Construction Of X-Ing At Mahie Wardi Chingam 359- 1 Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : 2 Providing /laying of stone soling handpacked in foundation trenches including dressing, watering, compacting and all carriage up to site of work complete job 3 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:: 1:4:8 (1 Cement : 4 coarse sand : 8 crushed graded stone aggregate 40 mm nominal size ) excld.carriage of all materials involved complete 4 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:3:6 (1 Cement : 3 coarse sand : 6 crushed graded stone aggregate 20 mm nominal size ) excld.carriage of all materials involved complete 5 Reinforced Cement Concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1cement : 1.5 coarse sand : 3 crushed graded stone aggregate and 20mm normsl size aggregate excld cost of carriage 6 Centring and shuttering including strutting, propping etc and removal of formwork foundation, footings, bases of columns etc for mass concrete 7 Centring and shuttering including strutting, propping etc and removal of formwork Suspended-floors, roofs, landings, balconies and access platforms 8 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more 9 Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 10 Supply and filling of RBM incld spreading in layers, watering, dressing, compacting in layers not exceeding 30 cm in depth, rolling every third and top most layer to all lines and grades incld . Carriage of materials involved complete job 11 Providing and Fixing community Information Board including Providing Geotagged Photographs of work before, during & after execution complete job 12 Carriage of material by Mechanical Transport(a). Aggregates (Coarse and Fine) From nearst source to site of work avg.lead of 15KM s