| 1 | Rough excavation not exceeding 1.5 m deep and getting out in soft/loose soil, complete all as specified and directed. |
| 2 | Removing excavated material exc 500 m but not exceeding 1.5 KM and depositing where directed at a level not exceeding 1.5 m above the starting point, complete all as specified and directed. |
| 3 | M&L for HDPE bags of size 84 cm x 36 cm confirming to IS-6192-1994 duly filled with sand, complete all as specified and directed.Note :- Sand shall be measured and paid seperately under respective item. |
| 4 | Labour only for Screening of sand upto depth of 0.50m removing of all foreign materials, metals, pebblesetc and again spreadingand levelling of sand to true surfacesin gunner target area including all rubbish away from target area, complete all as specified and as directed. |
| 5 | Supply, filling, spreading and leveling of sand (as per sample) infront gunnery target area, complete all as specified and directed.Note : (i) Deduction for 10% shall be made for bulkage during measurement and payment.(ii) The contractor shall start item No 1 to 5 within 15 days from the instructions received on site order and the whole work shall be completed within 30 days, if contractor fails to complete work within given time frame a penalty of Rs 2500 per day of delay will be charge from contractor. |
| 6 | M&Lfor Leveling of bomb exploded area by cutting/filling of ground in layers any depth of filling below ground level and finishing to required surfaces,Ploughing tillers, leveling and marking furrows in the existing site of target area (depth of ploughing/ furrowing shall be as approved at site) as per required gradient and shape including removal of grass, shurbs rubbish, vegetation etc away from the end of target area as required from out side of target area (if required) complete all as specified and directed.Note :- 1. Unit rate is included for T& P comprising of tractor {not less than 50 HP and agriculture/ earth instruments/ drivers, fuel and extra labour (if required)}.2. Payment shall be made on the basis of hours of working recorded in the logbook duly maintained and signed by the contractor, JE, Engr-in-Charge and users.3.Hour meter should be serviceable / in working condition. 4.work shall be carried out as and when required.5.Condition 46 of IAFW 2249 is not applicable on item No 6 & 7 as scope of item is of repeated nature and will be executed on requirement basis during the currency of the contract and will be measured and paid accordingly. |
| 7 | M & L for filling lime Class \"B\" confirming to IS 712-1984 in Target area at the early morning i.e. before 06:30 AM or as and when required for night firing @ 350 Kg per day (minimum) including spreading & leveling, complete all as specified and directed. |
| 8 | Demolition of brick work built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facing, dressed stone masonry and precast concrete articles and removal ofrubbish outside MOD land, complete all as specified and directed. |
| 9 | Taking down of cement plaster on brick or stone walls, etc including racking out joints, hacking for key, scrubbing down with water removal of rubbish outside MOD Land, complete all as specified and as directed. |
| 10 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for,removal ofrubbish outside MOD land, complete all as specified and as directed. |
| 11 | M&L for brick work with sub class \"B\" bricks (old size bricks) straight or curved on plan exc 6 m mean radious built in cement mortar 1:6, complete all as specified and directed. |
| 12 | M&L for rendering 15mm thick in cement mortar 1:4 on fair faces of brick work or concrete surfaces & finished even and smooth without using extra cement, complete all as specified and directed. |
| 13 | M&L for cement concrete type B-1 (1:2:4) using 20 mm graded crushed stone aggregate as in copings, complete all as specified and directed. |
| 14 | M & L for preparation of old painted surfaces of concrete and applying one coats of Road marking paint(Fluorescent paint) white /Golden yellow coloured (dashes, arrow, Pyramid base line, foul line fire line) exceeding 10 cm width or girth, complete all as specified and directed. |
| 15 | M & L for preparation of new surfaces of concrete and applying two coats of Road marking paint (Fluorescent paint) white /Golden yellow coloured (dashes, arrow, Pyramid base line, foul line fire line) exceeding 10 cm width or girth, complete all as specified and directed. |