}

Tender For 01. Construction Of Sarvjanik Hall And Other Civil Work At Sargara Samaj Shamshan Pipar City - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Materia, Jodhpur-Rajasthan

Department Of Local Bodies has published Tender For 01. Construction Of Sarvjanik Hall And Other Civil Work At Sargara Samaj Shamshan Pipar City - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Materia. Submission Date for this Tender is 21-08-2025. Building Work Tenders in Jodhpur Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

50455661
Corrigendum : Tender For 01. Construction Of Sarvjanik Hall And Other Civil Work At Sargara Samaj Shamshan Pipar City - Earth Work In Excavation In Foundation, Trenches Etc. Including Dressing Of Sides And Ramming Of Bottoms, Including Getting Out The Excavated Materia
Tender
Indian
Rajasthan
Jodhpur
21-08-2025

Tender Details

Tender For 01. Construction Of Sarvjanik Hall And Other Civil Work At Sargara Samaj Shamshan Pipar City - Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m 2 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). 3 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concret 4 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. 5 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. 6 Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform. 7 Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1;2 (1 Cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size). 8 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : 1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix) 9 Reinforced cement concrete work inbeams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto two stories excluding the cost of centring, shuttering, finishing and reinforcement: M-25 Grade Concrete (1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) -As per design mix 10 Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) 11 Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories 12 Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars. 13 Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. 14 Brick work with FPS bricks of class designation 75 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) 15 Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete.75mm thick 16 Cement plastering including T&P, scaffolding, material and completelabour, including cost of water, curing, racking of joints etc. with 20mm mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement : 4 fine/ coarse sand) 17 Stone work in plain ashlar in super structure upto floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) including pointing with cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade red sand stone 18 Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work (two or more coats) over and including priming coat withcement primer. 19 Providing and fixing Marble stone flooring table rubbed, 15-18 mm thick over 20mm (Av.) thick base of CM 1:4 (1 cement : 4 coarse sand) or slab in wall, steps, pillars, counters, jambs, shelves, sills etc laid over 12mm (Av.) thick base of CM 1:3 (1 cement : 3 coarse sand), jointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 12-08-2025 4150 Date 11.08.2025 Date 21-08-2025

Key Value

Document Fees
INR 500 /-
Tender Value
INR 15 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail