| 1 | Centralized Materials |
| 2 | PCC Pole 8.5 Meter Long |
| 3 | ACSR Weasel Conductor |
| 4 | ACSR Dog Conductor |
| 5 | 11KV Pin Insulator with Pin |
| 6 | 11KV Disc Insulator with Fitting |
| 7 | LT ABC (1x25+1x16)sqmm |
| 8 | LT ABC (3x50 + 1x35 + 1x16) sqmm |
| 9 | LT ABC (3x95 + 1x35 + 1x16) sqmm |
| 10 | 11KV XLPE (3x120) sqmm |
| 11 | I/D and O/D Cable Jointing Kit Sutable for 11KV 3x120mm2 XLPE Cable |
| 12 | G.I. Wire |
| 13 | Stay Complete |
| 14 | Earthing Complete |
| 15 | G.I. Barbed wire |
| 16 | T-Off Channel |
| 17 | 33KV Pin Insulator set |
| 18 | 33KV Disc Insulator set |
| 19 | Three Phase Distirbution Box |
| 20 | 11KV V type Steel X-Arm |
| 21 | G.I. wire for Guarding@22KG per Pole |
| 22 | Gaurding Angle |
| 23 | Decentralized Materials |
| 24 | G.I. Pipe Dia 6\" inch |
| 25 | F Clamp |
| 26 | Clamp for T-OFF |
| 27 | Clamp with Nut & Bolt |
| 28 | LT PVC Un-Armoured 4x16 Cable sqmm |
| 29 | Three Phase Distirbution Box Clamp |
| 30 | Pearcing Coonnector |
| 31 | Stone Pad |
| 32 | F-Clamp, Nut & Bolt |
| 33 | Stay Clamp |
| 34 | Stay Clamp STP |
| 35 | I Hook Suspension Set |
| 36 | Deadend Set |
| 37 | L.T. Clamp for PCC Pole |
| 38 | X-Arm Clamp |
| 39 | Danger Board |
| 40 | Clamp for Double Pole |
| 41 | X-Arm Clamp of STP Pole |
| 42 | D/P Clamp of STP Pole |
| 43 | 10 KVA T/F Clamp |
| 44 | Labour & Erection Charges |
| 45 | Work of carriage of 8.5 meter PCC pole along with loading/unloading from store center Shahupuri / Rajatalab to work site as per RESSPO standerd. |
| 46 | Work of Erection of 8.5 meter PCC pole with digging & Fitting with all Accessories (X-Arm, Pin Insuletor, Disc Insuletor, T-Off, T/F Base, Top Channel, Droper Angle, D.O. Fuse Set, G.I. Pipe 6\" Dia, Holding Clamp with Nut & Bolt, F-Bracket, Barbed Wire, Danger Board, Garding wire, Guarding Angle etc.)as per RESSPO standard. |
| 47 | Work of Carriage of11KV XLPE Cable 3x120 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 48 | Work of Cable Laying of 11KV XLPE 3x120sqmm Cable After digging & Making of Cable Trench Method (Sand, Brick & Stone Slab be provided by contractor) Including Loop as per RESSPO standared. |
| 49 | Work of Cable Laying in Air with Proper Pole Fixing of 11KV XLPE Cable 3x70 / 3x120 sqmm as per RESSPO standared. |
| 50 | Work of Carriage of 25 KVA Transformer with loading/unloading from store center Shahupuri / Rajatalab to work site as per RESSPO standerd. |
| 51 | Work of Carriage of 63KVA Transformer with loading/unloading from store center Shahupuri / Rajatalab to work site as per RESSPO standerd. |
| 52 | Work of Maunting 25 KVA Transformer on D/P and Energizing with all Accessories (Lug, Cable) after installation as per RESSPO standard. |
| 53 | Work of Maunting 63 KVA Transformer on D/P and Energizing with all Accessories (Lug, Cable) after installation as per RESSPO standard. |
| 54 | Work of Carriage of ACSR Weasel Conductor with All Accessories(X-Arm, Pin Insuletor, Disc Insuletor, T-Off, T/F Base, Top Channel, Droper Angle, D.O. Fuse Set, G.I. Pipe 6\" Dia, Holding Clamp with Nut & Bolt, F-Bracket, Barbed Wire, Danger Board, Guarding wire etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 55 | Work of Erection of ACSR Weasel Conductor with All Accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 56 | Work of Carriage of ACSR Weasel Conductor with All Accessories (X-Arm, Pin Insuletor, Disc Insuletor, T-Off, T/F Base, Top Channel, Droper Angle, D.O. Fuse Set, G.I. Pipe 6\" Dia, Holding Clamp with Nut & Bolt, F-Bracket etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 57 | Work of Erection of ACSR Weasel Conductor with All Accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 58 | Work of Carriage & Erection ofLT AB Cable (1x25+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Pearcing Coonnector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 59 | Work of Carriage & Erection ofLT AB Cable (3x50+1x35 +1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Pearcing Coonnector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 60 | Work of Carriage & Erection ofLT AB Cable (3x95+1x35 +1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Pearcing Coonnector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. |
| 61 | Work of Dismantling & Carriage Charges of Old Line, Doble Pole, S/S, Old PCC Pole (Acording to Pole) form Site to store centre Sahupuri/Rajatalab. |
| 62 | Work of Re-Jointing and Bindding of Cable Connection After Disconnection. |
| 63 | Work of Erection of Existing 10 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. |
| 64 | Work of Erection of Existing 25 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. |
| 65 | Work of Erection of Existing 63 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. |
| 66 | Work of Erection of Existing 100 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. |
| 67 | Work of Carriage & erection of 11KV I/D, O/D Cable Jointing kit 3x120 from store center Shahupuri/Rajatalab to work site as per RESSPO standerd. |
| 68 | Work of Carriage & Erection of Earthing with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 69 | Work of Carriage & Erection of Stay with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 70 | Work of Stay grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 71 | Work of pole grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |