| 1 | Construction of Cremation Shed in Arunthathiyar Mayanam at Kodangipatty Panchayat |
| 2 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with |
| 3 | Plain Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as perstandard specification. |
| 4 | Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification. |
| 5 | Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification. |
| 6 | Supplying fabricating and placing in position mild steel or ribbed steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete complying with standard specification |
| 7 | Reinforced Cement concrete 1:11/2:3 using 20mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams etc. shall be finished smooth with CM 1:3 12mm thick and with kraft paper without claiming extra etc. as directed by the Departmental officers complete complying with standard specification. |
| 8 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4\"x41/4\"x2\" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. |
| 9 | Plastering in cm 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 10 | Plastering in cm 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete |
| 11 | Painting two coat of Oil Bound Distember paint over wall plastering surface with best approved first quality of approved colour over the one coat of priming etc., complete complying with standard specification (The paint should be got approved by the departmental officers before use on works ) |
| 12 | Painting two coat of Plastic emulsion paint over wall plastering surface with best approved first quality of approved colour over the one coat of priming etc., complete complying with standard specification (The paint should be got approved by the departmental officers before use on works ) |
| 13 | Plain Cement Concrete 1:2:4 Using 20 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as perstandard specification. |
| 14 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |