1) Repairs of PUE school Twoclass room at (West facing ) in Melanagai habitation at Neduvakottai panchayat 2) Repairs of PUE school Twoclass room at (East facing ) in Melanagai habitation at Neduvakottai panchayat3) Repairs of PUE school two class room at (North facing ) in Melanagai at Neduvakottai panchayat 4) Repairs of PUE school Toilet East facing melanagaiat Neduvakottai panchayat 5) Repairs of PUE school Toilet Building 1 Westfacing Melanagai at Neduvakottaipanchayat 6) Repairs of PUE school Toilet Building 2 North facing Melanagai at Neduvakottaipanchayat 7) Repairs of PUE school Toilet Building Eastfacing Melanagai at Neduvakottaipanchayat Union at Tiruvarur District for the year 2025-26 SNo:2/RBIOCGS /MNG/2024-25; 1) Repairs of PUE school Twoclass room at (West facing ) in Melanagai habitation at Neduvakottai panchayat 2 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 3 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 4 Dismantling granolethic flooring thick including cost and conveynace and all laour charges etc., completed 5 Paving the floor with pre-polished concreteKottaStonetiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 6 Pressed tiles using size of 300 x 300 mm mix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 7 Pointing with cemet mprtor1:3 mix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 8 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 9 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 10 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 11 Provision for bala painting two coats with best approvede including cost of materils and all abour charges etc completed 12 Painting two coats old iron Painting using ready mixed enamel painting including cost of material and all labour charges etc completed 13 Provision for white Fibre Board 14 ProvisionNameboard Charges 15 Provision for Photography charges 16 2) Repairs of PUE school Twoclass room at (East facing ) in Melanagai habitation at Neduvakottai panchayat 17 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 18 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 19 Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 20 Dismantling the execting gronolethick floor including cost and conveyance and all labour charges etc., completed 21 Paving the floor with pre-polished concreteKottaStonetiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 22 Dismantling the execting Pressed tilesincluding cost and conveyance and all labour charges etc., completed 23 Finishing top roof with one course of machine pressed tiles size of 230mmx230mmx20mmmix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 24 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 25 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 26 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 27 Provision for bala painting two coats with best approvede including cost of materils and all abour charges etc completed 28 Painting two coats old iron Painting using ready mixed enamel painting including cost of material and all labour charges etc completed 29 Blackboard Painting two coats over oldcement plastered surface withbest approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete 30 Provision for white Fibre Board 31 Provision for spring pandal 32 Repair door and window 33 Light point 34 Tube light fitting 35 Plug point 36 Ceiling Fan 37 ProvisionNameboard Charges 38 Provision for Photography charges 39 Provision for chappal rack 40 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 41 Supplying and fixing following thickness of cuddapah slab for cupboard 42 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 43 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 44 Provision for Teacher cubboard 45 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 46 Supplying and fixing following thickness of cuddapah slab for cupboard 47 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 48 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 49 Supply and Fixing35 mm Thick single Leaf High densityinterior grade marine Plywood shutters Pasted both side 1.5 mm thick laminated Aproved design 50 Provision for students cubboard 51 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 52 Supplying and fixing following thickness of cuddapah slab for cupboard 53 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 54 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 55 Provision for chappal rack 56 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 57 Supplying and fixing following thickness of cuddapah slab for cupboard 58 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 59 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 60 Provision for Teacher cubboard 61 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 62 Supplying and fixing following thickness of cuddapah slab for cupboard 63 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 64 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 65 Supply and Fixing35 mm Thick single Leaf High densityinterior grade marine Plywood shutters Pasted both side 1.5 mm thick laminated Aproved design 66 Provision for students cubboard 67 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 68 Supplying and fixing following thickness of cuddapah slab for cupboard 69 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 70 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 71 3) Repairs of PUE school two class room at (North facing ) in Melanagai at Neduvakottai panchayat 72 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 73 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 74 Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 75 Dismantling the execting gronolethick floor including cost and conveyance and all labour charges etc., completed 76 Paving the floor with pre-polished concreteKottaStonetiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 77 Pointing with cemet mprtor1:3 mix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 78 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 79 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 80 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 81 Provision for bala painting two coats with best approvede including cost of materils and all abour charges etc completed 82 Painting two coats old iron Painting using ready mixed enamel painting including cost of material and all labour charges etc completed 83 Blackboard Painting two coats over oldcement plastered surface withbest approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete 84 Provision for white Fibre Board 85 Provision for spring pandal 86 Repair door and window 87 Light point 88 Tube light fitting 89 Plug point 90 Ceiling Fan 91 ProvisionNameboard Charges 92 Provision for Photography charges 93 Provision for Drinking arrngement 94 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 95 Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B 96 Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications 97 Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. 98 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 99 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 100 Providing granolithicfloor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. 101 Provision fordadooing walls plain glazed tiles of size 150x150x6mm 102 Provision for PVC Pipe,Tank and Tap arrangements 103 Provision for chappal rack 104 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 105 Supplying and fixing following thickness of cuddapah slab for cupboard 106 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 107 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 108 Provision for chappal rack 109 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 110 Supplying and fixing following thickness of cuddapah slab for cupboard 111 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 112 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 113 4) Repairs of PUE school Toilet East facing melanagaiat Neduvakottai panchayat 114 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 115 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 116 Provision for Antikids Tilesincluding cost and conveynace and all laour charges etc., completed 117 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 118 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 119 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 120 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 121 Repair to door 122 ProvisionNameboard Charges 123 Provision for Photography charges 124 5) Repairs of PUE school Toilet Building 1 Westfacing Melanagai at Neduvakottaipanchayat 125 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 126 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 127 Dismantling of ceiling plastering including all labour charges etc., 128 Ceiling Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 129 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 130 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 131 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 132 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 133 provision for door & window 134 provision for water supply 135 ProvisionNameboard Charges 136 Provision for Photography charges 137 6) Repairs of PUE school Toilet Building 2 North facing Melanagai at Neduvakottaipanchayat 138 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 139 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 140 Dismantling of ceiling plastering including all labour charges etc., 141 Ceiling Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 142 Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 143 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 144 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 145 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 146 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 147 Repairs to door 148 provision for water supply arrangment pipeline and tap connection 149 ProvisionNameboard Charges 150 Provision for Photography charges 151 7) Repairs of PUE school Toilet Building Eastfacing Melanagai at Neduvakottaipanchayat 152 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 153 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 154 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 155 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 156 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 157 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 158 Repairs to door 159 provision for spetic tank 160 ProvisionNameboard Charges 161 Provision for Photography charges