleand Free Technical Support/Helth Checkup During The Sesion (Free Off Cost) Will Be In The Scope Off The Contractor . The Work Include 1. Replacement Of All The Internals Of 3 Fields. 2. Alignment Of Allthree Fields. 3. Repairing Of Side Casing, Ilet/Outlet Nozzles , Hopper Vibrator, Doors Etc.