Tender For New room with verandah and other construction work in Government Higher Secondary School Seva Ki Dhani Raopura in Village Panchayat Govindpura Basadi - 1 Excavation of soil upto 1.5 m depth in foundation, trench, drain, tamping the bottom, pouring water, beautifying the sides, taking out the excavated soil, filling the empty spaces with soil again after filling the foundation and disposal of the remaining soil upto a distance of 50 meters. 2 In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken)/stone soil in cement-sand mixture in the ratio of 1 cement : 4 sand : 8 aggregate and tamping, including tamping. 3 Laying of stone in foundation and plinth in cement-gravel mixture, including closing the side gap and tamping etc. Cement gravel 1:6 4 Foundation and plinth masonry of first class brick in cement-gravel 1:6 or 1:8 mortar, including closing of side cracks and grouting. 5 If second class brick is used, reduction in rates of above items 6 Cement concrete 1:1.5:3 mixture, pouring and supply of reinforced cement concrete, pressing in roof slabs, eaves, beams, lintels etc., grouting and leveling of surface with 1:3 cement mortar etc. including scaffolding but cost of steel and shuttering separately. 7 Centering Shuttering (planking and rigging) for laying RCC roof, slab, balcony, lintel etc. upto 4.5 m height and removal etc. as per specifications. Shuttering ply 8 Cutting, bending and fixing of iron for RCC work and fastening work including supply. 9 Cement concrete 1:2:4 mixture of 1 cement 2 gravel 4 stone or brick aggregate of 12 m in thickness including mixing, pouring, tamping, compacting and tamping etc. 10 Stone aggregate (crusher broken)/ brick aggregate of 40 mm nominal size in cement concrete foundation cement sand mortar in the ratio of 1 cement : 6 sand : 12 aggregate, mixing, pouring and tamping, tamping (As per IS code 7272 and 10067) 11 Polished Kota stone flooring over 1:4 cement gravel mortar of 20mm thickness, applying and grinding of scutting (minimum 3 times) and filling the joints with cement slurry and joining etc. 12 Cement plaster on wall using cement-gravel mixture in 1:6 ratio, scraping the joints and regular drying for 14 days. 20mm 13 Supply and installation of factory made solid core, single ply 30mm door with commercial ply on both sides, beading of edges, with bolts, two latches and two handles, with the help of 3 enamelled hinges. Analysis for 1X2 sq.m. door. 14 Analysis of double ply 125 X 75 mm 8 meter for door frame. 15 Providing and fixing steel glazed doors windows and ventilator shutters of standard rolled steel section joints mitred and welded with steel lugs 13*3 mm] 10 cm.long embedded in cement concrete block 15*10*10cm. Of 1%3%6 (cement : 3 corase sand % 6 graded stone aggregate 20mm nominal size ) or with wooden plugs and screws oe rawl plugs and screws with fixing clips or with bolts and nuts as required including providing and fixing of plain glass panes 4 mm thick with cooper glazing clips and specipal metal beading with screws complete including priming coat of approval steel primer excluding the coat of metal beading and other fitting except necessary hinges of pivots steel handles peg stay etc.as required window fixed supplying and fixing fixed wire gauge of 14 mesh *24 gauge to the metal frame of rolled section by metal beading 20*3 mm with suitable screw at not exceeding 150mm distance 16 bukfey isaV dk ysi djuk 3 rg esa rkfd bdlkj vkHkk gks tk;s u;s dk;Z ij 17 Iron work in grills/gates etc. including cutting, mounting and fitting of flat cones, Tees and corrugated (channels) etc. 18 Distempering with oil bound washable distemper of approved brand and manufacture to given an even shade including all scaffolding new work (two or more coats over and including scrapping and primimg coats with cement primer 19 feêh dk dk;Z dVkbZ es] 1-5 eh mBku dj 50 eh- fuLiknu rFkk Mkx osy yxkuk] gksnk es dsEcj] xzsM yxkuk rFkk fuLikfnr feêh dks lery rFkk njslh djukA l[r feêh esA 20 1:4:8 40 mm. In place of crushed stone ballast, if hand broken road is used, the same amount will be payable but 30% deduction will be made in the rate. 21 Under edge block of 80 mm thickness, cement concrete block made of 1:1.5:3 or stone block whose thickness will be 20 cm, height 40 cm and the top edge of the block will be rounded. In place of block, block of the same size manufactured at the spot will also be acceptable. In case edge block is not placed at the spot, deduction should be made at the rate of 0.08 cubic meter of cement concrete per running meter. 22 Mixing, pouring and needle and surface application of controlled concrete on the upper surface of cement concrete road Operating vibrator and preparing desired grade, camber and super elevation for non-slippery surface! 1:2:4 23 p & f electricity light fitting and sanitary works 24 Add 2% Contigency