Ame Of 2Nd Head Work Of Rlis At Anehosur Village Including Repair/Replacement/Refurbishment Electro Mechanical Equipments-- 1 3.00 Dismantling, Transportation, Assembling and Errection of Kinetic H42K 200 mm Dia Air valves etc., completge as per specification With All Lead and Lift As directed by the Engineer incharge of the work 2 3.00 Supply of Low pressure Flot balls valcanite coated seasoned wood for Kinetic 200 mm Dia Air vales etc. complete as per specification With All Lead and Lift As directed by the Engineer incharge of the work 3 3.00 Supply of High pressure Flot balls Rubber coated seasoned wood for Kinetic 200 mm Dia Air vales etc. complete as per specification With All Lead and Lift As directed by the Engineer incharge of the work 4 3.00 Supply of low Ressure Seat ring Natural Rubber for Kinetic 200 mm Dia Air vales etc. complete as per specification With All Lead and Lift As directed by the Engineer incharge of the work 5 3.00 Supply of cowel joint sporting ring for Kinetic 200 mm Dia Air vales etc. complete as per specification With All Lead and Lift As directed by the Engineer incharge of the work 6 20.00 Supply of M28 X 100 mm Nuts and bolts for Kinetic 200 mm Dia Air vales etc. complete as per specification With All Lead and Lift As directed by the Engineer incharge of the work 7 2.00 Supplying and fixing flange top and bottom for 200mm Dia k. Air vales 8 2.00 Dismantling, Transportation, Assembling and Errection of 1400 Dia Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 9 2.00 Supplying and fixing inside single door plate for 1400 Dia Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 10 2.00 Supplying and fixing Shaft bearing for 1400 Dia Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 11 2.00 Supplying and fixing disc seal for 1400 Dia Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 12 4.00 Supplying and fixing cotter pin for 1400 Dia Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 13 4.00 Supplying and fixing shaft Seal for 1400 Dia Butterfiy valve motorised 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 14 2.00 Supplying and fixing Disc Seal Ring (EPDM Rubber) for 1400 NB Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 15 2.00 Supplying and fixing copanion flange MS for 1400 NB Butterfiy valve motorised Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 16 10.00 Supply of SS bolts and nuts And washers Size M26X 75mm Material for butterfly valve and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 17 10.00 Supply of SS bolts and nuts And washers Size M20X 75mm Material for butterfly valve and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 18 10.00 Supplying and fixing of Reversing contractors, Thermo switch ,Close torque switch ,open tarqe switch , Close limit switch, open limit switch, space heater Termation Card, Electronic position transmitter ,for Actuator controls panel serviceing As per specification With All Lead and Lift As directed by the Engineer incharge of the work 19 2.00 Supplying and fixing of clutch fork Assembely.Counter gear ,O Ring and oil seal ,Clutch ring ,Grease EPO ,for Actuator motors serviceing As per specification With All Lead and Lift As directed by the Engineer incharge of the work 20 2.00 Supplying and fixing of End stop nut .travelling Nut .Clamping Nut .for Actuator motors serviceing As per specification With All Lead and Lift As directed by the Engineer incharge of the work 21 2.00 Dismantling, Transportation, Assembling and Errection of 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 22 2.00 Supplying and fixing inside single Disc plate for 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 23 4.00 Supplying and fixing Shaft bearing for 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 24 2.00 Supplying and fixing Body seat Ring for 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 25 4.00 Supplying and fixing Hinge pin pin for 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 26 4.00 Supplying and fixing Stop pin pin for 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 27 2.00 Supplying and fixing flug /Retainer for 1400 Dia Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 28 4.00 Supplying and fixing Spring for 1400 Dia Non Return valves 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 29 2.00 Supplying and fixing copanion flange MS for 1400 NB Non Return valves Head 30.00 Mtrs Discharge:4.70 Cumecs and As per specification With All Lead and Lift As directed by the Engineer incharge of the work 30 12.00 Supplying and fixing HRC Fuses 11/12 KV -3.15 Amps Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 31 2.00 Supplying and fixing CT PT Ratio: 100-200/5-5A Core-1 : 15VA-CL.1.0 Core-2: 15VA CL 5P10STR:26.3KA/1SEC BIL: 12KV/28/75KVP Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 32 10.00 Supplying and fixing of HRC Fuses Type:C-0 KV-11 Amps-150 Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 33 18.00 Supplying and fixing of Tripping Coil in 6.6 KV HT panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 34 24.00 Supplying and fixing 200A Switch fuses unit with interlock between 2 incomer in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 35 4.00 Supplying and fixing L.T.200A/5A core 1: Class 1 10VA .ID-60 Tape wound without mounting clamp in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 36 4.00 Supplying and fixing Ammeter-0-200/400A,96X96mm Class Analog Type CTR:250/5A in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 37 4.00 Supplying and fixing Voltameter -0-500/400A,96X96mm Class Analog Type in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 38 4.00 Supplying and fixing Voltmeter selector switch 4 Position-off,RY,BY,BR in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 39 8.00 Supplying and fixing MCCB 63A,3 pole MCCB With o/l And S/C and uv release protections in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 40 6.00 Supplying and