|
| 1 | Foundation excavation in stoney earth and gravels mixed with stone and boulder |
| 2 | R.C.C. work M-20 grade using 20mm.and down grade HBG |
| 3 | Supplying,fitting & placing uncoatedHYSD bar reinforcement including all cost & carriage including labour charges,etc. |
| 4 | Rigid and smooth centering and shuttering for R.C.C. works |
| 5 | R.C.C foundation, base, G.B |
| 6 | Lintel |
| 7 | Column & Beam |
| 8 | Chajja / Roof slab |
| 9 | Flyash Brick masonry in cement mortar (1:6) in foundation and plinth. |
| 10 | Filling in foundation and plinth with sand well watered and rammed,etc. |
| 11 | Cement concrete (1:3:6) with 4cm size hard granite crusher broken metal,etc. |
| 12 | Cement Concrete (1:2:4) with 12mm CBHG chipps |
| 13 | Fixing Vitrified tiles of minium thickness 16 mm dungri verityin floors treads or steps and landing on 25mm thick bed of cement mortar 1:1(1cement : |
| 14 | Fixing Vitrified tiles of minium thickness 16 mm dungri verityin dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed |
| 15 | 2.5cm artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size hand broken granites chips. Etc complete. |
| 16 | 12 mm thick cement plaster in C.M.(1:6) in external surface of wall,etc. |
| 17 | 16 mm thick cement plaster in C.M.(1:6) in internal surface of wall,etc. |
| 18 | 6 mm.thick cement plaster in C.M.(1:4) for ceiling plaster including deep chiping,etc. |
| 19 | 20mm. thick cementplaster in c.m. 1:4 including cost conveyanceroyality of materials |
| 20 | Supplying fitting &fixing of G.I Door & Window including all cost of material & Laour charges,etc. |
| 21 | Finishing wall surface of walls with Acrylic wall putty (Water based) of approved make and finished smooth and even surface to receive painting |
| 22 | Water bound cement priming one coat with primer of approved quality over wall. |
| 23 | Two coat of plastic emulsion paint of approved quality to in side finishing area,etc. |
| 24 | Cost of Sign Board (1.50Mtr x 1.80Mtr) complete as directed by Engineer-in-Charge |