Tender For Construction Of 67 Nos. Watershed Structures - Package No. 29, Block - Bajju Khalsa, Gram Panchayt - Bajju Khalsa, Bajju Tejpura Work- Farm Pond-26, Tanka - 39, Recharge Structure - 2 - Excavation work by JCB machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles, and maintaining section/profile of bund (in cut area) including lifting and lowering upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 Cubic Meter Machinery Work Machinery Work in Soft Soil2 JCB Excavation work by machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles and section of bund (in cut area)/maintaining profile including lifting and lowering upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 cubic metre Machinery work Machinery work in Hard Soil3 Preparation and dressing the sub grade including removal ofirregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for(b) Side slopes (WRD Item 14b Chapter IX)4 Supply of 500 HTP HDPE Geo Membrane BIS 15351/2015 (Horticulture department circular 39-134Date 20.04. 2023)5 Laying, welding & testing of 1 mm HDPE Liner (WRD Item 44 Chapter V)6 Fencing of 150cm height Iron post 35X35X5mm at 3m distance and 30cm deep in ground Cement concrete 1:3:6 (.30X.30X.60m) corner and every 10th post Supporting with 35X35X5mm iron posts, along with black barbed wire in 4 lines, tying and fitting with GI staple wire between 2 posts. Analysis For upto 27 m. length fencing, including earthwork (0.54 cm concrete)7 Excavation of earth upto 1.5 m depth in foundation, trench, drain, tamping the bottom, pouring water, beautifying the sides, taking out the excavated earth, filling the empty spaces with earth again after filling the foundation and disposal of the remaining earth upto a distance of 50 m8 Foundation and plinth first class brick masonry in cement-gravel 1:6 mortar, including closing the side cracks and tamping.9 20 mm cement plaster on wall by mixing cement-gravel in 1:6 ratio, scraping the joints and regular watering for 14 days.10 Iron work in grill/gate etc. which includes cutting, mounting and fixing flat cone, T and corrugated (channel), etc. (For Display board)11 Applying enamel paint in 3 layers to give even shade. Making even surface on new/old work. (For Display board)12 Land clearing including removing small bushes vegetative cover etc.13 JCB Excavation work by machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles, and maintaining section/profile of bund (in cut area) including lifting and lowering initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 Cubic Meter Machinery Work Machinery Work in Soft Soil14 JCB Earth work by machine/tractor with scraper, Breaking of clods, Sorting of grass & pebbles, and sectioning of bund (in cut area)/maintaining profile including lifting and lowering of initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from 01/02/2017) Unit 1 cubic metre Machinery work Machinery work in Hard Soil15 Earth work by manual for foundation including maintain side slopes watering safe disposal of excaveted soil for ordernary soft soil. 16 Over brunt brick kharanja in Cement moartar 1:6 in bond or camber and grade filling all joints of khranja and spreading moartar on bricks.17 Cement concrete in 1 cement : 2 gravel : 4 stone aggregate ratio with aggregate of 12mm nominal size including pouring, ramming and tamping etc.18 First Class Brick Masonary in CM 1:6 including curing, rackings of joints etccomplete in all respect19 25mm thick plaster on new work including 14 days curing and racking of joints in CM 1:420 Supply and proper fixing of stone patti lintals with joint by two stone strip fill joints with concrete cement . 21 Laying of roof with top quality stone strips, filling joints at top and bottom with cement mortar in 1:4 ratio with stone arch for 1.5 m to 2.4 m span22 Putting of vortex in cement mortar 1:4 in pieces of baked brick or small pieces of stone, supplying brick pieces on top of strip roof and also23 12 mm thick plaster on roof in CM 1:6 including 14 days curing complete in all respect24 S & F 22 gauge GI sheet opening cover which has all frame in 25x25x3 mm L section iron, 10 mm gril including argol, holefas and other items complete all respect.25 Laying of extra baked bricks with cement gravel mortar 1:6 in any wound, camber and grade and filling cement mortar 1:6 in joints and spreading it over the bricks. 26 S&F pvc pipe for outlet 110 mm dia for over flow27 S & F water Inlet cover Iron Jali28 Writee work related information with good qualityEnamel paint on pytan outer surface in 3 Layers to give even shade29 Supply and laying of 45-90 MM size Gitti30 Supply and laying of 40 MM size Gitti31 Supply and laying of 20 MM size Gitti32 Supply and laying of 6/10/12 MM size Gitti33 Providing and Lowering of ISI mark PVC-U casing and screenpipe as per IS: 12818 : 2010 or amended upto date having pipe thickness as per IS code suitable for TW and DCB with threading ,winding with superior quality of plastic mesh & rope in three layers with end cap complete as per technical specification and direction of Engineer In charge. (200 mm dia.)