Tender For Athoor Block Of Works -Tn-05-93 Iyothee Thass Pandithar Habitation Development Scheme 2025 - 26; 1 Part 1 : Providing New Bore Well with motor for Burial Ground at Chellampatti H/O SitharevuEstimate Amount : Rs.4.00 Lakhs 2 Geophysical survey charges 3 Drilling of 6dia vertical bore well in over buder soil including labour charges for inserting of casing pipe. 4 Drilling of 6 dia vertical bore well in hard rock area as per the recommendation of hydrogeology including the rig transportation inserting of casting pipe and flushing etc., complete. 5 Supply of 200mm PVC Casing pipe Rs As per Is 12818/2010 6 Supply of New 7.5 HP submersible pumpset with panel board having duty of 50LPM X125M Head with ISI make (53122+20167) 7 40mm UPVC Column pipe 8 40mm GI hex Nipple 9 40mm GI coupling 10 40mm GI Elbow 11 40mm GI Union 12 40mm M.S clampset 13 Solvent cement 14 Supply of 4.0 sqm sub - cable 15 25mm PVC pipe for cable 16 25mm PVC bend 17 63mm PVC pipe for water line (6ksc) 18 63mm PVC pipe Coupler 19 63mm PVC Bend (6ksc) 20 63mm PVC Gatevalve 21 50mm GI pipe 22 50mm GI Coupler 23 1000 Litre Sintex 24 Construction of Water tank pedastal using brick masonry wall including cost of all charges 25 Errection of sunbersible Pumpset into boe well including fixing and joining cable with proper clamps into the level to required depth and also fixing the riser pipe to required depth panel board fitting, valve fitting and constrol equipment fitting, twin 26 Labour charges Providing of EB service main arrangementfrom EB post to pump room and fitting service pipe EB board wiring comple including 7/20 PVC overhead wiring main fuse unit GI wire and all meterials fixing complete. 27 Construction of EB service chamber including masonry works and cost of matrials complete and labour charges including cost ofMS door and frame setwith lock and key arrangements. 28 Providing of bore well pit protection arrangements using 8 MS pipe fitting complete orHandpump body bottam fixing charges 29 Earth work excavation hard stiff clay and hard rock earth and pipe laying , jointing and refilling the trench with excavation soils 30 For water line 31 Laying of the pipe line and jointing to Proper gradient and all labour charges etc. PVC pipe line 32 Laying of the pipe line and jointing to Proper gradient and all labour charges etc. GI pipe line 33 Providing Name board 34 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package} 35 Part 2 : Construction of Compound wall with Waiting shed,CremationShed and Approach road at Chellampatti H/O SitharevuEstimate Amount : Rs. 20.00 lakhs 36 Construction of Waiting shed 37 Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete 38 Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete 39 Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, 40 Brickwork in Cement mortar 1 : 5 mix using new II class bricks including cost and conveyance of all materials to site and labour charges etc complete. 41 Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations grade beams, raft slabs stair case steps, bed blocks, critical pier, etc beams roof slabs, using mild steelsheets of size 90 x 60 cm and 10 gouge stiffened, welded with steel angles of size 25 mm x 25 mm x 3mm for boarding laid over silver oak (country wood) joists of 10 cm size x 6.5 cms size spaced at about 90 cms center to center and supported causorina props of 10 cm to13 cms spaced at 75 cms to center to center etc., complete complying with standard specification and as directed (SI - 155)for column 42 For Slab and Beam 43 Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. 44 R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete 45 Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete. 46 Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete. 47 C.C. 1:2:4-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete 48 Painting two coats with approved Cement Paint over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications 49 Construction of Compound Wall 50 Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundationAs Per SS20 B 51 Supplying and filling in foundation and basement and trenches with FILLING M.SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. 52 CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. 53 Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. 54 Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle 55 REINFORCED CEMENT CONCRETE 1:1.5:3 mixusing 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in posit 56 Brick work in CM 1:5 mix using country bricks ground molded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. 57 PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications. 58 Painting two coats with rady mixed Plastic emulsion of First class quality paint and of approved colour over a priming coatby the departmental officersincluding cost & conveyance of all materials to site and all labour charges etc., complete. 59 Construction of Cremation Shed 60 Earthwork excavation for foundation in all clauses of soils and subsoils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, struting and bailing out water wherever necessary and refilling the sides of foundation. 61 Filling basement with excavated earth in layers not more than 15cm thick including all labour charges etc.,complete. 62 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifications and as directed. 63 Brickwork in C.M. 1:5 mix using country bricks ground moulded of size 23x11x7 cu.cm including cost and conveyance of all materials and all labor charges etc., 64 Supplying and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such as using mild steel sheets of size 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by casaurina props of 10 - 13cm dia spaced at 75cm c/c etc. complete. 65 Supplying, fabricatingand placing of mild steel or ribbed for steel rods and all RCC works as per the design given including cost steel and binding wire in all floors etc., & convayence of steel as per std. specificationand directed. 66 RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. 67 Cement Concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifications and as directed. 68 Plastering 1:3 mix to 10mm thick including cost and convayense of all materials and labour charges etc.., 69 Plastering with C.M. 1:5 mixusing 12mm thick including curing, cost and conveyance of all materials and all labor charges etc., complete 70 Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same mortar as per std., specifications etc., complete. 71 Providing Granolithic pattern floor finish with C.C. 1:2:4 mix using 10 to 12mm ISS metal including cost & convayance of all materials to site and all labour charges etc., complete 72 Plastic emulsion paintingtwo coats with approved colour including cost & convayance of all materials to site and all labour charges etc., complete 73 White washing two coats with shell lime including cost & convayance of all materials to site and all labour charges etc., complete 74 Providing Aproach Road 75 Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B 76 Cement Concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifications and as directed. 77 Cement Concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15 cm thick compacting etc., complete complying with std. specifications and as directed. 78 Bitumen pad 79 Provision for gate 80 Provision for Name board 81 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package}