Tender For Construction Of 84 Nos. Of Watershed Structures. - Package No. 31, Block - Kolayat, Gram Panchayt -Mandal Charnan, Govindsar Work- Farm Pond-63 Nos, Tanka - 19 Nos, Rtwhs With Recharge Shaft- 2 Nos - Excavation work by JCB machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles, and maintaining section/profile of bund (in cut area) including lifting and lowering upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 Cubic Meter Machinery Work Machinery Work in Soft Soil2 JCB Excavation work by machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles and section of bund (in cut area)/maintaining profile including lifting and lowering upto initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 cubic metre Machinery work Machinery work in Hard Soil3 Preparation and dressing the sub grade including removal ofirregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for(b) Side slopes (WRD Item 14b Chapter IX)4 Supply of 500 HTP HDPE Geo Membrane BIS 15351/2015 (Horticulture department circular 39-134Date 20.04. 2023)5 Laying, welding & testing of 1 mm HDPE Liner (WRD Item 44 Chapter V)6 Fencing of 150cm height Iron post 35X35X5mm at 3m distance and 30cm deep in ground Cement concrete 1:3:6 (.30X.30X.60m) corner and every 10th post Supporting with 35X35X5mm iron posts, along with black barbed wire in 4 lines, tying and fitting with GI staple wire between 2 posts. Analysis For upto 27 m. length fencing, including earthwork (0.54 cm concrete)7 Excavation of earth upto 1.5 m depth in foundation, trench, drain, tamping the bottom, pouring water, beautifying the sides, taking out the excavated earth, filling the empty spaces with earth again after filling the foundation and disposal of the remaining earth upto a distance of 50 m8 Foundation and plinth first class brick masonry in cement-gravel 1:6 mortar, including closing the side cracks and tamping.9 20 mm cement plaster on wall by mixing cement-gravel in 1:6 ratio, scraping the joints and regular watering for 14 days.10 Iron work in grill/gate etc. which includes cutting, mounting and fixing flat cone, T and corrugated (channel), etc. (For Display board)11 Applying enamel paint in 3 layers to give even shade. Making even surface on new/old work. (For Display board)12 Land clearing including removing small bushes vegetative cover etc.13 JCB Excavation work by machine/tractor with scraper, breaking of clods of excavated soil, sorting of grass & pebbles, and maintaining section/profile of bund (in cut area) including lifting and lowering initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from Date 01/02/2017) Unit 1 Cubic Meter Machinery Work Machinery Work in Soft Soil14 JCB Earth work by machine/tractor with scraper, Breaking of clods, Sorting of grass & pebbles, and sectioning of bund (in cut area)/maintaining profile including lifting and lowering of initial lead 250 m and lift upto 3 m. Draft based on chapter 5th of irrigation page number 32 to 34 (Valid from 01/02/2017) Unit 1 cubic metre Machinery work Machinery work in Hard Soil15 Earth work by manual for foundation including maintain side slopes watering safe disposal of excaveted soil for ordernary soft soil. 16 Cement concrete 1 cement : 2 gravel : 4 stone aggregate in ratio of 12mm nominal size aggregate including pouring, ramming and curing etc.17 First Class Brick Masonary in CM 1:6 including curing, rackings of joints etccomplete in all respect18 Supply and proper fixing of stone patti lintals with joint by two stone strip fill joints with concrete cement .19 Laying of top class stone strip roof, filling joints at top and bottom with cement mortar in ratio 1:4 along with stone arch 1.5m to 2.4m span20 Putting swirls in cement mortar 1:4 in pieces of baked brick or small pieces of stone, supplying on top of strip roof. Pieces of baked bricks21 12 mm thick plaster on roof in CM 1:6 including 14 days curing complete in all respect22 20 mm thick plaster on roof in CM 1:6 including 14 days curing complete in all respect23 Supply of 22 gauge plain GI sheet window including entire door frame 25x25x3 mm iron cone, 10 mm grill with arm, 2 nos. latches and 4 nos. GI sheet. Analysis for 1.08 sq.m. window24 Supply and installation of iron grille (125 mm) diameter.25 20 mm thick plaster on new work including 14 days curing and racking of joints in CM 1:426 Laying of over baked bricks, laying cement gravel mortar in 1:6 in any void, camber and grade and filling cement mortar in joints with 1:6 and spreading it over the bricks.27 S& F pvc pipe for outlet110 mm dia for over flow28 Applying enamel paint in 3 layers to give even shade Creating even surface on new work/old work. On new work.29 Clearing of forest, including cutting of ordinary vegetation and bushes.30 Excavation by labour including loading, unloading, disposal soil within intial lead 50 mtr and lift up to 1.5 mtr in dry or moistincluding Dressing of exacavted area , Back filling and dewatering wherever required complete all respect. (Loose soil). In soft soil/ordinery soil.31 Excavation by labour including loading, unloading, disposal soil within intial lead 50 mtr and lift up to 1.5 mtr in dry or moistincluding Dressing of exacavted area , Back filling and dewatering wherever required complete all respect. (Loose soil).In hard soil. 32 Excavation by labor including loading, unloading, disposal soil within intial lead 50 mtr and lift up to 1.5 mtr in dry or moist including Dressing of excavted area , Back filling and dewatering wherever required complete all respect. (Loose soil). Lift upto 1.5 to 3.00 meters33 Over brunt BrickKharanja cement sand masala in 1: 6 in any wound and chamber and grade and cement masala 1: 6 in joints, spreading over bricks.34 Cement concrete in foundation and plinth with stone ballast size 40mm including curing and compaction etc. in 1:4:8 mix.35 First Class Brick Masonary in CM 1:6 including curing, rackings of joints etc. complete in all respect.36 S & F of 100 to 150 Thick stone lintals with proper cement Mortar and concrete curing and other complete all respect37 Laying of roof of First class stone slabs, filling with cement sand in 1:4 ratio with stone chip in the joints from top and bottom. 1.50 m to 2.40 m span.38 Brick Bat on roof in CM 1:439 20 mm thick plaster on roof in CM 1:6 including 14 days curing complete in all respect.40 12 mm thick plaster on roof in CM 1:6 including 14 days curing complete in all respect.41 Providing and fixing M.S. Sheet (20 swg) thick single leaf door shutter in angle iron frame 35х35х5mm suitability diagonally braced with 25х3mm flat iron above and below lock rail of size 50х5mm beading extra including all fittings. (PWD BSR 2013 Item N0. 9.17.2).42 Supply and installation of iron grille (125 mm) diameter.43 20 mm thick plaster on new work including 14 days curing and racking of joints in CM 1:4.44 S & F PVC pipe for outlet (110mm diameter).45 Slogan making, Photograph etc.