Pck.Xi.Cholapuram Pt 1.Renovation Of S.Facing 2 Class Room At Pues Cholapuram West In Cholapuram Pt Orathanadu Block Of Thanjavur District Under Sius Scheme 2025-26 , Part-01-Repairs To South Facing Pue School- Rcc Two Class Building Cholapuram West Aat Cholapuram Panchayat , Clean Removal Of Cement Plaster From Walls , Special Ceiling Plastering And Finishing The Exposed Surface Of All Rcc Items Of Work Such As Slabs, Beams, Sunshades, Facia, Canopy Slab, Staircase Waist Slab, Landing Slab Etc., With Cement Mortar 1:3 (One Cement And Threem.Sand) 10Mm Thick Including Hacking The Surfaces, Providing Cement Mortar Nosing, Beading For Sunshades, Staircases, Steps, Landing Slabs And Curing, Etc., In All Floors Complying With Standard Specification And As Directed By The Departmental Officers , Providing Granolithic Floor Finish Of The Following Thickness With Plain Cement Concrete 1:2:4 (One Cement, Two Crushed Stone M.Sand And Four Aggregate) Using 10 To 12Mm Gauge Hard Broken Stone Jelly Including Laying, Finishing And The Top Rubbed Smooth With Power Trawl, Thread Lining, Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. (The Rate Is Inclusive Of Necessary Planking For Panellingwherever Necessary And As Directed By The Departmental Officers) 25Mmthick , Plastering With Cement Mortar 1:5 (One Cement And Five M.Sand), 12Mm Thick In All Floors Including Curing Etc. Complete Complying With Standard Specification And As Directed By The Departmental Officers. , Pointing Roof Pressed Tiles With Cm 1:3 , Re Painting The Walls With Two Coats With First Class Quality Plastic Emulsion Paint Of Approved Colour Over A Priming Coat Including Thorough Scraping, Clean Removal Of Dirt. The Rate Includes Cost Of Brushes, Sand Paper, Plaster Of Parries, Putty Wherever Required And Neat Finishing Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officer (The Colour And Quality Should Be Got Approved By The Executive Engineer Before Use) , White Washing Two Coats With Freshly Burnt White Shell Lime In All Floors Including Cost Of Lime, Blue Powder Fevicol Type Gum, Brushes, Scaffolding Charges, Etc., Complete Complying With Standard Specification And As Directed. , Painting The Old Iron Works Two Coats With Syntactic Enamel Paint Of Approved Quality And Colour Including Ordinary Scraping Using Brushes And Neat Finishing Etc., Complete Complying With Standard Specification And As Directed By The Departmental Officer (The Colour And Quality Should Be Got Approved By The Executive Engineer Before Use) , Painting Two Coats With Approved Black Board Painting Including All Labour Charges Etc. , Electrical Arrangements , Ceiling Fan Sd 107 , Cfl Sd 80 , 15 Amps Plug Point Sd 38 , Tube Light (Led) Sd 88 , Cheppal Rack , Brikc Work In Cm 1:5 Mix Usihg Country Bricks Of Size 8¾X4¼x2¼ Including Cost And Conveyance And All Other Labour Charges Etc., Completed , Supplying And Fixing Of Cuddappa Slab For Cupboard Including Cost And Conveyance Of , Platering With Cm 1:5 Mix, 12Mm Thick Including Cost And Conveynace And All Laour Charges Etc., Completed , Painting The Walls With Two Coats Exterior Emulsion Paint Over One Coat Of Primer As Instructed Including Cost Of Materils And All Labour Charges Etc., Completed , Supply & Fixing Of 35Mm Thk.Single Leaf High Density Interior Grade Marine Plywood Shutters Pasted Both Sides 1.5Mm Thk.Laminate Approved Design With 35X12mm T.W.Lipping On All Edges With Necessary Adhesives And Cp Screws Complying With Standard Specification.The Cost Is Inclusive Of 1 No Cylindrical Lock,Handel,Tower Bolt ,Approved Equivalent Make Ss Ball Bearing Hinges Of Quivalent Make Of Aproved Make,2 No Floor Mounted Ss Door Stoper Ect.Complete As Per Drawing. Make: Kutty,Sharon, Trojan. Accesseorice Make: Dorma, Godrej.1.5Mm Thk Laminate Basic - Teacher Cupboard Door , Provision For Name Board Charges , Provision For Photo Charges , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. {Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package}