Tender For Repair And Restoration Of Anticipated Damages That May Be Caused By The Upcoming Monsoon Season 2024 In Various Sections (U) Esd Hpsebl Bharmour ( )-- 1 Supply Part 2 11 kV Disc Insulator complete set including Dead end clamps. Ball cleave eye socket etc. 3 11 kV Pin Insulators ( porcelain, 12 kV, 10 kN): 3 No. Per pole structure 4 33 kV Discs insulator String sets(comprising 3 No. Discs in each string: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Bend Stapples & straight Stapples etc.) 5 Cross-Arm {Channel Iron (100x50x5 mm), Length 2400 mm} 6 Cross-Arm {Channel Iron (100x50x5 mm), Length 2800 mm} 7 Cross-Arm {Channel Iron (100x50x5 mm), Length 4000 mm} 8 33 KV Stay Set complete I/Cc Stay Clamp 9 11 KV HT Stay Set Complete I/c Stay Clamp 10 LT Stay Set complete I/c Stay Clamp 11 Shackle Insulator and D-Iron 12 Nuts & Bolts Off sizes (Galvanized coated ) (preferably 16 mm or more ( with flat and spring washer ) 13 Erection Part 14 11 kV Disc Insulator Complete set including Dead end clamps, ball cleave eye socket etc. 15 11 kV Pin Insulators ( porcelain, 12 kV, 10 kN): 3 No. Per pole structure 16 33 kV Discs insulator String sets(comprising 3 No. Discs in each string: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Bend Stapples & straight Stapples etc.) 17 Cross-Arm {Channel Iron (100x50x6 mm), Length 2400 mm} 18 Cross-Arm {Channel Iron (100x50x6 mm), Length 2800 mm} 19 Cross-Arm {Channel Iron (100x50x5 mm), Length 4000 mm} 20 33 kV Stay Set complete I/c Stay Clamp along with stay wire 21 11 kV HT Stay Set Complete i/c stay clampalong with stay wire 22 LT Stay Set complete i/c stay clampalong with stay wire 23 Shackle Insulator and D-Iron 24 Nuts & Bolts Off sizes (Galvanized coated ) (preferably 16 mm or more ( with flat and spring washer ) 25 Erection of S/T pole 11 mtr long for (Double pole Structure ), a) Digging Of Pit, b) fxing of cross arm and A.I. bracing set earthingc)Fixing of Nuts & Boltscomplete in all respect. 26 Erection of S/T pole 11 mtr long for (Single pole Structure ), a) Digging Of Pit, b) fxing of cross arm and A.I. bracing set earthingc)Fixing of Nuts & Boltscomplete in all respect. 27 Erection ofS/T Pole 9 mtr longfor (Double pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate complete in all respect. 28 Erection ofS/T Pole 9 mtr longfor (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate complete in all respect 29 Erection ofS/T Pole 8 mtr longfor (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, complete in all respect. 30 Re-sagging of ACSR 6/1/3.35 & 6/1/2.59 mm²) Conductorincluding continous earth, stringing &Sagging andbinding with insulator complete in all respect. 31 Re saggingofGI Wire Guarding including earthing, as per requirement complete in all respect. 32 Re-erection of stay sets i/c digging of pit, ramming of pit, tightening & nozzeling of stay wire 33 Re-erection of tilted S/T Pole 9mtr long 34 Re-erection of tilted S/T Pole 8mtr long 35 Muffs with concerete filling