|
| 1 | Dismantlingbrickmasonryinlimeorcementmortarandstackingthematerilsasdirected with all leads, lifts etc. |
| 2 | Removing G.I. or A.C. sheet roofing including purlins, principal rafters etc. including sorting serviceableandunserviceablematerials,stackingthesameasandwheredirectedinthe compound including scaffolding etc. complete. |
| 3 | Providing and fabricating structural steel work in rolled sections like joists, channels, angles, teesetc.asperdetaileddesignanddrawingsorasdirectedincludingcutting,fabricating, hoisting,erecting,fixinginpositionmakingriveted/bolted/weldedconnectionswithout connecting plates, braces etc. andincluding one coat of anticorrosive paint andover ittwo coats of oil painting of approved quality and shade etc. complete. |
| 4 | Providing andfixing colourcoatedZincalume (R)AZ150(min150gms/sq.mt.totalon each side ) profiled sheets for roofing. The feed material is manufactured out of nominal 0.45 mm Base Metal Thickness ( BMT ) (0.5 mm TCT ), Hi-strength steel with min.550 MPa yield strength,metallichotdipcoatedwithAluminium-Zincalloy(55%aluminium 43.4%zinc 1.6% silicon) with COLORBOND ( R ) steel quality super durable polyester paint coat ( with inorganicpigment).Thepaintshallhaveatotalcoatingthicknessofnominal35um, comprising of nominal 25 um exterior coat on top surface and nominal 10 um reverse coat on back surface. Profile sheet shall have nom. 950-1050 mm effective cover width and nominal 25-30 mm deep ribs with subtle square fluting in the five pan at nominal 180-250 mm center- to-center.The endribshallbedesignedforanti-capillarygroove.andreturnleg.Thefeed material should have coil manufacturers product details marked a regular interval. Including fasteners with min. fastened with min. 25 um Zinc-Tin alloy coated, Hex head, self-drilling screw etc. complete. (weight of profile 4.52 Kilogram/ One Square Metre) |
| 5 | Providing secondclassBurntBrickmasonrywithconventional/I.S.typebricksincement mortar1:6insuperstructureincludingstrikingjoints,rakingoutjoints,wateringand scaffolding etc. Complete |
| 6 | Providinginternalcementplaster12mm thickinsinglecoatincementmortar1:4without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc. complete. |
| 7 | Providing internal cement plaster 20mm thick inSingle coats in cement mortar 1:5without neeru finish, to concrete, brick surface, in all positions including scaffolding and curing etc. complete |
| 8 | Providing and applying plastic emulsion paint of approved quality, colour and shade to old andnewsurfacesintwocoatsincludingscaffolding,preparingthesurface.(excludingthe primer coat)etc. complete. |
| 9 | Providing and applying two coats of exteriorweather shield paint of approved manufacture andofapprovedcolourtotheplasteredsurfacesincludingcleaning,preparingtheplaster surface ,applying primer coat ,scaffolding if necessary, and watering the surface for two days etccomplete. NOTE: ForItem One Number 15 to 18 prior approval of Superintending Engineer will be necessary |
| 10 | Providing and fixing board displaying information, such as \"Name of work, Tender cost, Name of Contractor, Work completion and liability period etc\", having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge |
| 11 | Total Figure Amount |
| 12 | Item No.11: Charges for testing of material in vigilance and quality control laboratory for paint (Drying Time) |
| 13 | Total Figure Amount |