| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)(a) With earth obtained from excavation of foundation. |
| 3 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quality)(a) Do - by fine sand |
| 4 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
| 5 | Cement concrete with graded jhama khoa (30 mm size) excluding shutteringIn ground floor and foundation. a) 6:3:1 proportion |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.b) River Bazree i) In ground floor |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution of bars, stirrups, binders etc. including supply of rods, initial strengthening and removal of loose rust (if necessary) cutting to requisite to length, hooking and bending to correct shape, placing in proper position and binding with 16 guage black annealed wire at every intersection, complete as per drawing and direction.a) For works in foundation, basement and upto roof of ground floor/upto 4m. i) Tor steel / Mild steel.a) In ground floor |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (Detaills will be in bill)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 9 | Brick work with Ist class bricks in cement morter(6:1) a) In foundation and plinth |
| 10 | 125 mm thick brick work with Ist class bricks in cement morter (4:1).i) In ground floor |
| 11 | Plaster ( to wall, floor, ceiling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface. Including thraoting, nosing and drip course where necessary. (Details in bill) |
| 12 | Supplying, fitting & fixing granite slabs 15mm to 18 mm. thick with uniform texture & without decorative veins in columns, wall, facia,rise etc. with 15 mm thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all materials, labours, scaffolding, staging, curing and roughening of concrete surface complete. [Using cement slurry at back side of granite @ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m]In ground floor |
| 13 | Neat cement punning about 1.5 mm thick in wall, dedo, window sills, floors, drains etc. DETAILS IN BILL |
| 14 | Lime punning about 3 mm thick with shell lime and stone lime (2:1).Details in Bill |
| 15 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidentalcharges but excluding the cost of primer. Two coats a) Normal Acrylic EmulsionDetails in Bill |
| 16 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface : With super gloss (hi-gloss) - Two coats (with any shade except white) Details in Bill |
| 17 | Anti - termite treatment to the outside of foundation with chemical emulsion by admixing chloropyriphos emulsifiable concentrate (1% concentration) with water by weight, drilling 12mm. Dia holes in conctete or masonry apron at an interval of 300mm. To a depth, of 300mm. or more as close to the plinth wall as possible and the chemical emulsion rate of 2.25 litres perlinear metrecomplete as per specification laid down in para 4.3.1.1 of codeI.S>-6313 (Part-III)-1981.Details in Bill |
| 18 | Supplying fitting fixing stainless steel railing….per metre 6.50 kg(app) |
| 19 | Installation of Biswa Bangla Globe |
| 20 | Installation of Glow Sign Board |
| 21 | Installation of Steel Chair |
| 22 | Electrical Installation charge @10% |
| 23 | Installation of 03 solar PV street light |
| 24 | Cost of 18% GST charge |
| 25 | Cost of Labour welfare cess 1% |