|
| 1 | Distribution Boards & SocketsSupply and installation of Legrand/Hager/Havells/ MDS/Siemens make vertical modeldouble door TPN/SPN Distribution boards withminimun IP 43 of following sizes |
| 2 | 4 way TPN MCB DB with following components.a. 63 A , 100mA FP RCBO - 1 No Incomerb. 16 A SP MCB - 4 Nosc. 10 A SP MCB - 8 Nos |
| 3 | Supply |
| 4 | Installation |
| 5 | 12 Way Horizontal SPN MCB DB with followingcomponents.a. 32A DP RCBO incomer - 1 Nob. 10A/25A SP MCB - 8Nos |
| 6 | Supply |
| 7 | Installation |
| 8 | Supply and fixing of following Industrial Plug andSockets of L&T/ Legrand/ MDS/ Siemens/Schneider makeSupply and installation of 63 A SDFU ofL&T/Siemens/C&S make in sheet steel enclosurewith suitable cable boxes on either end andrequired hardware for fixing the SDFU on wall |
| 9 | Supply |
| 10 | Installation |
| 11 | Light fittings & Fans.Supply and installation of following light fittings ofPhilips/Wipro/Bajaj make with all accessories likesupporting hard ware downrods etc as required tocomplete the installation in all respects |
| 12 | Street LightLED luminaire with pressure die casthousing with minimum IP 65, lumen out put >13200 Lumens similar to Philips Dura LED |
| 13 | Supply |
| 14 | Installation |
| 15 | High Bay LED luminaire with pressure die casthousing with minimum IP 65, lumen out put >10000 Lumens similar to Philips Dura LED HighBay BY325P |
| 16 | Supply |
| 17 | Installation |
| 18 | Industrial LED tube light fitting with lumen output > 3500 Lumens similar to Philips TMC 501with required downrods/ tierods to suspend thefitting from ceiling |
| 19 | Supply |
| 20 | Installation |
| 21 | Industrial LED tube light fitting with lumen output > 1500 Lumens similar to Philips TMC 501with required downrods/ tierods to suspend thefitting from ceiling |
| 22 | Supply |
| 23 | Installation |
| 24 | Surface cum recess mounted LED fittings withlumen output>3000 similar to philips full glowRC380B including required supports(hooks/chain/wire etc) from ceiling to fix thefitting on false ceiling |
| 25 | Supply |
| 26 | Installation |
| 27 | Flood light LED luminaire with pressure die casthousing with minimum IP 65, lumen out put >7000 Lumens similar to Philips Uni flood BVP 120along with required accessories for fixing. |
| 28 | Supply |
| 29 | Installation |
| 30 | Supply and fixing of 230V,1200mm sweep Energyefficient 5 star rated BLDC ceiling fans withrequired downrods of CG/Khaitan/Orient/Bajaj/ Almonard/ Usha/Marathon make with all required accessories.Warranty: 2 Years |
| 31 | Supply |
| 32 | Installation |
| 33 | Supply and fixing of following exhaust fans ofCG/ Khaitan/ Orient/ Bajaj/ Almonard/ Usha/Marathon make with all required supports andaccessories 380mm sweep Three phase heavy duty industrialexhaust Fans with air delivery > 1900 M3/Hr |
| 34 | Supply |
| 35 | Installation |
| 36 | Supply and fixing of following exhaust fans ofCG/ Khaitan/ Orient/ Bajaj/ Almonard/ Usha/Marathon make with all required supports andaccessories 300mm sweep Single phase heavy duty industrialexhaust Fans with air delivery > 1100 M3/Hr |
| 37 | Supply |
| 38 | Installation |
| 39 | Cables and Terminations Supply and laying of following sizes of 1.1 KVgrade XLPE insulated, PVC extruded innersheathed, armoured, FRLS PVC ST2 outersheathed cable on cable trays/trenches with all accessories Make: Polycab / Universal / Torrent / RPG /KEI |
| 40 | 3 core 1.5 Sqmm flexible copper cable |
| 41 | Supply |
| 42 | Installation |
