Tender For Construction Of A New Administrative Building For The Superintendent Of Police, Pune Rural Office At Chavan Nagar, Pashan Road, Pune. Request For Estimated Rates For This Work., Pune-Maharashtra
TDR : 49774747
Tender Notice
BOQ
Expired
Pune
Maharashtra
Tender For Construction Of A New Administrative Building For The Superintendent Of Police, Pune Rural Office At Chavan Nagar, Pashan Road, Pune. Request For Estimated Rates For This Work.
TECHNICAL SPECIFICATIONS - Name of Work :पोलीस अधीक्षक, पुणे ग्रामीण कार्यालयाची चव्हाण नगर, पाषाण रोड, पुणे येथे नविन प्रशासकीय इमारत बांधकाम करणे.” या कामाकरिता अंदाजपत्रकीय दर मागविणे.
Sl. No.
Item Description
1
FABRIC MESH Design, Supply, Fabrication and installation of Membrane Panels Including scaffolding. Membrane of Make Serge Ferrari/ Verseidag having High Tenacity Polyester 1100 Dtex multifilament Polyester with Low wick treatment for anticapillarity having minimum Weight of 460 g/m2. The Fabric should have Precontraint Technology with LEED and Green Guard certificate having 28%-50% openness porosity for Maximum Light Visibility with minimum Tensile Strength (Warp/Weft)-3300/3300 N/5cm, minimum Tear Strength (Warp/Weft)-700/700 N/5 cm. Fabric Flame Retardancy Rating to be Euro Class-Bs2, do, Micro Organism Resistance-Degree 0 Excellent EN ISO 846-A and Warranty of 10 years and Life span of 30 plus years with proven track record. The design complies with the requirements of BS and, EU Standards. The tension membrane structure shall include engineering design of structural members and accessory parts. Membrane system shall include PVC/PVDF coated Membrane Fabric, Clamps and tensioning hardware as per specification, drawings and engineers\" approval. Vendor to provide OEM certificate for authorisation. The Mesh must withstand its Self-load and windspeed resistance of upto 200kmph. Brackets to be fixed to the substructure or civil work considering the weathering effects. The Mesh facade to be connected to the brackets and MS Frames and sub structures. Steel of approx. 2.5kg /sqft should be considered. The entire system has to be backed up by a structural stability report from a Chartered Engineer. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on site. Work shall be carried out including all lead and lifts etc as directed by Engineer-in-Charge.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.