| 1 | Electrical Items : |
| 2 | 11/0.433kV1000KVA Compact S/s |
| 3 | LT CLAMP WITH N&B ST POLE SP-55 |
| 4 | EARTHWIRE CLAMPFOR SP-55 WITHN/B |
| 5 | PP & CLAMP WITH N&B ST POLE SP-55 |
| 6 | Stay Clamp for SP-55 With Nut & Bolt |
| 7 | STAY CLAMP FOR SP-33 WITH NUT & BOLT |
| 8 | PP & CLAMP WITH N&B ST POLE SP-33 |
| 9 | LT CLAMP WITH N&B ST POLE SP-33 |
| 10 | Bracing Clamp For ST SP33 Top With N&B |
| 11 | Bottom Bracing Clamp For SP33-N&B |
| 12 | LT SACKKLE INSULATOR CLAMP |
| 13 | SHACKLE INSULATOR 100X115 mm WITH N&B |
| 14 | GI Pipe 4\"\" Dia |
| 15 | LT DistributionBox 3Phase 4Wire |
| 16 | Bolt & Nuts off Size |
| 17 | Piercing Connector 120 to 35 sq. mm |
| 18 | CHEMICAL EARTHING |
| 19 | Al LT Glands for 400sq. mm.. Cable |
| 20 | 11KV CABLE T/K 3X300mm² XLPE I/D |
| 21 | 11KV CABLE T/K 3X300mm² XLPE O/D |
| 22 | LT XLPE Al. Armoud Cable 3.5X400 sq.mm. |
| 23 | SERVICES (LABOUR) |
| 24 | EXCAVATION FOR FOUNDATION |
| 25 | Cement concreting work in ratio 1:2:4 |
| 26 | MAKING FOUNDATION OF CSS WITH ALL WORK |
| 27 | CHEMICAL EARTHING |
| 28 | ERECTION OF EARTHING ROD |
| 29 | FABRICATION OF STEEL |
| 30 | FIXING OF GI PIPE |
| 31 | EXCAVATION OF PIT FOR STAY SET |
| 32 | ERECTION OF 11 KV STAY SET |
| 33 | GROUTING OF STAY SET |
| 34 | EXCAVATION OF PIT FOR POLE |
| 35 | ERECTION OF SINGLE SP-33 POLE |
| 36 | ERECTION OF SINGLE SP-55 POLE |
| 37 | ERECTION OF SP-33 DOUBLE POLE |
| 38 | ERECTION OF SP-55 DOUBLE POLE |
| 39 | GROUTING OF POLE |
| 40 | MUFFING OF POLE |
| 41 | DISMANTLING OF SP-21/SP-23 SINGLE POLE |
| 42 | DISMANTLING OF SP-55 SINGLE POLE |
| 43 | DISMANTLING OF 11 KV LINE(DOG) |
| 44 | DISMANTLING OF GUARDING IN 11 KV LINE |
| 45 | PAINTING OF SP-33 POLE |
| 46 | PAINTING OF SP-55 POLE |
| 47 | FIXING OF TPMO |
| 48 | FIXING OF FUSE SET |
| 49 | FIXING OF LIGHTNING ARRESTOR |
| 50 | ERECTION OF BRACKET IN 11 KV LINE |
| 51 | LAYING OF DOG CONDUCTOR IN HT LINE |
| 52 | GUARDING OF LT/11 KV LINE |
| 53 | T-OFF CONNECTION COMPLETE 11 KV LINE |
| 54 | CONST.,INST.OF DANGER BOARD/ NUMBER PLATE |
| 55 | MAKING OF SECTION POLE |
| 56 | CARTAGESP-33 POLE, 0-20 KM |
| 57 | CARTAGESP-55 POLE, 0-20 KM |
| 58 | CARTAGE OF PETTY MATERIAL,0-20 KM |
| 59 | CARTAGE OF 250 KVA DTR, 0-20 KM |
| 60 | HEADLOAD CARTAGESP-33 POLE(0-1 KM) |
| 61 | HEADLOAD CARTAGESP-55 POLE(0-1 KM) |
| 62 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 63 | HEADLOAD CARTAGE OF 250 KVA DTR(0-1 KM) |
| 64 | Laying of LTXLPE ABC 3X120+1X95+1X16 Sq. |
| 65 | DISMAN LT XLPE ABC 3X120+1X95+1X16 Sq.mm |
| 66 | BACK CARTAGE OF PETTY MATERIAL,0-20 KM |
| 67 | DISMANTELLING OF EXITING FUSE SET |
| 68 | CENTERING AND SHUTTERING |
| 69 | BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM |
| 70 | ERECTION & LAYING OF 11KV CABLE 3X300 |
| 71 | ERECTION & LAYING LT ARM CABLE 3.5X400 |
| 72 | INSTALLATION OF J/KIT 11KV 3X300 I/D |
| 73 | INSTALLATION OF J/KIT 11KV 3X300 O/D |
| 74 | DISCONN & RECONN. OF SERVICE CONN. 1PH. |
| 75 | DISCONN & RECONN. OF SERVICE CONN. 3PH. |
| 76 | FIXING OF PIERCING CONNECTOR120-95 sqmm |
| 77 | ERECTION OF LT CABLE BOX FOR 3.5X400 |
| 78 | INSTALLATION OF 3.5X400 SQ. MM LT GLANDS |
| 79 | RELAYING RESAGGING3x120 SQ.MM AB CABLE |
| 80 | FENCING OF CSS WITH ALL ACCESSORIES |
| 81 | ERECTION OF 11/0.4 KV 1000 KVA CSS |
| 82 | PAINTING OF WIREMESH FENCING |