| 43 | Providing end terminations for following sizes of1.1 KV grade XLPE insulated and PVC sheathedarmoured cables with required hard ware likeheavy duty glands, heavy duty long neck copperlugs etc completeMake of glands/ Lugs:Dowells/Jainson/HMI/Comet3.5 core 240 Sqmm armoured Aluminum cable |
| 44 | Supply |
| 45 | Installation |
| 46 | 3.5 core 50 sqmm armoured Aluminum cable |
| 47 | Supply |
| 48 | Installation |
| 49 | 4 core 25 sqmm armoured Aluminum cable |
| 50 | Supply |
| 51 | Installation |
| 52 | 4 core 6 sqmm armoured Aluminum cable |
| 53 | Supply |
| 54 | Installation |
| 55 | 4 core 4 sqmm armoured Aluminum cable |
| 56 | Supply |
| 57 | Installation |
| 58 | 4 core 1.5 sqmm armoured Aluminum cable |
| 59 | Supply |
| 60 | Installation |
| 61 | Supply and providing of Straight Through jointsfor 415 V grade 3.5 core 240 sq mm XLPEinsulated & PVC sheathed armoured aluminiumconductor cables with RAYCHEM / 3M makeheat shrinkable cable joint kits, copper crimpingtype lugs and other accessories as required forcompletion of termination in all respects |
| 62 | Wiring and switchboards. Suypply and pulling of following sizes of flexibleFR copper wires of Polycab/Finolex / L&T/Anchor /GEM make to be drawn in 2mm thickPVC conduit/channels with ferruling on both endsexcluding cost of pipes, channels and switchboards. |
| 63 | 1.5 Sqmm FR Copper wire |
| 64 | Supply |
| 65 | Installation |
| 66 | 2.5 Sqmm FR Copper wire |
| 67 | Supply |
| 68 | Installation |
| 69 | 4 Sqmm FR Copper wire |
| 70 | Supply |
| 71 | Installation |
| 72 | 10 Sqmm FR Copper wire |
| 73 | Supply |
| 74 | Installation |
| 75 | Supply and installation of DLP plastic trunkingsystem of Legrand/Hager/Schneider make withrequired clamps for fixing, cover, end caps etccomplete including required angles and junctionsof following sizes105x50 |
| 76 | Supply |
| 77 | Installation |
| 78 | 32X20 |
| 79 | Supply |
| 80 | Installation |
| 81 | 32X12.5 |
| 82 | Supply |
| 83 | Installation |
| 84 | Supply and installation of modular surfacemounted PVC switch boards (without PVC box),with face plate, frame of following sizes with latestmodel rugged modular type sparkproof switchesand shuttered sockets of Crabtree/ Northwest/Legrand/ Schneider Electric 3 modular switchboard with 16A Switch and 16AUniversal socket |
| 85 | Supply |
| 86 | Installation |
| 87 | 6 modular switchboard with 4 Nos 6A Switchesand 1No 6A Socket |
| 88 | Supply |
| 89 | Installation |
| 90 | 8 modular switch board with 7 Nos 6A Switches, 1No Fan regulator |
| 91 | Supply |
| 92 | Installation |
| 93 | 12 modular switchboard with 2 Nos 6A Socketsand 8 Nos 6A Switches |
| 94 | Supply |
| 95 | Installation |
| 96 | Supply and installation of modular surfacemounted PVC switch boards with PVC box, faceplate, frame of following sizes with latest modelrugged modular type sparkproof switches andshuttered sockets of Crabtree/ Northwest/Legrand/ Schneider Electric 3 modular switchboard with 16A Switch and 16AUniversal socket |
| 97 | Supply |
| 98 | Installation |
| 99 | 6 modular switchboard with with 2 Nos 25A DPMCB |
| 100 | Supply |
| 101 | Installation |
| 102 | 6 modular switchboard with 4 Nos 6A Switchesand 1No 6A Socket |
| 103 | Supply |
| 104 | Installation |
| 105 | 8 modular switch board with 6 Nos 6A Switches, 1No 6A Socket |
| 106 | Supply |
| 107 | Installation |
| 108 | 12 modular PVC switchboards with 4 Nos 10Aswitches and 4 Nos 10A shuttered multipurposesockets |
| 109 | Supply |
| 110 | Installation |
| 111 | 16 modular PVC switchboards with 5 Nos 10Aswitches and 5 Nos 10A shuttered multipurposesockets |
| 112 | Supply |
| 113 | Installation |
