Tender Construction Of Pre-Engineered Shed For Engine Dismantling & Chemical Cleaning Process And Associated Works On Design And Build Basis (Epc Mode) At Engine Division, Beml Limited, Mysuru.; 1 Cement M/s ACC/Ultratech/Birla 2 Ready Mix Concrete M/s Ultratech/ RMC India /M PRO RMC/Nuvoco Vista/ L&T/Coromandel 3 Paints M/s Asian Paints/Berger 4 Reinforcement steel M/s Sail/Tisco/Tata 5 CPVC Pipes M/s Finolex/Supreme/Astral/Ashrivadh 6 GI pipes M/s Tata/Zenith 7 PVC M/s Finolex/Supreme/Prince 8 White cement M/s Birla/JK 9 Gully trap/Nahani trap M/s Supreme/Finolex 10 Waterproofing compound M/s. Fosroc/Roff/BASF 11 Mirror/Toughened/beveled glass M/s Saintgobain/Modiguard 12 Ceramic/Vitrified tiles M/s.Johnson/ Kajaria/ Nitco/RAK/Somany 13 Gypsum Board M/s India Gypsum/Armstrong/Saintgobain 14 Ply wood/Block Board M/s Archid/Greenply/Century/Kitply. 15 Laminate/Veneer M/s Archid/Greenply/Century/Kitply. 16 Door closure M/s Everite/Dorma/Ozone 17 Locks, mortice locks M/s. Godrej/Europa 18 Plumbing fittings (Brass Chromium Plated Plumbing fittings) M/s Parryware/Hindware/ESS ESS/Cera/Jaquar 19 Sanitary Fittings (EWC/IWC/Washbasin) M/s Jaquar/Hindware/Parryware/Cera 20 Galvalume sheet M/s Tata bluescope/JSW/LLYOD (India) 21 Polycarbonate sheet M/s Danpalon, Alcox, Polygal, V.A Corporation, Alfa, GE, Lexon, Tuftile 22 CCTV Camera M/s Hikvision/Sony/Panasonic/Samsung 23 PVC Tank M/s Sintex/Ganga/Kaveri 24 FR PVC Copper wires M/s Finolex/Anchor/Roma/Havells/Polycab 25 MCB’s/MCCB’s /ELMCB’s/Industrial Switches/Electrical panels M/s L&T/ABB/Legrand/Schneider/Merlin Gerin 26 XLPE power cable M/s Anchor Roma /Finolex /Havells/Crabtree/ABB/Schneider/Polycab 27 Modular Switches/Sockets M/s Anchor/Roma/Havells/Crabtree/ABB 28 Grid false ceiling M/s Armstrong 29 LED Light Fittings M/s Crompton Greaves/Philips/Wipro 30 Electrical panel/Control switch M/s L&T/ABB/Legrand/Schneider/Merlin Gerin; 1 SHED – ‘A’: Design and Construction of Pre-Engineered Building (As shown in Plan – A vide Page 18) made out of rolled structural steel fabrication with RCC footing, pedestals & columns with eve height as 7.0 Mtrs and Crane girder for 5 Ton crane with suitable support and block work masonry all-round the building superstructure masonry wall upto 1.00 Mtr height. The building shall be provided with all-round GI sheet cladding, required door opening, required ventilator opening with weld mesh covering, electrical work, roof turbo ventilator, rain water down taking system etc., in Design and build basis (EPC mode) as per the scope of work mentioned in Technical Bid. Note: The plinth area on finalized dimension of the building shall be considered for all contractual/payment purposes. Sqm 225.00 2 Roof Covering – ‘B’: Design and Construction of Roof covering (As shown in Plan – B vide Page 18) made out of rolled structural steel fabrication of purlins with Galvalume sheet covering between existing & new sheds. The shed shall be provided with electrical work, rain water down taking system etc., in Design and build basis (EPC mode) as per the scope of work mentioned in Technical Bid. Note: The finalized dimension of the roofing area shall be considered for all contractual/payment purposes. Sqm 66.00 1 a) Basic Engineering: The Contractor shall carry out the preliminary survey for setting out of building and finalize the dimension (eve height shall be 7.0 Mtr) of the PEB based on the area available for execution. The contractor shall submit the final drawing (plan, elevation & section) of PEB and the plinth area details to BEML for future contractual/payment purposes. The orientation of all the building, all allied required works etc., has to be planned in such a way so that, optimum utilization of land with adequate ventilation & light is achieved. b) Soil investigation for economical & sound design of foundation, Structural members and PEB Structure. The soil investigation shall be carried out by a professional firm. The copy of report shall be submitted to BEML 5% 5% 2 Complete Design / Calculations & Detailed Engineering & On submission of proof check of design & drawings by Government Institute like IIT’s / NIT’s / IISc. After getting the proof checking done the contractor shall submit corrected and final structural design, BOQ (for monitoring of work progress), drawings in two set of hard copies and soft copy. 5% 10% 3 Completion of foundations and upto plinth level for PEB. 10% 20% 4 Completion of Superstructure above plinth, Masonry wall including plastering (Internal & External) 10% 30% 5 Erection of PEB Structure viz., columns, purlins, roof truss, bracings and other related works 20% 50% 6 Completion of roof sheet and cladding galvalume sheet, Poly carbonate sheet (sky light), wind turbine ventilators, Roof gutters and rain water down take pipes 20% 70% 7 Completion of VDF flooring inside PEB hangar including electrical cable duct 10% 80% 8 Completion of supply, installation, commissioning & testing of electrical work viz., panel, wiring, electrical sockets, light fitting & fixtures, 10% 90% 9 Completion of Finishing works viz., internal & external painting works of building, & submission of as-built drawings & handing over the project 10% 100%