1) Repairs of PUE school two class room at (West facing ) -1 velugudi Habittaion Sithangudipanchayat2) Repairs of PUE school two class room at (West facing ) -2 velugudi Habittaion Sithangudipanchayat 3) Repairs of PUE school two class room at (South facing ) Sithangudi Habitation Sithangudipanchayat 4) Repairs of PUE school Toilet Building in south facing in velugudiat Sithanagudi panchayat5) Repairs of PUE school BoysToilet Building Sithanagudi in Sithanagudi panchayat 6) Repairs of PUE school GirlsToilet Building Sithanagudi in Sithangudi panchayatUnion at Tiruvarur District for the year 2024-25.; 1 1) Repairs of PUE school two class room at (West facing ) -1 velugudi Habittaion Sithangudipanchayat 2 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 3 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 4 Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 5 Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 6 Dismantling the execting pressed Tilesincluding cost and conveyance and all labour charges etc., completed 7 Finishing Top roof pressed tiles of size 230 m x230mm x 20mmmix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 8 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 9 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 10 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 11 Provision for bala painting two coats with best approvede including cost of materils and all abour charges etc completed 12 Painting two coats old iron Painting using ready mixed enamel painting including cost of material and all labour charges etc completed 13 Blackboard Painting two coats over oldcement plastered surface withbest approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete 14 Light point 15 Tube light fitting 16 Ceiling Fan 17 Provision for Gril gate 18 Repairs to window &door 19 Provision for whiteFibre Board 20 Provision for spring pandal 21 ProvisionNameboard Charges 22 Provision for Photography charges 23 Provision for chappal rack 24 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 25 Supplying and fixing following thickness of cuddapah slab for cupboard 26 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 27 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 28 Provision for chappal rack 29 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 30 Supplying and fixing following thickness of cuddapah slab for cupboard 31 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 32 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 33 2) Repairs of PUE school two class room at (West facing ) -2 velugudi Habittaion Sithangudipanchayat 34 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 35 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 36 Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 37 Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 38 Dismantling the execting pressed Tilesincluding cost and conveyance and all labour charges etc., completed 39 Finishing Top roof pressed tiles of size 230 m x230mm x 20mmmix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 40 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 41 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 42 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 43 Provision for bala painting two coats with best approvede including cost of materils and all abour charges etc completed 44 Painting two coats old iron Painting using ready mixed enamel painting including cost of material and all labour charges etc completed 45 Blackboard Painting two coats over oldcement plastered surface withbest approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete 46 Light point 47 Fan point 48 Tube light fitting 49 Ceiling Fan 50 Repairs to window &door 51 Provision for whiteFibre Board 52 Provision for spring pandal 53 ProvisionNameboard Charges 54 Provision for Photography charges 55 Provision for chappal rack 56 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 57 Supplying and fixing following thickness of cuddapah slab for cupboard 58 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 59 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 60 Provision for chappal rack 61 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 62 Supplying and fixing following thickness of cuddapah slab for cupboard 63 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 64 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 65 3) Repairs of PUE school two class room at (South facing ) Sithangudi Habitation Sithangudipanchayat 66 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 67 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 68 Platering with CM 1:3, mix, 10mm thick including cost and conveynace and all laour charges etc., completed 69 Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 70 Poiting with cement mortor 1:3 mix using burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete 71 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 72 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 73 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 74 Provision for bala painting two coats with best approvede including cost of materils and all abour charges etc completed 75 Painting two coats old iron Painting using ready mixed enamel painting including cost of material and all labour charges etc completed 76 Blackboard Painting two coats over oldcement plastered surface withbest approved best quality ofblackboard paint of approved colour over the existing priming coat etc., complete 77 Front sunshade GI sheet 78 Light point 79 Fan point 80 Tube light fitting 81 Ceiling Fan 82 Repairs to window &door 83 Provision for whiteFibre Board 84 Provision for spring pandal 85 ProvisionNameboard Charges 86 Provision for Photography charges 87 Provision for chappal rack 88 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 89 Supplying and fixing following thickness of cuddapah slab for cupboard 90 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 91 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 92 Provision for chappal rack 93 Brikc work in CM 1:5 mix usihg country bricks of size 8¾x4¼x2¼ including cost and conveyance and all other labour charges etc., completed 94 Supplying and fixing following thickness of cuddapah slab for cupboard 95 Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed 96 Distembertwo coats with best approvdeincluding cost of materils and all labour charges etc., completed 97 4) Repairs of PUE school Toilet Building in south facing in velugudiat Sithanagudi panchayat 98 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 99 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 100 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 101 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 102 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 103 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 104 Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including cost of material and all labour charges etc completed 105 Provision for New door 106 Provision for Water connection and pipeline connection work 107 ProvisionNameboard Charges 108 Provision for Photography charges 109 5) Repairs of PUE school BoysToilet Building Sithanagudi in Sithanagudi panchayat 110 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 111 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 112 Dadooing of wall tiles of size 305x305x6mm including cost and all other labour charges etc…completed 113 Paving the floor with pre-polished concrete ceramictiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 114 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 115 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 116 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 117 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 118 Provision forNew Door size .75x1.80 119 Provision forNew Door size .90x2.00 120 Provision for IWC 121 provision for water supply arrangment pipeline and tap connection 122 Provision for spectic tank cleaning 123 ProvisionNameboard Charges 124 Provision for Photography charges 125 6) Repairs of PUE school GirlsToilet Building Sithanagudi in Sithangudi panchayat 126 Dismantling the execting wall plastering including cost and conveyance and all labour charges etc., completed 127 Platering with CM 1:5, mix, 12mm thick including cost and conveynace and all laour charges etc., completed 128 Dadooing of wall tiles of size 305x305x6mm including cost and all other labour charges etc…completed 129 Paving the floor with pre-polished concrete ceramictiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers.(The make and brand of the tiles should be got approved by Executive Engineer before use on works)Using anti-skid tiles (Observed Data) 130 White washing two coats using shell lime including cost of materils and all labour charges etc., completed 131 Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 132 Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed 133 Painting two coats over old iron work using ready mixed enamel painting including cost of material and all labour charges etc completed 134 Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including cost of material and all labour charges etc completed 135 Provision forNew Door size .75x1.80 136 Provision for IWC 137 Provision for EWC 138 Provision for spectic tank cleaning 139 ProvisionNameboard Charges 140 Provision for Photography charges