| 114 | 18 modular PVC Switchboards with 9 Nos of 10ASwitches and 9 Fan Regulators |
| 115 | Supply |
| 116 | Installation |
| 117 | 12 modular PVC switchboards with 6 Nos 6Aswitches and 6 Nos Fan Regulators |
| 118 | Supply |
| 119 | Installation |
| 120 | Concealed wiring items |
| 121 | Supply and installation of 25 mm dia 1.6 mm thickSudhakar/AKG make PVC conduits confirmingto IS with accessories like bends, couplers etc inroof slab, wall including chasing of wall fixing theconduits and filling the chase with cement mortarand making good of the surface etc complete |
| 122 | Supply |
| 123 | Installation |
| 124 | Supply and installation of 25 mm dia 1.6 mm thickSudhakar/AKG make PVC Junction boxes in wallincluding chasing of wall, fixing the junction boxand filling the chase with cement mortar andmaking good of the surface etc complete |
| 125 | Supply |
| 126 | Installation |
| 127 | Supply and installation of Sudhakar/AKG make25 mm dia 1.6 mm thick PVC Deep junctionboxes in slab |
| 128 | Supply |
| 129 | Installation |
| 130 | Supply and installation of 150 mm dia PVC fanboxes with MS hook for supporting the fan on tothe ceiling with suitable cover |
| 131 | Supply |
| 132 | Installation |
| 133 | Supply and Installation of 16 guage sheet steelswitch board boxes of following sizes includingchasing of wall and filling the gap with cementmortar and making good of the surface etccomplete.Make: Legrand or similar |
| 134 | 3 Module |
| 135 | 6 Module |
| 136 | 8 Module |
| 137 | 12 Module |
| 138 | 16 Module |
| 139 | 18 Module |
| 140 | Earthing and Lightning |
| 141 | EARTHING SYSTEM: MAINTENANCE FREE EARTHING SYSTEM :Supply,installation,testing & commissioning of maintenance free earthing system & associated works, etc. completeas specified and instructions of E-I-C. A. Providing and making earth station comprising of 17 mm dia 3m long earthing electrode of high tensile low carbon steel rod molecularly bonded 250 micron copper coating on the outer surface, UL listed, filling bore with suitable earth enhancement compound as per IEC 62561-7 & manufacturer\"s standard, surrounding the earth electrode complete with all required materials & instructions of EIC. Note: The scope includes :- 1) Installation of earth rods including making pit/ drilling suitable size bore holes in normal soil/ hard rock as per manufacturer\"s recommendations & design. 2) Exothermic welding of joints between earth electrode & GI / tinned Cu strip and between GI / tinned Cu strips, used for interconnection of earth electrodes.B. Providing & making concrete chamber (1:2:4) of size 600 x 600 x 600 mm (inside dimension) with 10 mm thick MS hinged cover mounted on 40 x 40 x 5 mm thick angle iron frame, 50 x 6 mm & 150 mm longGI equipotential bar mounted inside chamber as per instructions of EIC. (For housing Equipotential bar) Note: Earth pits shall be used as 3 earth pits per mast pole. 3 pits per pole needs to be interconnected and no need to interconnect pole to pole earth pits.The date of testing and earth resistance value shall be written on the cover with black base with yellow paint. |
| 142 | Supply and fixing of 50 x 6 mm hot dip galvanisedGI strip for earthing by clamping onwalls/trays/trench with all required accessories |
| 143 | Supply |
| 144 | Installation |
| 145 | Supply and fixing of 25 x 6 mm hot dip galvanisedGI strip for lightning protection at a height of 12mby clamping on roof sheets/walls/columns withinsulators, clamps and all required hardware. |
| 146 | Supply |
| 147 | Installation |
