| 1 | Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil and except hard rock requiring blasting including shoring, strutting, bailing water wherever necessary and all other incidental charges etc., complete as directed by departmental officers as per S.S.20B |
| 2 | Plain Cement Concrete 1:4:8 mix, (one part of cement, four part of sand andeight part of aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges etc., complete.as per standard specification 28 V,VI S25 |
| 3 | Supply and fabrication of steel using TMT rodsfor all Reinforced cement concreteworks including cost and conveyance of all materials and all labour charges for cutting, bending and placing the rod in position and tying up the rods with binding wire and other incidental charges etc., complete.as per standard specification SS 86 & 86A V,VI, VII (S6) 7,3 |
| 4 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part ofaggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications. TNDSS NO: 30 V, VI (S3), VII-3. materials and all labour charges for mixing, laying, compacting and curing the concrete and other incidental charges to site etc., complete.as per standard specification 28 V,VI S25 |
| 5 | Supply and erection of steel centering, shuttering for soffits and sides including necessary support strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3mm for boarding laid over Silver Oak joists of size 10cmx6.5cm space at 10cm c/cand supported by Casurino Prop 10cm-13cm spaced at 75cm c/c etc., complete and as directed by Departmental Officers. |
| 6 | Column Surface |
| 7 | Shuttering |
| 8 | Plain Surface |
| 9 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size9 ” x 4 3/8 “x 2 3/4 ”from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. |
| 10 | Plastering in C.M. 1:5 mix (one part of cement and five part of Sand) 12mm tk including mixing and finishing to a well smoothened surface, watering cost and conveyance all materials and all labour and other incidental charges and other incidental charges etc., complete.as per standard specification TNBPSS 56,57 |
| 11 | Plastering in C.M. 1:3mix (one part of cement and three part of Sand) 10 mm tk including mixing and finishing to a well smoothened surface, watering cost and conveyance all materials and all labour and other incidental charges and other incidental charges etc., complete.as per standard specification TNBPSS 56,57 |
| 12 | Supplying and filling in foundation andbasement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc.,complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification TNSS No. 24 & 25. |
| 13 | Plastering in C.M. 1:5 mix (one part of cement and five part of Sand) 20 mm tk including mixing and finishing to a well smoothened surface, watering cost and conveyance all materials and all labour and other incidental charges and other incidental charges etc., complete.as per standard specification TNBPSS 56,57 |
| 14 | Weathering course with concrete of broken Brick jelly in pure slacked lime over roof slab the proportion of brick jelly to lime being32 to 12.5well beated with wooden beaters for giving required slope& thicknessincludingcost and conveyance of all materials and labour charges and other incidental charges etc., complete as per standard specification |
| 15 | Finishing with top of roof with one course of machine pressed tiles of size 20cm x 20cm x 20cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with same water proofing compound mixed with cement motar ,red oxide, includingcost and conveyance of all materials and labour charges and other incidental charges etc., complete as per standard specification |
| 16 | Supplying and fixing over the floors best quality of scratch ceramic tiles of 30 c.m x 30c.m x 6mm sizeof approved colour laying with cement mortor 1:3 mix pointing the joints with colour pigments etc.Complete. |
| 17 | Wiring with 2x1.5sqmm (22/0.3) PVC insulated unsheathed SC Cu. Conductor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC Accessoires with TW switch box and 5A F.T. switch in flush with wall with 3mm thick hylum sheet cover for making good of the concealed portion with suitable colour for PVC concealed light point / fan point (For electronic regulator) (SD.NO.24) |
| 18 | Supplying and Fixing of single box type 4 x 20 W LED Light fitting complete with Electronic Choke and Teakwood Round blocks on wall or ceiling with fluorescent tube with PVC unsheathed copper leads from terminals to the fitting.[ PWD SOR Page No ; 168 Sl. No : M 1273 ] |
| 19 | Supply and fixing of 1200 mm (48\") sweep AC ceiling fan complete with stepped electronic 300W regulator, with 1 metre down rod with fan clamp with side plates and cross arm of size 450 mm (18\") (SD 106) |
| 20 | Supplying and fixing ofSteel door and gate using ISA Sections and MS Sheet ofapprovedqualityincluding cost andconveyance of all materials and labour chargesand other incidental charges to site etc., complete.as per standard specification |
| 21 | Painting two coats with Emulsion paint of approved colour and quality including cost andconveyance of all materials and labour chargesand other incidental charges to site etc., complete.as per standard specification |
| 22 | Painting two coats with Enamel paint of approved colour and quality including cost andconveyance of all materials and labour chargesand other incidental charges to site etc., complete.as per standard specification |