| 1 | Earth work excavation of Foundation in hard soil within initial lead of 5km and initial lift of 1.50 km including rough dressing and levelling the bed of foundation etc all complete. |
| 2 | Fillingfoundation&Plinthwithsandwell watered and rammed cost,conveyance,royality etc all complete |
| 3 | Cement Concrete (1:3:6)using 4cmsize CBHG metal including cost,conveyance,royality etc all complete. |
| 4 | Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75kg/cm2with dimension tolerance+- 2percent in cement mortar(1:6) in foundation and plinth including cost,conveyance,royality and taxes etc all complete. |
| 5 | Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75kg/cm2with dimension tolerance+- 2percent in cement mortar(1:6) in Superstructure including cost,conveyance,royality and taxes etc all complete.Upto 3m. Height |
| 6 | Above 3m. Height |
| 7 | RCC work of M -20 gradewith20mm and down grade black hard granite crusher broken chipsincluding hoisting, cost, conveyance, royality and taxes and including centring, shuttering etc all complete.Column base |
| 8 | Plinth band |
| 9 | Grade Band |
| 10 | upto column and Beam column upto Pedestal |
| 11 | Above 5m. Height column |
| 12 | column |
| 13 | Lintel |
| 14 | wall Band |
| 15 | Roof Slab |
| 16 | Supplying , Cutting, Bending and binding and placing in position HSYD bars as per drawing and instuction of engineer in charge(1st Floor) |
| 17 | Supplying , Cutting, Bending and binding and placing in position HSYD bars as per drawing and instuction of engineer in charge |
| 18 | 20mm thick graded cement plaster in cement plaster(1:4) over roof slab including cost,conveyance,royality and taxes etc all complete. |
| 19 | Cement Concrete (1:2:4)using 12cmsize CBHG chips including cost,conveyance,royality etc all complete. |
| 20 | 12mm thick cement plaster in c.m (1:6) over brick or stone work including cost,conveyance,royality and taxes etc all complete.upto 3m. Height |
| 21 | Above 3m. Height |
| 22 | 16mm thick cement plaster in c.m (1:6) over brick or stone work including cost,conveyance,royality and taxes etc all complete.upto 3m. Height |
| 23 | Above 3m. Height |
| 24 | Priming one coat with any approved primer of wall primer over finished surface |
| 25 | Supplying fitting and fixing of MS shutter of approved design made out of MS angle and sheet of approved specification incluidng all cost labour carriage etc complete |
| 26 | Supplying fitting and fixing of steel ventilator glazed composite with MS grill outsied iron frame with glass pairs including supplying and fixing of putty & wire clips screw & nalls and cost of materials |
| 27 | Supplying fabrication fitting fixing & erection of MS tubular truss & purling including all cost conveyance etc complete |
| 28 | Manufacturing supplying (50mmX100mmX50mm) 5mm C channel purling runner and fender to plinth band (angular) including febrication and fixing in position including all cost etc as per direction of Engineer-in-charge |
| 29 | Painting two coat of enamel paint to the door and window over a coat |
| 30 | Cost supplying and labour for fixing of anticorrosive zinc aluminium alloy painted coloured steel roofing profile sheet of 0.45mm thick in roof of godown including fixing of ridge caps with fasteners of approved |
| 31 | Supplying fitting and fixing of holding down bolts (600mmX20mm) & base plate of 8mm thickness including all cost labour etc complete |
| 32 | Finishing wall with water proofing cement paints of approved shade on new work two coat to give an even shade as per 1 sqm upto 3mts height |
| 33 | above 3mts height |
| 34 | Wall painting two coat with weather coat painting of approved shade on new work to give an even shed per 1 sqmupto 3mts height |
| 35 | above 3mts height |
| 36 | Labour charges for fixing glass strips of depth 0.05m in joints in floor including cost of glass per 1 metre |
| 37 | Fixing of Vetrifiedtiles in floors treads or steps and landing on 25mm thick of bed of cement mortar(1:1) jointed with neat cement slury mixed with pigments to match the shades ofthe tiles including rubbing and polishing complete. |
| 38 | Fixing Vetrified tiles in dados skirting and risers of of steps on 12mm thick cement plaster(1:3) jointed with neat cement slurry mixed wit pigments to match the shades of the tiles including rubbing and polishing complete including cost of tiles. |
| 39 | Fixing of glazzed floor tiles of size 30cm X30cm in floors treads on steps and landing on 25mm thick bed of CM(1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete including cost of glazed floor tiles |
| 40 | Fixing of glazzed wall tiles of size 20cm X30cm in wall treads on steps and landing on 25mm thick bed of CM(1:1) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete including cost of glazed wall tiles |
| 41 | Cost supplying fitting & fixing of bathroom fibre door of approved make including fibre choukatha all GI fittings all cost conveyance taxes etc |
| 42 | Supplying fitting fixing of in position of MS Grill as per approved design with one coat of anti corrosive painting amd making good to the damage of wall or RCC or other structural complete including bending or cutting sizes or grooves with cost and conveyance of all material and labour with T&P required for the work taxes and royalties etc complete |
| 43 | Cost supplying fitting & fixing of pre cast concrete ventilators of size 0.38m X 0.25m |
| 44 | Cost of Brick Masonry Display Board of 5\"0\"× 0\"10\"× 5\"0\" size to be erected at worksite with colouring and painting writing with logo complete as per the direction of the Engineer-in-Charge. |