| 148 | Supply and fixing of 25 x 3 mm hot dip galvanisedGI strip for lightning protection at a height of 12mby clamping on roof sheets/walls/columns withinsulators, clamps and all required hardware. |
| 149 | Supply |
| 150 | Installation |
| 151 | Civil Works |
| 152 | Excavation and back filling in cement concrete forlaying of cables, consolidation, removal of excessearth, etc complete. |
| 153 | Excavation and back filling in hard murram forlaying of cables, consolidation, removal of excessearth, etc complete. |
| 154 | Supply and installation of well burnt brick of size230 x 115 x 75 mm for cable protection |
| 155 | Excavation and back filling in hard murram forlaying of cables, consolidation, removal of excessearth, etc complete. |
| 156 | Laying of Cement concrete of 1:2:4 usingPazzolona Portland cement conforming to IS 1489, river sand and graded stone aggregates of 40mmmaximum size for foundation for LBS andTransformer |
| 157 | Supply and installation of 150mm NP2 class humepipes with required couplers for road crossing ofcables |
| 158 | Supply |
| 159 | Installation |
| 160 | Supply and laying of HDPE PLB Duct 40/33mm pipeswith required accessories like bends/junctionboxes etc complete. |
| 161 | Supply |
| 162 | Installation |
| 163 | Miscellaneous |
| 164 | Supply and installation of 300 mm width, 50mmheight with minimum 2mm thickness GIperforated cable trays |
| 165 | Supply |
| 166 | Installation |
| 167 | Supply and installation of 150 mm width, 50mmheight with minimum 2mm thickness GIperforated cable trays |
| 168 | Supply |
| 169 | Installation |
| 170 | Supply and installation of 2mm thick powdercoated 3 way MS junction boxes along with 6A 4way connectors |
| 171 | Supply |
| 172 | Installation |
| 173 | Supply and fixing of 100 mm X 25 mm anodisedAluminium cable tags engraved on black background with name of the load along with requiredhardware for fixing the lables on to the cables. |
| 174 | Supply and installation of cable route markers /joint markers made out of cast iron of size 250 x150 x 10 mm embossed with \"HT CABLE\" alongwith 40 x 40 x 6 mm MS angle of 600 mm longand 200 x 200 x 300 mm concrete block |
| 175 | Supply |
| 176 | Installation |
| 177 | Suply and installation of structural steel likechannels, angles etc for fabriaction and erection ofcable trays supports, light fitting supports etc andpainting of the same with red oxide and 2 coatsof grey enamel paint. Rate should also include therequired bolts and nuts for fixing of supportsMake of Structural steel: TATA, Vizag Steel, JindalIspat, SAIL |
| 178 | Supply |
| 179 | Installation |
| 180 | Supply and installation of Class B 25 mm dia MSconduit with ISI marking including requiredaccessories etc complete |
| 181 | Supply |
| 182 | Installation |
| 183 | Removal of old electrical items from an height of3.5M and shifting them to an identified locationwithin 2 Kms to enable rewiring and making goodfinish of the surface etc complet |
| 184 | Lights |
| 185 | Fan |
| 186 | condutes including Wires inside the condute and switch bords etc. |
| 187 | Telephone & Network |
| 188 | Supply & Installation of 2 modular surface mountInformation outlet with Face Plate & Surfacemount Box, RJ 11 jack/socket, required fixinghardware & accessories for completing the workincluding 2 pair telephone cable end termination inRJ 11 jack with ferulling as per relevantIS/ANSI/TIA/EIA standards.Make: D-link/Legrand/Havels |
| 189 | Supply |
| 190 | Installation |
| 191 | Supply & pulling of 2 pair 0.5mm telephone cablein already laid PVC conduit/trunking withrequired accessories etc to complete the job.(Delton/Finolex/Polycab make) |