fixing MCCB 25A,3 pole MCCB With o/l And S/C and uv release protections in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 41 6.00 Supplying and fixing MCCB 16 A,3 pole MCCB With o/l And S/C and uv release protections in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 42 6.00 Supplying and fixing MCCB 16 A,1 pole MCB 6A 230V AC in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 43 6.00 Supplying and fixing Thermostat 25-85 degree C 1NC,Stem Type in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 44 6.00 Supplying and fixing Spacer Heater 40W,230V AC in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 45 10.00 Supplying and fixing Switch socket 6A,230V AC ,50HZ piano Type 3 pin in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work 46 6.00 Supplying and fixing Switch socket panel Light 40W 230V AC incandescent Lamp in 415 V AC Switch yard panel Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work 47 8.00 Supplying and fixing of multi function meter 50MA to 6A 48 8.00 Supplying and fixing of Tripping coil 49 6.00 Supplying and fixing of Closeing coil 50 6.00 Supplying and fixing of MCB 51 6.00 Supplying and fixing of Digital Voltameter RY.YB.BR three phase 334V 52 6.00 Supplying and fixing of Digital Amps meter RY.YB.BR three phase 334A 53 4.00 Supplying and fixing of Master trip realy 110V DC/3M+2b/HRC 54 4.00 Supplying and fixing of trip circuit supervision realy 250V 55 1.00 Supplying and fixing of Motor protection relay 56 1.00 Supplying and fixing of voltameter 500 volt 57 1.00 Supplying and fixing of Amps meter 160 Amps 58 1.00 Serviceing of 32 Tonne EOT crain Transpade with all lead and lift and as directed by the engineer incharge of the work. 59 22.00 Supplying and fixing wire rope for 5 tonne Mono rail craine with all lead and lift and as directed by the engineer incharge of the work. 60 1.00 Repires of monorail crain Transpade with all lead and lift and as directed by the engineer incharge of the work. 61 12.00 Supplying Post insulator Clamp Single Lynx ACSR conductor 127/76mm etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 62 2.00 Rubber Hand gloves 15kV, SEAMLESS Confirming to ISS (Sample to be verified for seamless before approval) for electrical purpose etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 63 12.00 Supplying of Pad Clamps for Rabbit ACSR as per specification with all lead and lift and as directed by the engineer incharge of the work. 64 2.00 Supplying and fixing of Motor protection relay complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 65 2.00 Supplying and fixing of Master trip relays (lockout relay) complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 66 2.00 Supplying and fixing of Trip circuit supervision relay complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 67 2.00 Supplying and fixing of Feeder protection relay complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 68 8.00 Supplying and fixing of Indication lamps complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 69 4.00 Supplying and fixing of Push buttons complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 70 2.00 Supplying and fixing of Selector switches complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 71 2.00 Supplying and fixing of VCB closing and tripping coilscomplete as per specification with all lead and lift and as directed by the engineer incharge of the work. 72 2.00 Supplying and fixing of Current transformers (motor feeder) complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 73 2.00 supplying and fixing of Current transformers (Incomer feeder) complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 74 1.00 Unloading , removal of coupling, dismantling of pump Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work Discharge And Jyothi pump 3.75 Cumecs 75 1.00 Re-building of pump Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. Discharge And Jyothi pump 3.75 Cumecs 76 1.00 Supplying of Ratchet pin Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work.For Jyothi pump 3.75 Cumec 77 1.00 Supplying of Ratchet Cover Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work.For Jyothi pump 3.75 Cumec 78 12.00 Supplying of Journal Bearing Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the workFor Jyothi pump 3.75 Cumec 79 1.00 Supplying of SKF 29438E Bearing Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work For Jyothi pump 3.75 Cumec 80 4.00 Supplying of oil Re-taining Tube tube Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 81 1.00 Supplying of Thrust coller Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work For Jyothi pump 3.75 Cumec 82 1.00 Supplying of Coper cooling Coil with Nipple Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 83 1.00 Supplying of Deflector Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. For Jyothi pump 3.75 Cumec 84 1.00 Supplying of head shaft under stuffing box Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work.For Jyothi pump 3.75 Cumec 85 1.00 Supplying of Intermidiat shaft Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. For Jyothi pump 3.75 Cumec 86 12.00 spplying of parallel key for pump shaft Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work.For Jyothi pump 3.75 Cumec 87 10.00 Supplying of Spilt Gland Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work. (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 88 12.00 Supplying And fixing of Shaft distance Sleeve Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work For Jyothi pump 3.75 Cumec 89 12.00 Supplying of Spilt Ring Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work.(Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 90 1.00 Supplying of Transmission Bearing Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work For Jyothi pump 3.75 Cumec 91 1.00 Run out check for shaft Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work For Jyothi Pump 3.75 cumecs ) 92 25.00 Supplying And fixing O Ring Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 93 1.00 Supplying of Bowl bearing Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work.