Work Of Shifting Of Poles And Transformer Of Prabhupur Rasoolpur Ramgarh Sadhann Badgawa Marg Of Pwd Under The Deposite Scheme In The Edd-Sakaldiha. - Centralized Materials 2 PCC Pole 8.5 Meter Long 3 ACSR Weasel Conductor 4 ACSR Dog Conductor 5 11KV Pin Insulator with Pin 6 11KV Disc Insulator with Fitting 7 LT ABC (1x25+1x16)sqmm 8 LT ABC (3x50 + 1x35 + 1x16) sqmm 9 LT ABC (3x95 + 1x35 + 1x16) sqmm 10 11KV XLPE (3x120) sqmm 11 I/D and O/D Cable Jointing Kit Sutable for 11KV 3x120mm2 XLPE Cable 12 G.I. Wire 13 Stay Complete 14 Earthing Complete 15 G.I. Barbed wire 16 T-Off Channel 17 33KV Pin Insulator set 18 33KV Disc Insulator set 19 Three Phase Distirbution Box 20 11KV V type Steel X-Arm 21 G.I. wire for Guarding@22KG per Pole 22 Gaurding Angle 23 Decentralized Materials 24 G.I. Pipe Dia 6 inch 25 F Clamp 26 Clamp for T-OFF 27 Clamp with Nut & Bolt 28 LT PVC Un-Armoured 4x16 Cable sqmm 29 Three Phase Distirbution Box Clamp 30 Pearcing Coonnector 31 Stone Pad 32 F-Clamp, Nut & Bolt 33 Stay Clamp 34 Stay Clamp STP 35 I Hook Suspension Set 36 Deadend Set 37 L.T. Clamp for PCC Pole 38 X-Arm Clamp 39 Danger Board 40 Clamp for Double Pole 41 X-Arm Clamp of STP Pole 42 D/P Clamp of STP Pole 43 10 KVA T/F Clamp 44 Labour & Erection Charges 45 Work of carriage of 8.5 meter PCC pole along with loading/unloading from store center Shahupuri / Rajatalab to work site as per RESSPO standerd. 46 Work of Erection of 8.5 meter PCC pole with digging & Fitting with all Accessories (X-Arm, Pin Insuletor, Disc Insuletor, T-Off, T/F Base, Top Channel, Droper Angle, D.O. Fuse Set, G.I. Pipe 6 Dia, Holding Clamp with Nut & Bolt, F-Bracket, Barbed Wire, Danger Board, Garding wire, Guarding Angle etc.)as per RESSPO standard. 47 Work of Carriage of11KV XLPE Cable 3x120 sqmm from store centre Sahupuri/Rajatalab to site as per RESSPO standard. 48 Work of Cable Laying of 11KV XLPE 3x120sqmm Cable After digging & Making of Cable Trench Method (Sand, Brick & Stone Slab be provided by contractor) Including Loop as per RESSPO standared. 49 Work of Cable Laying in Air with Proper Pole Fixing of 11KV XLPE Cable 3x70 / 3x120 sqmm as per RESSPO standared. 50 Work of Carriage of 25 KVA Transformer with loading/unloading from store center Shahupuri / Rajatalab to work site as per RESSPO standerd. 51 Work of Carriage of 63KVA Transformer with loading/unloading from store center Shahupuri / Rajatalab to work site as per RESSPO standerd. 52 Work of Maunting 25 KVA Transformer on D/P and Energizing with all Accessories (Lug, Cable) after installation as per RESSPO standard. 53 Work of Maunting 63 KVA Transformer on D/P and Energizing with all Accessories (Lug, Cable) after installation as per RESSPO standard. 54 Work of Carriage of ACSR Weasel Conductor with All Accessories(X-Arm, Pin Insuletor, Disc Insuletor, T-Off, T/F Base, Top Channel, Droper Angle, D.O. Fuse Set, G.I. Pipe 6 Dia, Holding Clamp with Nut & Bolt, F-Bracket, Barbed Wire, Danger Board, Guarding wire etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. 55 Work of Erection of ACSR Weasel Conductor with All Accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. 56 Work of Carriage of ACSR Weasel Conductor with All Accessories (X-Arm, Pin Insuletor, Disc Insuletor, T-Off, T/F Base, Top Channel, Droper Angle, D.O. Fuse Set, G.I. Pipe 6 Dia, Holding Clamp with Nut & Bolt, F-Bracket etc.) including loading & unloading from store centre Sahupuri/Rajatalab to work site. 57 Work of Erection of ACSR Weasel Conductor with All Accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. 58 Work of Carriage & Erection ofLT AB Cable (1x25+1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Pearcing Coonnector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. 59 Work of Carriage & Erection ofLT AB Cable (3x50+1x35 +1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Pearcing Coonnector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. 60 Work of Carriage & Erection ofLT AB Cable (3x95+1x35 +1x16) sqmm Fitting with All Material (Suspension Clamp, 3 Phase Districution Box, Dead End Clamp, Pearcing Coonnector etc.) from store centre Sahupuri/Rajatalab to site as per RESSPO standard. 61 Work of Dismantling & Carriage Charges of Old Line, Doble Pole, S/S, Old PCC Pole (Acording to Pole) form Site to store centre Sahupuri/Rajatalab. 62 Work of Re-Jointing and Bindding of Cable Connection After Disconnection. 63 Work of Erection of Existing 10 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. 64 Work of Erection of Existing 25 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. 65 Work of Erection of Existing 63 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. 66 Work of Erection of Existing 100 KVA Transformer with loading/unloading from Existing Site to Praposed site as per RESSPO standerd. 67 Work of Carriage & erection of 11KV I/D, O/D Cable Jointing kit 3x120 from store center Shahupuri/Rajatalab to work site as per RESSPO standerd. 68 Work of Carriage & Erection of Earthing with loading & unloading from store centre Sahupuri/Rajatalab to work site. 69 Work of Carriage & Erection of Stay with loading & unloading from store centre Sahupuri/Rajatalab to work site. 70 Work of Stay grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. 71 Work of pole grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard.