| 1 | Clearing the area of bushes by cutting inside area of ALHW residential colony area as and when required by the EIC, including disposing off the debris/ garbage within a lead of 50 mtrs including cost of all labour charges, GST, Labour Cess, Cost of minor tools etc. complete. |
| 2 | Cleaning of inspection chamber including cost of required materials and disposing the decomposed soil from the colony to outside, all labour charges and minor tools etc. complete (As and when required) |
| 3 | Cleaning of septic tank including cost of required materials and disposing the decomposed soil from colony to outside, all labour charges, minor tools etc. complete. (As and when required). |
| 4 | Painting with Synthetic enamel paint of approvedbrandand manufacture to give an even shade as per the direction of EIC, including cost of paint, brush & other materials, all labour charges, GST,labour welfare cess, minor toolsetc. complete. |
| 5 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubish to the dumping ground, all complete as per direction of Engineer-in-charge with cement morter 1:4 (1 cement, 4 River sand) and labour charges, GST, minor tools etc. complete. |
| 6 | Distempering with 1st quality acrylic distemper (Ready mix) having VOC content less than 50 grams/ liter of approved brand and manufacture to give an even shade as per the direction of EIC, including cost of paint, brush & other materials, all labour charges, GST, Labour welfare cess, minor Tools etc complete. Old work (one or more Coats). |
| 7 | Painting two coat with antifungal paint of approved brand and manufacture on old wall surface to give an even shade including cost of other material, transportation charges, labour charges scaffolding arrangements, cost of puty, minor tools, GST, labour cess etc., complete. |
| 8 | Painting with ready mixed paint of approved brand and manufacture in all shade, in steel work (two coat) and also including cost of all material, transportation of all material to work site, cost of all labour charges, labour cess, minor tools and GST etc, complete. |
| 9 | Taking out existing wooden door shutter, repair by cutting, painting etc. and re-fixing of repaired door shutters to existing door frames, including replacementof hinges with screws etc. as required, all complete as per the direction of EIC and labour charges, labour cess, minor tools and GST etc. complete. |
| 10 | Supply of manpower for assisting official works and attending various miscellaneous and unforseen works in office, including cost of all labour charges, cost of minor tools, labour cess and GST etc., complete |
| 11 | Skilled mazadoor (SM) |