(Kirloskar pmp 4.75 Cumecs ) 94 1.00 supplying and fixing of Impler nut With All Lead and Lift As directed by the Engineer incharge of the work (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 95 1.00 supplying and fixing of Impler wearing and casing ring With All Lead and Lift As directed by the Engineer incharge of the work For Jyothi Pump 3.75 cumecs ) 96 24.00 Supplying And fixing Strengthing of Bearing spider Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work For Jyothi Pump 3.75 cumecs ) 97 12.00 Supplying And fixing of column pipe Holder MS Plate Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 98 1.00 Supplying And fixing Stainer Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work Jyothi Pump 3.75 cumecs ) 99 16.00 Supplying of Grub Screw Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Kirloskar pmp 4.75 Cumecs And Jyothi Pump 3.75 cumecs ) 100 1.00 Repair and Refurbishment of Pump Bowl Assembly includes welding of bowl, vanes, using suitable electrode, removal of damaged ribs and bushes etc., complete As per specification With All Lead and Lift As directed by the Engineer in-charge of the work For Jyothi Pump 3.75 cumecs ) 101 4.00 Supplying and fixing of Bearing Temprecture gauge Meter Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Kirloskar pmp 4.75 Cumecs ) 102 4.00 Supplying and fixing of Discharge gauge Meter Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work ( Jyothi Pump 3.75 cumecs ) 103 1.00 Efficiency improvement, Energy conservation and long term corrosion protection in pumping systems by way of Fluiglide coatings including Dry Compressed air @ 6 to 7 kg/cm2 & 350 CFM and By abrasive blasting as per SSPC SP 10 standard (SA 2.5) for surface preparation, Supply of the Fluiglide Series @ 1.2 mm DFT coating material, Application of the Fluiglide Series @ 1.2 mm DFT coating material on wetted parts of hydraulic components to the specified coating thickness, Dynamic Balancing of Impeller, Inspection of coating for Dry Film Thickness & Spark Test and conducting performance test for pump of make kirlosker Pumps complete with all leads and lifts, transportation charges, exclusive of all taxes and and as per the directions of Engineer In charge Charge ( Jyothi Pump 3.75 cumecs ) 104 1.00 Supplying and fixing of 2200 mm Dia Stainless steel Expansion joint with Limit rods bolts and Nuts for Raising main complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 105 2.00 Supplying and fixing of 200 mm Dia MS pipe with Flange for Drain connection complete as per specification with all lead and lift and as directed by the engineer incharge of the work. 106 1.00 Supplying and Fixing Thrust block(MS) As per specification With All Lead and Lift As directed by the Engineer incharge of the work 107 25.00 Supplying of SS bolt with nut washers size M40 x 135 mm Complete with all lead and lift as directed by Engineer incharge 108 30.00 Supplying of SS bolt with nut size M42 x 160 mm Complete with all lead and lift as directed by Engineer incharge 109 30.00 Supplying of SS bolt with nut size M50 x 170 mm Complete with all lead and lift as directed by Engineer incharge 110 30.00 Supplying of SS bolt with nut and washers size M45 x 170 mm for Complete with all lead and lift as directed by Engineer incharge 111 25.00 Supplying of SS bolt with nut and washers size M35 x 170 mm for Complete with all lead and lift as directed by Engineer incharge 112 8.00 Supplying of stud Rod size 30mm dia x 700 mm for Expantion joint Complete with all lead and lift as directed by Engineer incharge 113 6.00 Supplying and fixing for motor Bearing Temprecture gauge Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work(Crompton and Greeves motor of 1775 KW) 114 1.00 Supplying and fixing for motor Hot air Temprecture gauge Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Marthon motors 1200 KW) 115 1.00 Supplying and fixing for motor Cold air Temprecture gauge Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Marthon motors 1200 KW) 116 1.00 Supplying and fixing for motor Water outlet pressure gauge Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Marthon motors 1200 KW) 117 1.00 Supplying and fixing for motor Water flow meter gauge Material Cost etc complete as per specification with all lead and lift and as directed by the engineer incharge of the work (Marthon motors 1200 KW) 118 4.00 Supplying and fixing of self Locking Nut Brass complete as per specification with all lead and lift and as directed b0y the engineer incharge of the work. (Marthon motors 1200 KW) 119 4.00 Supplying Cable termination Kits Pot heads 1x1000 sq.mm UG cable size as per Technical as per specification with all lead and lift and as directed by the engineer 120 1.00 Supply and installation of Axillary DC supply system of approved make with battery charger cum DCDB with batteries for 110 A hour complete with all accessories. 121 5.25 Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded ( Fe-410 grade ) mild steel manifold pipe system of specified diameter and plate thickness with flanged inlets / outlets at specified locations for connecting pump delivary pipes and raising mains and provided with one coat 40 micron thick zinc rich epoxy primer painting and 3 coats of 100 micron thick each coat coal tar epoxy paint for inner surface and exposed outer surface including cost of all materials, machinery, labour, cutting, bending, welding, finishing, painting, conveying to spot, lowering, aligning, jointing, hydraulic testing at fabrication site and after laying andand jointing at specified testpressure etc.,complete as per specificationsand approved drawings with lead upto 1 km and all lifts ( excludingcost of thrust block for anchoring / encasing manifold pipe )