|
| 1 | Finishing walls with water proofing cement paint of required shade: Old work (one or more coats applied @ 2.20 kg/10 sqm) over priming coat ofprimer applied @ 0.80 litrs/10 sqm complete including cost of Priming coat |
| 2 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cementpaint surface |
| 3 | Oil bond distemper on old surface with approved make and manufacture and required shade on old work to given an even shade. Two coat on old work |
| 4 | Water proofing on roof surface by using damp proof material with two coat i/c supply of all material, labour T&P etc. |
| 5 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 6 | Providing and applying white cement based putty single coat of average thickness 1 mm, of approved brand and manufacturer, |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work of approved brand and manufacture |
| 8 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineerin-Charge.With cement mortar 1:4 (1 cement : 4 fine sand) |
| 9 | S/Fof PVC pipe including all cost of materials, labours & T&P etc. requiredfor proper completion of work. |
| 10 | (A) 110 mm dia |
| 11 | (B) 75 mm dia |
| 12 | S/F of PVC plain bend including all cost of materials, labours & T&P etc. requiredfor proper completion of work. |
| 13 | (A) 110 mm dia |
| 14 | (B) 75 mm dia |
| 15 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 16 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 17 | Centering and Shuttering work i/c strutting,proping etc. and removal of formi/c all cost of materials,labours,T&P etc.For:-Suspended floors,roofs,landings,balconies and accessplatform etc. |
| 18 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) |
| 19 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety eatures for the workmen etc. complete as per directions and approval of Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and aintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the xisting item to be done. |