|
| 1 | Supply of FRP Pultruded Greetings Yellow Color, Grit coating,U.V Resistant, Fire Retardant, Corrosion, Resistance, 60% Glass Complies standards stipulated FGMC of size- Size-W-15mm,H-25mm,C-25mm,Open space-20mm.Make:- Sintex /Sumip/Aeron |
| 2 | Supply of FRP I BEAM U.V Resistant, Fire Retardant, Non-Corrosive, 60% Glass GRP. of Size-254x127x12.7mm.Make:- Sintex /Sumip/Aeron |
| 3 | Supply of Heavy Duty M Clamp SS-304 |
| 4 | Supply of Good Quality Nylon Nuts bolts of size-40x8mm |
| 5 | Supply of SMC Cheaqured sheet anti-corrosive water resistant, UV protected, High temp resistant, conforming to UL 94 V0 Standards, ERDA Approved, Weather able, and suitable for all kinds of climatic conditions. Self-colored Fire retardant and High di-electric strength maintenance-free of size 1 Mtr. X 1 mtr. 10 mm thick. Make:- Sintex /Sumip/Aeron |
| 6 | Fixing of SMC sheet on the FRP structure. |
| 7 | Dismantling old rusted damaged M.S Railing from the chamber using the gas cutter & old material shifted to the sub-division store as per direction of Engineer in charge by heavy Manual Labor. |
| 8 | Making the temporary platform of make the workable space for hole grouting, Digging in the sump well with the help ofportable hydraulic machine / skilled staff & dismantle it after completion of work. |
| 9 | Making the hole of chamber wall by Hydraulic machine/ Manual Labor by using the Temporary platform with all safety Equipment’s for fixing of FRP IBeam/H Beam. |
| 10 | Grounding of FRP I BEAM on the sump well with the help of cement, Concerted, Floor Fill or other material fixing byManual Labor. |
| 11 | Providing of all required Safety Equipment’s / Articles like Safety belts, gum boots, ladder, helmet, hand gloves, Oxygen cylinder etc. as per NHRC Guidelines for executing the work. |
| 12 | Fixing of Pultruded Greetings on the FRP structured with Proper Floor Level & Alignment by using the non-reactive substance. |
| 13 | Loading & Un-loading Transport Charges |