| 1 | Clearing shrub jungles and uprooting stumps of bellow 90cm for pre-measurement and depositing the samesupplying all labour and T&P required for the work . etc. complete in all respect as directed by the Engineer-in-Charge. |
| 2 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth gravel and moorum etc interpread eith boulder upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from thework site as per the specification and as directed by the Engineer-in-charge. |
| 3 | Cement Concrete M15 grade with20mm anddown graded hard granite crusher broken chips of approved quality free from weathered skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level,compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period with cost,conveyance,hire and running charges of all machineries,royalty and other taxes of all materials supplying all labour,T&P materials required for this item (Excluding cost ofreinforcement if provided) etc. complete in all respect as directed by the Engineer-in-Charge. |
| 4 | Cement Concrete M20 grade with20mm anddown graded hard granite crusher broken chips of approved quality free from weathered skin materials mixing by concrete mixer including hoisting lowering and laying the concrete in position to proper slope and level, compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering,curing for required period with cost,conveyance,hire and running charges of all machineries, royalty and other taxes of all materials supplying all labour,T&P materisls required for this item (Excluding cost ofreinforcement if provided) etc. complete in all respect as directed by the Engineer-in-Charge. |
| 5 | Supplying, Straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18 to 20gauge and fixing of reinforcement including lapping where necessary with all leads, lifts from bending yard to placement spot including cost,conveyance and all other taxes of reinforcementsupplying all labour and T&P required for the worketc. complete in all respectas directed by the Engineer in charge. |
| 6 | Providing Rigid and smooth centering & shuttering for R.C.C works including false works and dismantaling them after casting including cost of materials supplying all labour and T&P required for the work etc. complete in all respectas directed by the Engineer in charge. |
| 7 | Providing rigid and smooth shutteringwith box type steel shuttering plates with keys for intermediate Construction Jointsfor C.C/R.C.C work and dismantling them after casting with all cost conveyance of materialssupplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer-In-Charge. |
| 8 | Providing 100mm dia weep holes in Brick Masonary / plain / reinfroced concrete abutment, retum with 1v 20H including cost & conveyance of all materials to site all complete supplying all labour and T&P required for the work etc. complete in all respectas directed by the Engineer in charge. |
| 9 | Filling in foundation and plinth with excavated earth including watering and rammingsupplying all labour and T&P required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 10 | Dismantlingand removing Cement concrete including stacking useful materials for reuse and removing the debris within 50m lead complete in all respect incuding cost, conveyance of all materials with supply of all labour and T&P required for the worketc. complete in all respect as directed by the Engineer-in-charage. |
| 11 | Excavation of any approved type soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil with allleads and lifts . on properly prepare and scientifically approved surface including spreading and levelling the earth in 20.50Cm. laying to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all hights including construction, mainteance, watering and lighting of haul road and borrow area supplying all labour and T&P required for the work etc. complete as per the direction of Engineer in charge. |
| 12 | Rough stone dry packing in approns and revetments to all heights with hard granite stone with size 30 cm and aboveof approved quality quarried and free from weathered skin including filling interstices with small stones with cost, conveyance, royalty and other taxes of all materials required for the work and finished to proper slope and levelsupplying all labour and T&P required for the work etc complete in all respect as directed by the Engineer-in-Charge. |
| 13 | Watering earth work upto OMC condition by sheep foot roller and dozer in layers not exceeding 22.5cm to required density including hire and running charges of all the machineries complete supplying all labour and T&P required for the work etc. complete as per the direction of Engineer in charge. |
| 14 | Removing old revetment and approns and repacking with old H.G stoneetc. complete supplying all labour, T&P required for the work etc. complete in all respect as directed by the Engineer in charge. |
| 15 | Fine dressing & turfing the slopes of dams and dyke and earth works in canal banks with compacted dub grass sods with all lead and lift including periodical watering and ramming till survival of sods with all labour & T&P required for the item complete as directed by the engineer in charge. |
| 16 | Collecting , Supplying, stackingand conveying from stacks good quality of laterite moorum admixing sand to proper camber with compaction with with HRR and including watering, cost , conveyance,royalty, watering charges and other charges of materials complete etc supplying all labour and T&P required for the work etc complete in all respectasdirected by the Engineer -in charge. |