| 192 | Supply |
| 193 | Installation |
| 194 | Supply and installation of 10 pair 0.5 mm dia jellyfilled telephone armoured cable of Delton/Finolex make to be clamped on wall with allrequired hardware |
| 195 | Supply |
| 196 | Installation |
| 197 | Supply and installation of telephone junctionboxes with ADCKRONE make out door box,back mounts, LSA plus disconnection module2/10 connectors with identification markings andother acceessories and hardware for mountingsuitable for terminating 20 pair, 0.5 Sqmm wires.The rate should also include termination of bothin coming and out going cables to the junctionboxes. |
| 198 | Supply |
| 199 | Installation |
| 200 | Supply & Installation of 2 modular surface mountInformation outlet with Face Plate & surfacemount Box, RJ 45 jack/socket, required fixinghardware & accessories for completing the workincluding 4 pair Cat-6 UTP cable end terminationin RJ 45 jack with ferulling & box labling as perrelevant IS/ANSI/TIA/EIA standards.Make: D-link/Legrand/Havels |
| 201 | Supply |
| 202 | Installation |
| 203 | Supply and laying of 12 Core 9/125um SingleMode, Outside plant steel Armoured, Jelly Filled,water blocked buffer tube, Flame retardant, LSZH& UV protected jacket & Sheath, Direct BurialCable (OSPA), OS2 Optical fiber cable (minimum10Gbps) in HDPE with required accessories forcompleting the job. Make: Commscope/Systimax/Panduit/Tyco(Amp) |
| 204 | Supply |
| 205 | Installation |
| 206 | Supply & pulling of 4 pair CAT 6 UTP networkcable of Tyco(Ampnet)/Commscope/Systimax /Panduit make with required accessories to bedrawn in existing PVC conduit/channels excludingcost of pipes / channels. |
| 207 | Supply |
| 208 | Installation |
| 209 | Street Light poles painting |
| 210 | Supply of metal primary (Red Oxcide) Paint |
| 211 | Supply of Aluminum Paint of make: Asian Paints, Nerolac,Dulux, Berger |
| 212 | Supply of white primer paint for Pedestalsmake: Asian Paints, Nerolac,Dulux, Berger |
| 213 | Supply of black and Yellow paint for pedestales make: Asian Paints, Nerolac,Dulux, Berger |
| 214 | Supply of Terpentoil |
| 215 | Scraping of rusted portion of pole, cleaning with wire brush, emer paper and painting of streetlight poles with one coat of primer to 4 to 6 mtr hight pole. |
| 216 | Scraping of rusted portion of pole, cleaning with wire brush, emer paper and painting of streetlight poles with one coat of primer to 7 to 11 mtr hight pole. |
| 217 | Cleaning and painting of street light poles with 2 coats of Alluminum paint including numbeing and painting for pedestal of pole of 4 to 6 Mtr hight |
| 218 | Supply |
| 219 | 300 KVAR Auto Powe Factor Correction Panel(APFC panel) |
| 220 | SITC of 300 KVAR APFC panel as per attched Specifications |
| 221 | Supply |
| 222 | Installation |
| 223 | ATS switch (Auto Transfer Switch ) with enclosure |
| 224 | SITC of 63A ATS with Enclouser a) 63A ATS = 1 No.b) Aux. Contactor with wiring = 1 Set.c) MS Box 400 (L) 500 (H) x 350mm(D) (Approx) |
| 225 | Supply |
| 226 | Installation |
| 227 | SITC of 240A ATS with Enclouser a) 240A ATS= 1 No.b) Aux. Contactor with wiring = 1 Set.c) MS Box 400 (L) 500 (H) x 350mm(D) (Approx) |
| 228 | Supply |
| 229 | Installation |
| 230 | Supply of 32 Amp ACCL Panel with enclosurea. I/C -1 and I/C-2 32 A 4P MCB : 2 Nosb. 32/32 Amp : 1 Nos (Auromatic control and changover with current limmiter)c. O/G 32 A MCB: 1 Nos d. I/C and O/G 4 Way Power terminals : 3 Nos e. M/s Powder coted Panel 400X600X350 : 12 Nos |
| 231 | Supply |
| 232 | Installation |