}

Tender For Hall Construction Work Near Shitla Mata Mandir, Tijara - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Founda, tijara-Rajasthan

Department Of Local Bodies has published Tender For Hall Construction Work Near Shitla Mata Mandir, Tijara - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Founda. Submission Date for this Tender is 28-08-2025. Building Work Tenders in tijara Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

50515499
Corrigendum : Tender For Hall Construction Work Near Shitla Mata Mandir, Tijara - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Material, Refilling After Laying Pipe/ Founda
Tender
Indian
Rajasthan
Tijara
28-08-2025

Tender Details

Tender For Hall Construction Work Near Shitla Mata Mandir, Tijara - Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m 2 Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 3 Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand). 4 Centring and shuttering with plywood or steel sheet upto two stories (each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. 5 Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand). 6 Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar. 1:4 (1 cement : 4 fine/ coarse sand) 7 Centring and shuttering with plywood or steel sheet upto two stories (each story of height upto 3.5 metre from floor level) includingstrutting, propping etc. and removal of form for : Suspended Floors, roofs, landings, balconies and acess platform. 8 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 9 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Hard drawn steel wire. 10 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). 11 Providing and fixing fully panelled /partly panelled double leaf shutters frame for windows and ventilators as per approved design and drawings with approved steel fittings as per Annexure ‘A’ and width of styles, bottom and top rails 75mm including intermediate rails 50mm wide, beading of 25mm x 15mm size on both faces : Shesham wood grade I.

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 18-08-2025 Date Corrigendum Date 25-08-2025
2 20-08-2025 Corrigendum Date 28-08-2025

Key Value

Document Fees
INR 500 /-
EMD
INR 8000.0 /-
Tender Value
INR 4 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail