Tender For Providing Foundation Plinth For Enhancement Of Power Transformer Capacity From 1X25 Mva Into 1X50 Mva Etc., At Srmc 110 Kv Ss.; 1 Dismantling of PCC and clearing at site including cost of labour, all T&Ps, lead, lift etc., complete and as directed by the Engineer at site. 2 Earth work excavationhard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc.complete 3 Sand filling including cost of M-sand, filling charges, labour for watering and consolidation leads and lift etc., complete. 4 PCC 1:3:6, with 20 to 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. 5 Providing RCC 1:1.5:3 raft using20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects 6 Providing RCC 1:1.5:3using20 mm HBG metal withform work including cost of all material, lead, lift, etc., complete but excluding cost of all respects 7 Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, alllabour charges, lead, lift, etc. complete. 8 Fabrication & Assembling of template in position including the cost of materials labour, lead, lift, all T&Ps etc complete and as directed by the engineer at site etc complete. 9 Fabricating supply and fixing in position of 20 mm dia bolt & nut for equipment plinthsincluding the cost of materials labour, lead, lift, all T&Ps etc complete and as directed by the engineer at site etc complete. 10 PCC 1:2:4 with 20mm HBG m/c metal without form work for plinths and including cost of all materials, all labour, lead, lift, form work, all T&Ps etc., complete (But exculding the cost of steel reinforcement) 11 PCC 1:2:4, with 12 to 20 mm HBG m/c metal with form work above GL including cost of all materials, cement, all labour, lead, lift, etc. complete. But excluding the cost of steel reinforcement. 12 Plastering with CM 1:3-12mm thick for wall both interior and exterior faces including cost of all materials lead lift etc complete. 13 Colour washing two coat approved cement paint over white washing including cost of all materials, scaffolding, labour with all leads and lifts etc., complete 14 Supplying and laying of Pre cast RCC well rings for earth pit having inner dia 0.60 m, thick ness 75mm and 0.30m depth including cost of all materials, labour, curing placing in correct position, lead, lift, etc., complete and as directed by the Engineer at site 15 Supplying and fixing of MS angle including cost of metal ,labour all lead and lift etc . Complete.as per standard specification and as directed by the dept. Engineer at site