| 1 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(i) 15 cm av. Diameter |
| 2 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.(i) 15 cm av. diameter |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 4 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 5 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. |
| 6 | Supplying, fitting and fixing with ironnails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 7 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 8 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bags (minimum 21 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary eqiupments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of Nylon crate as per direction of the Enginees-in-Charge. NB:- Volume of each earth / sand filled bags should not be less than 0.0328 cum.Size of Nylon crate is 1 metre x 1 metre x 1 metre. a) Where boats are not necessary. |
| 9 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all means,including other incidental charges complete.Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate.” |
| 10 | Labour charges for filling HDPE bagswith filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 11 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 12 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:-Volume of earth / sand filled bags should not be less than 0.028 cum / bag. |
| 13 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. |
| 14 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, leveling as per direction of the Engineer-in-charge within a lead of.NB :- Measurement to be taken on the basis of stack measurement/pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.(For compensation for earth for land owned and arranged by conductor add Rs. 25.00 per m3 extra over rate of E/W for land owned/arranged by the department. Royalty charge on earth @ 29.00 per m3 & Cesses charges @Rs. 5.30 per m3(i.e. Rs. 15.00 per 100 cft) as per govt notification which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses.)2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. |
| 15 | A) Beyond 500 m and upto 1.00 km |
| 16 | B) Beyond 2.00 km and upto 3.00 km |
| 17 | C) Beyond 4.00 km and upto 5.00 km |
| 18 | Supply ofdifferent materialsas per Approved specification.Bricks / Jhama / Bats Sorted & stacked at site.(f) Brick bats. |
| 19 | Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats,from stack of worksite with all leads and liftsinwaterorspreadingthesameontheslopeofthebankof River / Sea or the slope of the embankment or in the River/ Sea bed to anuniformthicknessasper directionoftheEngineer-in-charge including cost of all accessories and other incidental charges.(a) Brick Bats |