| 1 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 2 | Filling with M sand including cost and coveyance of all materials to work site and all labour charges etc. |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour chargesetc. |
| 4 | Brick work in C.M 1:3 mix using country bricks incuding cost and conveyance and all labour charges etc. A. UPTO BASEMENT |
| 5 | B. SUPER STRUCTURE Upto Lintel |
| 6 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc.Up to Basement A. UPTO BASEMENT |
| 7 | B. SUPER STRUCTURE Upto Lintel |
| 8 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. A. UPTO BASEMENT |
| 9 | B. SUPER STRUCTURE |
| 10 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. |
| 11 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. |
| 12 | Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc. |
| 13 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing.The Surface shall then be allowed to dry for atleast 48 hours.It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface.Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete].The Putty shoule be got approved by the Executive Engineer before use on work. |
| 14 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. |
| 15 | Providing granolithic floor finish of the following 50mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panellingwherever necessary and as directed by the departmental officers) |
| 16 | Towards the cost of steel door of size1.00mx2.10 m including all charges etc. |
| 17 | Towards the cost of steel Window of size1.00mx1.20 m including all charges etc. |
| 18 | Provision for electrification arrangements with service connection Light point |
| 19 | Tube Light fitting |
| 20 | Fan point |
| 21 | Fan |
| 22 | Plug point |
| 23 | DPI swtich of 500 V |
| 24 | G I Pipe |
| 25 | Service Wire |
| 26 | E B Board |
| 27 | Distembering using two coats of Distember from aÁoved companyincluding cost and conveyance of all materials to site and all labour charges etc completefor 10 sqm(Inner) |
| 28 | Painting two coats Emulsion paint over cement plastered wall including cost and conveyance of all materials to site and all labour charges etc complete |
| 29 | Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc. |
| 30 | Towards the cost and supply of 4\" Rainwater Downfall pipe fixing with clamps etc . |
| 31 | Towards the cost and supply of Cuddapah slab for Shelf including etc complete. |
| 32 | Provision for Rcc precast rings to RWH arrangements |
| 33 | Provision for Rcc precast slabRWH arrangements |
| 34 | Provision for Name Board |
| 35 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |