| 1 | Assistance for re-startup activities of main plant, which includes hose connections for purging and hydro/pneumatic tests, oil filling and draining and assistance in leak testing. |
| 2 | Assistance in sending consignment to other units, unloading and storing of chemical raw materials to designated locations. |
| 3 | Addition of chemicals to CT sump, Main plant and VSSP cooling water sump cleaning and material filling in vessels in main plant. |
| 4 | Lube oil and seal oil filters cleaning, liquid nitrogen unloading assistance in main plant. |
| 5 | Cleaning activities of D2O drums/ balloons and drums in new xylene shed in main plant. |
| 6 | Cleaning the entire equipment floor area of inside structure ofmain plant, Nitrogen unit, unit 26,unit 18, UGP,VSSP,oil console area, AARS control roomincluding cob web cleaning and disposal of collected waste material to designated location. |
| 7 | General Shift Office Assistance jobs includes movement of AVI/ work permit, file maintaining, scanning, Xeroxing etc. |
| 8 | Raw material shifting from storage area to SPP site.. |
| 9 | Process material handling during SPP operation like assistance in charging, aqeous draining, product withdrawal. |
| 10 | Assistance in sampling during the operationand lube oil top up in SPP. |
| 11 | Shifting of product in drums from SPP to storage area. |
| 12 | Cleaning of equipment floor area, cob web cleaning in SPP.. |
| 13 | SPP cooling water tower sump cleaning. |
| 14 | Assistance for POCl3 drums decontamination by chemical addition and washing for SPP.. |
| 15 | Salt removal from solar pan andcleaning for SPP. |
| 16 | Collection of solid waste from solar pan and storage at designated location in site. |
| 17 | Cost of material for 2025-26 Soft broom sticks - 24Nos,Hard broom sticks -24Nos, Soap Solution - 2000 liter, Cob webstick - 16Nos, Disinfectant liquid lizol brand - 20 liter,Mopping stick - 6 Nos. |